Ralph Aßmann (DESY) 2nd collaboration week November 24th, 2017, Lisbon

Slides:



Advertisements
Similar presentations
SINBAD Ralph W. Aßmann Leading Scientist, DESY LAOLA Collaboration Meeting, Wismar
Advertisements

Discussion on EUROTeV and ILC Nick Walker (DESY) EUROTeV Kick-off Meeting DESY 1 November 2004.
1 DOE Annual Review -June 15,2005 An Overview of Conventional Facilities (Civil Construction) U. S. ILC Civil studies and cost issues for Snowmass Fred.
Office of Information Technology (OIT) PROJECT INITIATION DOCUMENTS - BUSINESS CASE, ALTERNATIVE ANALYSIS AND STATEMENT OF WORK (SOW)
May Agenda  PeopleSoft History at Emory  Program Governance  Why Upgrade Now?  Program Guiding Principles  High-Level Roadmap  What Does This.
2011 Damping Rings Lattice Evaluation Mark Palmer Cornell University March 8, 2011.
European Economic and Social Committee EUROPEAN INDUSTRY AND MONETARY POLICY The role of the European Investment Bank MAIN PROVISIONAL CONCLUSIONS (To.
March 7, 2007 LET Issues (Cai/Kubo/Zisman) Global Design Effort 1 Low-Emittance Tuning Issues and Plans Yunhai Cai, Kiyoshi Kubo and Michael S. Zisman.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Ralph Assmann What Do We Want To Measure (in 2009) R. Assmann S. Redaelli, V. Previtali CERN/BE discussed with W. Scandale CERN/EN26/3/2009CC09  See also.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Report from ESGARD EuCARD-2.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
Environmental Management Plan (EMP) Required for: Full EIA based on Palestinian EIA Policy Category A projects based on World Bank Policy.
Global Design Effort Introduction and goals of the meeting Andrei Seryi, Toshiaki Tauchi Fifth ATF2 Project Meeting December 19-21, 2007.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
Review of FCC-hh optics & beam dynamics IPNO, Orsay, Paris November 2015 Reviewers: S. Fartoukh (CERN), O. Napoly (CEA), E. Todesco (CERN), F. Zimmermann.
Inputs from GG6 to decisions 2,7,8,15,21,27,34 V.Telnov Aug.24, 2005, Snowmass.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier NSLS-II Conventional Facilities Schedule Review December 13, 2006.
Introdcution to Workpackage/Activity Reflection D. Schulte.
SCU 3-Lab Review Meeting, Dec. 16, 2014 SCU Presentations Today Intro. & Performance Motivations (P. Emma, SLAC, 20+5) Conceptual Cryostat Design: Option-A.
HIE-ISOLDE Project Status Report: Planning of Phase II 74th ISOLDE Collaboration Committee meeting November 10th 2015 Y. Kadi.
Status of Contributions, Draft Budget Request for 2005 and Outlook for the Longer Term Future Martyn Davenport 8 TH October 2004 CAST FRC-D
1 The next steps – focusing points Define the scope, strategy and cost of the project implementation. Main input: The evolution of the physics findings.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Training on Safe Hospitals in Disasters Module 3: Action Planning for “Safe Hospitals”
GBM 489 OUTLET Teaching Effectively\gbm489outletdotcom FOR MORE CLASSES VISIT
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
HISTORY OF SNS DESIGN AND TECHNOLOGY CHOICES PROJECT X WORKSHOP NOVEMBER 12-13, 2007 R. KUSTOM.
Collimation Aspects for Crab Cavities? R. Assmann, CERN Thanks to Daniel Wollmann for presenting this talk on my behalf (criticism and complaints please.
1 BROOKHAVEN SCIENCE ASSOCIATES 13th International Workshop on Accelerator Alignment October 13-17, 2014, IHEP, Beijing, China Smoothing Based on Best-fit.
Rob Connatser NSS Instrument Work Packages and XLPM.
WP9 updated Upgrade of SPARC test facility for high gradient acceleration of electron beams for SuperB collider and FEL projects WP number9Start month1End.
LARP Accelerator Systems D. Rice, J. Rosenzweig, M. White LARP 2009 review.
WP High Beta Cavities Delivery
AMICI WP1 – Management, coordination and dissemination
Introducing pdri for mega projects As a Planning quality Control tool
European Network for Novel Accelerators (EuroNNAc2): WP7
NATA Foundation Student Grants Process
Project Complexity Proposal prepared for Andrew Pekin: 12th August 2016.
Jefferson Lab Overview
BANKING INFORMATION SYSTEMS
East Hall under construction
Input to Strategy currently planned
The Beamline for Schools (BL4S) Competition
On behalf of the Accelerator Project Phase II Team
Collaboration New collaborators in 2016:
S4 will be a “big” Collaboration:
Superattenuator for LF and HF interferometers
Upgrade Strategy for the Experimental Vacuum Systems
Civic Center Sports Field Study Session & Quarterly Update
Understand the principles of effective decision making
European Innovation Council Pilot (EIC)
Ralph Aßmann, 20. September 2017
GBM 489 Competitive Success/snaptutorial.com
GBM 489 Education for Service/snaptutorial.com
GBM 489 Teaching Effectively-- snaptutorial.com
Accelerator Layout and Parameters
Injector Performance Requirements Conventional Facilities Update
Engagement Follow-up Resources
Engagement Follow-up Resources
Fine-Tuning your plan and obtaining approval
European Economic and Social Committee
Summary of Washington DOE Review
Accelerated Interest Based Problem Solving
Laser Und XFEL.EU Experiment
Value Proposition Celemi Sales Endeavour™ enables sales professionals, and their organizations, to learn and apply a repeatable process for developing.
Crab Crossing Named #1 common technical risk (p. 6 of the report)
n_TOF Target #3 Production Readiness Review History of Target #3 options and baselining M. Calviani (EN-STI) n_TOF.
Presentation transcript:

Ralph Aßmann (DESY) 2nd collaboration week November 24th, 2017, Lisbon WP1 EuPRAXIA Project Ralph Aßmann (DESY) 2nd collaboration week November 24th, 2017, Lisbon http://eupraxia-project.eu

WP1 Excellent place, good discussions, good review, new insights, good progress... Thanks to everybody for the great work. Also discussed next step forward: Classifying solutions New post-CDR and pre-construction phase Lot’s of technical discussions... R. Aßmann (DESY) - EuPRAXIA Mid-Term Review

R. Aßmann (DESY) - EuPRAXIA Mid-Term Review

R. Aßmann (DESY) - EuPRAXIA Mid-Term Review

EuPRAXIA Baseline(s) Limited number of baseline solutions (1 – 3) Choices of most promising approaches (balance technical readiness, performance, cost) Installed and operational from day 1 High technical readiness level: reasonable extension from today (e.g. limited repetition rate) R. Aßmann (DESY) - EuPRAXIA Mid-Term Review

Evaluation Criteria (to be completed) Criterion Weight Score Technical Readiness Level 5 years Technical Readiness Level 10 years Technical judgement criteria: 5 GeV performance FEL Performance 5 GeV based on start to end simulations Flexibility and tuning capabilities FEL Performance 1 GeV based on start to end simulations Cost Size Innovation and Technical Disruptiveness New parameter reach beyond conventional accelerators Future technology/performance reach and impact Upgradeability R. Aßmann (DESY) - EuPRAXIA Mid-Term Review

Development Path(s) Included Developments paths envisaged during EuPRAXIA operation (e.g. towards high repeti-tion rate) Options that we consider required for the scientific/technical goals of EuPRAXIA and therefore should be included into construction funding (costing extra money) Options that we get for free and do not slow down overall implementation work: all necessary hardware is part of baseline (e.g. hybrid solutions) and teams available to work on this in EuPRAXIA Lower technical readiness level: not available for day 1 but required for EuPRAXIA goals R. Aßmann (DESY) - EuPRAXIA Mid-Term Review

Backup and Risk Mitigating Options Options that were not selected as most promising for the EuPRAXIA baseline but that offer interesting features Options that we get for free and that would slow down overall implementation work: major beamtime needed which is not available, teams and institutes interested in this will be fully busy on other topics Might be required for risk mitigation in case that a backup option proves not feasible for whatever reason Includes both high and low technical readiness level Not included into construction funding: in case needed would be funded through budget shifts R. Aßmann (DESY) - EuPRAXIA Mid-Term Review

Who Will Decide? Input from WP members and leaders WP leaders prepare proposal(s) EuPRAXIA management will sort and assemble proposals EuPRAXIA Steering Committee will take the overall working decisions as long as not affecting overall goals and scope EuPRAXIA Collaboration Board will take decisions affecting scope and overall goals R. Aßmann (DESY) - EuPRAXIA Mid-Term Review

New Post-CDR Phase R. Aßmann (DESY) - EuPRAXIA Mid-Term Review

Technical: Tolerances and Alignment I Overall Accelerator Reference line Offset Dx Rotation Dx’ Each element on the accelerator line has assigned alignment errors like defined above, in x, y, z RF cavities, plasma cells, mirrors, magnets, diagnostics, ... Alignment campaigns minimize alignment errors R. Aßmann (DESY) - EuPRAXIA Mid-Term Review

Technical: Tolerances and Alignment II Offset Dx Overall Accelerator Reference line Offset Dx Rotation Dx’ Laser Rotation Dx’ Same for laser... Offsets and angles must be defined with respect to the overall reference line. R. Aßmann (DESY) - EuPRAXIA Mid-Term Review

Technical: Tolerances and Alignment III Offset Dx Overall Accelerator Reference line Offset Dx Beam Rotation Dx’ Laser Rotation Dx’ Same for laser... Offsets and angles must be defined with respect to the overall reference line. R. Aßmann (DESY) - EuPRAXIA Mid-Term Review

Thank You R. Aßmann (DESY) - EuPRAXIA Mid-Term Review