Summary from last MB “The MB agreed that a detailed deployment plan and a realistic time scale are required for deploying glexec with setuid mode at WLCG.

Slides:



Advertisements
Similar presentations
Dec 14, 20061/10 VO Services Project – Status Report Gabriele Garzoglio VO Services Project WBS Dec 14, 2006 OSG Executive Board Meeting Gabriele Garzoglio.
Advertisements

CREAM: Update on the ALICE experiences WLCG GDB Meeting Patricia Méndez Lorenzo (IT/GS) CERN, 11th March 2009.
Jan 2010 Current OSG Efforts and Status, Grid Deployment Board, Jan 12 th 2010 OSG has weekly Operations and Production Meetings including US ATLAS and.
OSG Area Coordinators Meeting Security Team Report Mine Altunay 01/29/2014.
LHCC Comprehensive Review – September WLCG Commissioning Schedule Still an ambitious programme ahead Still an ambitious programme ahead Timely testing.
Status of WLCG Tier-0 Maite Barroso, CERN-IT With input from T0 service managers Grid Deployment Board 9 April Apr-2014 Maite Barroso Lopez (at)
SC4 Workshop Outline (Strong overlap with POW!) 1.Get data rates at all Tier1s up to MoU Values Recent re-run shows the way! (More on next slides…) 2.Re-deploy.
Apr 30, 20081/11 VO Services Project – Stakeholders’ Meeting Gabriele Garzoglio VO Services Project Stakeholders’ Meeting Apr 30, 2008 Gabriele Garzoglio.
PanDA Multi-User Pilot Jobs Maxim Potekhin Brookhaven National Laboratory Open Science Grid WLCG GDB Meeting CERN March 11, 2009.
Ian Bird LCG Project Leader LHCC Referee Meeting Project Status & Overview 22 nd September 2008.
Mar 28, 20071/9 VO Services Project Gabriele Garzoglio The VO Services Project Don Petravick for Gabriele Garzoglio Computing Division, Fermilab ISGC 2007.
MW Readiness Verification Status Andrea Manzi IT/SDC 21/01/ /01/15 2.
Pilot Jobs John Gordon Management Board 23/10/2007.
LCG Pilot Jobs + glexec John Gordon, STFC-RAL GDB 7 November 2007.
Report on Installed Resource Capacity Flavia Donno CERN/IT-GS WLCG GDB, CERN 10 December 2008.
Glexec, SCAS & CREAM. Milestones CREAM-CE capable of large-scale direct job submission Glexec & SCAS capable of large-scale use on WN in logging only.
Ruth Pordes November 2004TeraGrid GIG Site Review1 TeraGrid and Open Science Grid Ruth Pordes, Fermilab representing the Open Science.
US LHC OSG Technology Roadmap May 4-5th, 2005 Welcome. Thank you to Deirdre for the arrangements.
ATLAS Bulk Pre-stageing Tests Graeme Stewart University of Glasgow.
Ian Bird GDB CERN, 9 th September Sept 2015
LCG Report from GDB John Gordon, STFC-RAL MB meeting February24 th, 2009.
LCG Support for Pilot Jobs John Gordon, STFC GDB December 2 nd 2009.
Plans for Service Challenge 3 Ian Bird LHCC Referees Meeting 27 th June 2005.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Update Authorization Service Christoph Witzig,
OSG Area Coordinator’s Report: Workload Management Maxim Potekhin BNL May 8 th, 2008.
Report from GSSD Storage Workshop Flavia Donno CERN WLCG GDB 4 July 2007.
LCG Accounting Update John Gordon, CCLRC-RAL WLCG Workshop, CERN 24/1/2007 LCG.
Maria Girone CERN - IT Tier0 plans and security and backup policy proposals Maria Girone, CERN IT-PSS.
LCG Service Challenges SC2 Goals Jamie Shiers, CERN-IT-GD 24 February 2005.
Testing CernVM-FS scalability at RAL Tier1 Ian Collier RAL Tier1 Fabric Team WLCG GDB - September
SL5 Site Status GDB, September 2009 John Gordon. LCG SL5 Site Status ASGC T1 - will be finished before mid September. Actually the OS migration process.
Enabling Grids for E-sciencE INFSO-RI Enabling Grids for E-sciencE Gavin McCance GDB – 6 June 2007 FTS 2.0 deployment and testing.
VOX Project Status T. Levshina. 5/7/2003LCG SEC meetings2 Goals, team and collaborators Purpose: To facilitate the remote participation of US based physicists.
LCG Issues from GDB John Gordon, STFC WLCG MB meeting September 28 th 2010.
The Grid Storage System Deployment Working Group 6 th February 2007 Flavia Donno IT/GD, CERN.
LCG Pilot Jobs + glexec John Gordon, STFC-RAL GDB 7 December 2007.
WLCG Operations Coordination report Maria Alandes, Andrea Sciabà IT-SDC On behalf of the WLCG Operations Coordination team GDB 9 th April 2014.
Status of gLite-3.0 deployment and uptake Ian Bird CERN IT LCG-LHCC Referees Meeting 29 th January 2007.
Summary of SC4 Disk-Disk Transfers LCG MB, April Jamie Shiers, CERN.
LCG Accounting Update John Gordon, CCLRC-RAL 10/1/2007.
LCG Introduction John Gordon, STFC-RAL GDB November 7th, 2007.
WLCG Information System Status Maria Alandes Pradillo, CERN CERN IT Department, Support for Distributed Computing Group GDB 9 th September 2015.
The Worldwide LHC Computing Grid WLCG Milestones for 2007 Focus on Q1 / Q2 Collaboration Workshop, January 2007.
HEPiX IPv6 Working Group David Kelsey (STFC-RAL) GridPP33 Ambleside 22 Aug 2014.
WLCG Operations Coordination Andrea Sciabà IT/SDC GDB 11 th September 2013.
Accounting Review Summary and action list from the (pre)GDB Julia Andreeva CERN-IT WLCG MB 19th April
Ruth Pordes, March 2010 OSG Update – GDB May 12 th 2010 Operations Services 1 Periodic reliability problems with end to end publishing to WLCG BDII – as.
T0-T1 Networking Meeting 16th June Meeting
WLCG IPv6 deployment strategy
Status of Task Forces Ian Bird GDB 8 May 2003.
Computing Operations Roadmap
Multi User Pilot Jobs update
Flavia Donno CERN GSSD Storage Workshop 3 July 2007
A Model for Grid User Management
Grid Deployment Area Status Report
CREAM Status and Plans Massimo Sgaravatto – INFN Padova
Database Readiness Workshop Intro & Goals
John Gordon, STFC-RAL GDB 10 October 2007
Update on SHA-2 and RFC proxy support
Deployment of IPv6-only CPU on WLCG – an update from the HEPiX IPv6 WG
glexec/SCAS pilot service
Glexec/SCAS Pilot: IN2P3-CC status
John Gordon, STFC GDB October 12th 2011
John Gordon, STFC-RAL GDB June 6, 2007
Leigh Grundhoefer Indiana University
LHC Data Analysis using a worldwide computing grid
MB Maarten Litmaath CERN v1.0
IPv6 update Duncan Rand Imperial College London
Dirk Duellmann ~~~ WLCG Management Board, 27th July 2010
The LHCb Computing Data Challenge DC06
Presentation transcript:

Summary from last MB “The MB agreed that a detailed deployment plan and a realistic time scale are required for deploying glexec with setuid mode at WLCG sites. Maarten was asked to follow this up. Once an initial plan is available the MB will set a date for recommending MUPJs to run with glexec in setuid mode.” Agreed: Agree milestone for Tier0/1 deployment of glexec deployed: With appropriate back-end (SCAS, ARGUS, GUMS) Publish capability Pass Nagios tests Recommend that sites deploy glexec in setuid mode, but allow sites to choose logging-only Extend suspension of the policy on MUPJ until end of 2010 Ian.Bird@cern.ch

CERN as reported already, glexec is available at CERN in production (setuid) mode, with an SCAS backend. During the GDB meeting, Maarten said that this fact is correctly reported by the Nagios tests. As far as I can see, for CERN the work is done. ASGC ASGC is going to deploy glexec/argus as a preproduction for testing and evaluation first. The milestone to bring it into production by end of May is fine for us. FNAL 1. We believe gLexec is configured appropriately now at the USCMS Tier 1 at Fermilab.  It has been tested with MUPJ from UCSD up to 8000 simultaneous jobs.  During these tests glexec worked fine for us, but we did experience some scaling limitations with our FNAL site security infrastructure (SAZ) that we need to address.  The backend to this is GUMS and it works fine. 2. We will publish this capability in the glue schema as prescribed by the GDB on April 5. 3. We will write a monitoring script to ensure it is properly published and this will also be deployed by April 5.  This is a local monitoring test. 4. We will watch for any announcements about a WLCG SAM monitoring test for this and deploy it as needed. BNL At the US ATLAS Tier-1 center we are prepared to deploy glexec as soon as we get a VDT based distribution from OSG. The latter has been pushed to a high level on OSG’s priority list and we expect to get an initial version in the next few weeks. However, looking at the complexity level and being conservative in view of data taking to start soon I don’t think a deadline of end of May is realistic. I would suggest moving it to end of July NL-T1   IN2P3  sorry for this delayed answer. There is still some uncertainties regarding our ability to have the backend fully tested by the end of May, but we certainly plan to work on the deployment of glexec and friends in the following weeks.  So, the proposed timescale is realistic for us and we will work towards reaching that milestone FZK glexec / SCAS is installed and tested at KIT/GridKa. However, scalability tests of our SCAS setup have not been performed so far. We will check if the capabilty is published correctly and wait for the availability of a SAM test. PIC Work for deploying and testing glexec/SCAS has already started at PIC. We confirm that the proposal milestone date for end May 2010 is realistic for us. NDGF   CNAF At CNAF we have installed and configured the Argus 1.1 server; the Tier-1 production farm is configured, using the WNoDeS virtualization service, so that for test purposes one of the supported VOs (CMS) can dynamically run jobs on glExec-enabled WNs, when executing jobs with a particular VOMS role. We plan to configure glExec on the entire farm after Easter. Hence, the proposed timescale of end of May 2010 fits our plans. Triumf For TRIUMF we are happy with the "end of May" milestone. We will follow a staged plan as usually to deploy glexec: 1) evaluation / choice of authorization module (GMUS/SCAS/ARGUS). Since we use dCache we would like to use the same authorization service. 2) deployment on pre-production system and testing + info publishing + nagios/SAM monitoring. 3) deployment/standby for production, until ATLAS is ready to use it. RAL glexec and SCAS are installed at RAL  but the CEs need configuring to map the pilot roles onto accounts that are permitted to use glexec. This will start after Easter and we anticipate all CEs being updated by the end of April. The capability will be published once this is done.  So RAL is content with a milestone date of the end of May. Ian.Bird@cern.ch

Summary of timescales CERN End May ASGC BNL End July CNAF FNAL Not explicit, but End May FZK End May? IN2P3 NDGF No reply NL-T1 PIC RAL Triumf Ian.Bird@cern.ch