11k London Closing Plenary

Slides:



Advertisements
Similar presentations
Coexistence Motions for LB84 Comment Resolution
Advertisements

LB84 General AdHoc Group Sept. Closing TGn Motions
LB84 General AdHoc Group Sept. Closing TGn Motions
[ Interim Meetings 2006] Date: Authors: July 2005
March 2013 Opening Report Date: Authors: March 2013
Motions Date: Authors: January 2006
London TGu Motions Authors: January 2007 Date: Month Year
LB73 Noise and Location Categories
LB73 Noise and Location Categories
Waveform Generator Source Code
March 2014 Election Results
TGp Closing Report Date: Authors: July 2005 Month Year
TGp Closing Report Date: Authors: July 2007 Month Year
Attendance and Documentation for the March 2007 Plenary
Attendance and Documentation for the March 2007 Plenary
[ Policies and Procedure Summary]
[ Policies and Procedure Summary]
TGs London Closing Report
TGs London Closing Report
Motion to accept Draft p 2.0
November 2013 Opening Report
TGp Motions Date: Authors: November 2005 Month Year
TGp Closing Report Date: Authors: March 2006 Month Year
TGu-changes-from-d0-02-to-d0-03
TGp Closing Report Date: Authors: May 2007 Month Year
IEEE P Project Status Date: Authors: July 2013
TGw Closing Report Date: Authors: March 2007 Month Year
TGp Closing Report Date: Authors: March 2006 Month Year
Reflector Tutorial Date: Authors: July 2006 Month Year
TGv Redline D0.07 Insert and Deletion
TGv Redline D0.06 Insert and Deletion
July 2012 Opening Report Date: Authors: July 2012
IEEE WG Opening Report – July 2008
TGu-changes-from-d0-01-to-d0-02
LB73 Noise and Location Categories
IEEE White Space Radio Intended timeline
March 2012 Opening Report Date: Authors: March 2012
IEEE P PAR Extension Request
TGy draft 2.0 with changebars from draft 1.0
TGv Redline D0.10 Insert and Deletion
TGs Dallas Closing Report
IEEE WG Opening Report – July 2007
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
Redline of draft P802.11w D2.2 Date: Authors:
TGp Closing Report Date: Authors: March 2007 Month Year
November Opening Report
Overview of WG Letter Ballot Process
TGr Closing Report May 2007 Date: Authors: July 2005
TGu-changes-from-d0-02-to-d0-03
[ Policies and Procedure Summary]
March Opening Report Date: Authors: March 2011
May 2005 CAPWAP AHC Closing Report
Beamforming and Link Adaptation Motions
[ Policies and Procedure Summary]
November 2012 Opening Report
Draft P802.11s D1.03 WordConversion
September 2012 Opening Report
January Opening Report
IEEE P Motions at the July Plenary EC Meeting
Motion to go to Letter Ballot
TGu-changes-from-d0-04-to-d0-05
TGp Closing Report Date: Authors: January 2006 Month Year
TGu-changes-from-d0-03-to-d0-04
Tge Closing Report Date: Authors: July 2005 July 2005
TGu Motions Date: Authors: May 2006 May 2006
TGp Closing Report Date: Authors: November 2006 Month Year
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
July 2013 Opening Report Date: Authors: July 2013
TGp Motions Date: Authors: January 2006 Month Year
May 2012 Opening Report Date: Authors: May 2012
Presentation transcript:

11k London Closing Plenary Date: 2007-1-19 Notice: This document has been prepared to assist IEEE 802.11. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE 802.11. Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures <http:// ieee802.org/guides/bylaws/sb-bylaws.pdf>, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair <stuart@ok-brit.com> as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE 802.11 Working Group. If you have questions, contact the IEEE Patent Committee Administrator at <patcom@ieee.org>.

802.11k London Closing Plenary Report Richard Paine richard.h.paine@boeing.com

Meeting Objectives Whole London Meeting: LB90 Comment Resolution Last Recirculation Letter Ballot

Meeting Objectives Met Whole London Meeting: 100% LB90 (199) Comments Resolved Recirculation LB

Accomplishments Nov-Jan reevaluated carried-forward no voter comments Email campaign to carried-forward no voters Resolved the last 21 comments of LB90 Produced D7.0

Objectives for Mar 2007 Objectives for May 2007 Recirculation Letter Ballot Comment Resolution Sponsor Ballot Objectives for May 2007 Sponsor Ballot Comment Resolution Recirculation Sponsor Ballot

Plans Plan until next meeting: Weekly Teleconferences on Thu noon Eastern Time starting on 2007-02-15. Plan for start of next meeting: LB95 Comment Resolution Next major milestone: Sponsor Ballot

Next Telecom 2007-02-15 2007-02-15 Meeting: LB95 Comment Resolution

Radio Resource Measurement LB90 Results Radio Resource Measurement 514: Voter Pool 354: Approve 36  : Do Not Approve 39  : Abstain Return Ratio: 84% This return ratio is valid if it exceeded the 50% acceptance level (514 Voters) Ballot Approval: 91 % With this result the balloted draft passed both the 75% approval level and the 50% return ratio acceptance level per the 802.11 WG and 802 LMSC P&Ps.

WG Motion for Recirculation LB Believing that comment responses in 06/1739r18 and the draft mentioned below satisfy WG 802.11 rules for letter ballot recirculation, Authorize a 15-day LB recirculation of 802.11k draft 7.0. Movers: TGk: Ganesh/Kwak Result:5-0-0 WG: Result: x-x-x

WG Motion On behalf of the TG, move to request the IEEE 802.11 Assigned Number Authority (ANA) to allocate numbers for the following Element IDs: Measurement Pilot Transmission information, BSS Available Admission Capacity, and BSS AC Access Delay. Movers: TGk: Levy/Hart Result: 8-0-1 WG: x/x Result: x-x-x