Mature Topics for Draft 0.1

Slides:



Advertisements
Similar presentations
2200 Mission College Blvd., Santa Clara, CA 95054, USA
Advertisements

WUR Negotiation and Acknowledgement Procedure Follow up
2200 Mission College Blvd., Santa Clara, CA 95054, USA
Vendor Specific WUR Frame
WUR Negotiation and Acknowledgement Procedure Follow up
High Level MAC Concept for WUR
2200 Mission College Blvd., Santa Clara, CA 95054, USA
2200 Mission College Blvd., Santa Clara, CA 95054, USA
Improve Scanning for Identifying Transmitted BSSID
Overview of ba Power Management in D0.4
Computation of TSF Update
Wakeup Frame Format Date: Authors: Sept 2017 Liwen Chu
Examples of Integrating WUR with Existing Power Save Protocol
Suggested Practice for SFD and Draft Spec Text Proposal
Vendor Specific WUR Frame Follow Up
Vendor Specific WUR Frame Follow Up
2200 Mission College Blvd., Santa Clara, CA 95054, USA
Operation after Wake-up Frame Transmission and Reception
Overview of ba Power Management in D0.4
Overview of ba Power Management in D0.4
2200 Mission College Blvd., Santa Clara, CA 95054, USA
WUR Action Frame Format Follow up
Operation after Wake-up Frame Transmission and Reception
Vendor Specific WUR Frame Follow Up
Indication for WUR Duty Cycle
Traffic Class Control in MBSS
Wakeup Frame Format Date: Authors: Sept 2017 Liwen Chu
Starting Time Indication of WUR Beacon and Duty Cycle Operation
Wake Up Response mode to WUR frame
Indication for WUR Duty Cycle
WUR Action Frame Format Follow up
Overview of ba Power Management in D0.4
Consideration of EDCA for WUR Signal
2200 Mission College Blvd., Santa Clara, CA 95054, USA
Discussion on Group ID Structure
WUR Action Frame Format
WUR Mode Operation Procedures
WUR Mode Operation Procedures
Vendor Specific WUR Frame Follow Up
2200 Mission College Blvd., Santa Clara, CA 95054, USA
WUR MAC and Wakeup Frame
2200 Mission College Blvd., Santa Clara, CA 95054, USA
WUR Mode Operation Procedures
Comment Classification for Draft 1.0
Comment Classification for Draft 1.0
Comment Classification for Draft 1.0
2200 Mission College Blvd., Santa Clara, CA 95054, USA
19, Yangjae-daero 11gil, Seocho-gu, Seoul , Korea
Comment Classification for Draft 2.0
Operation after Wake-up Frame Transmission and Reception
Operation after Wake-up Frame Transmission and Reception
Comment Classification for Draft 2.0
2200 Mission College Blvd., Santa Clara, CA 95054, USA
Traffic Class Control in MBSS
Comment Classification for Draft 2.0
Discussion on Group ID Structure
WUR Negotiation and Acknowledgement Procedure Follow up
2200 Mission College Blvd., Santa Clara, CA 95054, USA
Overview of ba Power Management in D0.4
Consideration of EDCA for WUR Signal
Indication for WUR Duty Cycle
Starting Time Indication of WUR Beacon
2200 Mission College Blvd., Santa Clara, CA 95054, USA
WUR Mode Operation Procedures
Comment Classification for Draft 3.0
WUR Negotiation and Acknowledgement Procedure Follow up
Comment Classification for Draft 3.0
Comment Classification for Draft 3.0
Comment Classification for Draft 3.0
Comment Classification for Draft 3.0
Presentation transcript:

Mature Topics for Draft 0.1 July 2008 doc.: IEEE 802.11-08/1021r0 Mature Topics for Draft 0.1 Date: 2017-11-09 Name Affiliation Address Phone Email Po-Kai Huang Intel 2200 Mission College Blvd., Santa Clara, CA 95054, USA   +1-408-765-8080   po-kai.huang@intel.com Po-Kai Huang et al. (Intel) Peter Loc

Abstract This document suggests mature topic for spec writing in Draft 0.1. Po-Kai Huang et al. (Intel)

Procedure Identify mature topic with related motions Produce SFD r6 based on the minute Chair sends email to call for Volunteer The email will include the reference of motions in SFD r6 for spec writing Volunteer prepares spec texts for the assigned motions based on the template in [3] Assigned motion will be included in the document Po-Kai Huang et al. (Intel)

Suggest PHY Topic for Spec Writing in Draft 0.1 R.3.1.A in SFD r5 (Prepended non-HT preamble) WUR Preamble All the motions related to WUR Preamble passed in Nov IEEE Meeting WUR Payload All the motions in 3.3 WUR Payload of SFD r5 All the motions related to WUR Payload passed in Nov IEEE Meeting Expect the spec texts to be filled in clause 32. Wake-Up Radio (WUR) PHY specification of [2] Po-Kai Huang et al. (Intel)

Suggest MAC Topic for Spec Writing in Draft 0.1 WUR Negotiation and WUR Mode All the motions in 4.2 WUR Negotiation of SFD r5 All the motions in 4.5 WUR Mode of SFD r5 All the motions related to WUR Action frame, WUR Mode Element, and WUR Mode passed in Nov IEEE meeting WUR Frame formats All the motions in 4.8 WUR Frame formats of SFD r5 All the motions related to WUR frame format passed in Nov IEEE meeting Expect the texts to be filled in the following clauses of [2] 9.4.1.11 Action field 9.4.2.262 WUR Mode element 9.4.2.263 WUR Capabilities element 9.6.31 WUR Action details 31.5 Power management with WUR mode 9.10 WUR frame formats Po-Kai Huang et al. (Intel)

Reference [1] 11-17-0575-05-00ba Spec Framework [2] 11-17-1585-00-00ba Proposed Draft Specification 0.0 [3] 11-17-1593-00-00ba Proposed text for Draft Specification Template Po-Kai Huang et al. (Intel)