Chapter 6 Inventory Controls Example 1 Paul Peterson is the inventory manager for Office Supplies, Inc., a large office supply warehouse. The annual demand.
Stochastic Inventory Modeling
Inventory Management for Independent Demand Chapter 12, Part 2.
Inventory Control Chapter 17 2.
1 1 © 2003 Thomson  /South-Western Slide Slides Prepared by JOHN S. LOUCKS St. Edward’s University.
INVENTORY MODELING Service Levels. DETERMINING A REORDER POINT, r* (With Safety Stock) Suppose lead time is 8 working days The company operates 260 days.
1 1 Slide © 2008 Thomson South-Western. All Rights Reserved Slides by JOHN LOUCKS St. Edward’s University.
Inventory Management. Inventory Objective:  Meet customer demand and be cost- effective.
12 Inventory Management.
1 Chapter 15 Inventory Control  Inventory System Defined  Inventory Costs  Independent vs. Dependent Demand  Basic Fixed-Order Quantity Models  Basic.
Ordering and Accounting for Inventory
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 12 Inventory Management.
Chapter 17 Inventory Control.
Inventory Control IME 451, Lecture 3.
Types of Inventory Transit stock or pipeline inventory Cycle stock
Managerial Decision Modeling with Spreadsheets
Inventory Management A Presentation by R.K.Agarwal, Manager (Finance), PFC.
Operations Management
Chapter 11, Part A Inventory Models: Deterministic Demand
Dr. Mohamed A. Hamada Lecturer of Accounting Information Systems 1-1 PRACTICAL CASES ON CH 6 Inventory Management.
Chapter 9 Inventory Management.
Inventory Control Models
Operations Management Inventory Management Chapter 12 - Part 2
Chapter 5 Inventory Control Subject to Uncertain Demand
INDR 343 Problem Session
Module C5 Reorder Point/Service Levels. DETERMINING A REORDER POINT, r* (Without Safety Stock) Suppose lead time is 8 working days The company operates.
Customer Demand Customer demand varies in both timing and quantity:
Inventory Management for Independent Demand
Chapter 12: Inventory Control Models
EOQ: How much to order; ROP: When to order Re-Order Point (ROP) in periodic inventory system is the start of the period. Where is ROP in a perpetual system?
MNG221- Management Science –
13 Inventory Management.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 12 Inventory Management.
Independent Demand Inventory Management
Inventory Management.
Solved Problems Chapter 12: Inventory 1. Solved Problem The data shows projected annual dollar usage for 20 items. Exhibit 12.3 shows the data sorted,
1 Slides used in class may be different from slides in student pack Chapter 17 Inventory Control  Inventory System Defined  Inventory Costs  Independent.
Inventory Inventory is the stock of goods, commodities or other economic resources that are stored for the smooth and efficient running of a business.
When to re-order with EOQ Ordering
Economic Order Quantity The economic order quantity (EOQ) is the fixed order quantity (Q) that minimizes the total annual costs of placing orders and holding.
Economic Order Quantities (EOQs) The concept of an economic-order quantity addresses the question of how much to order at one time. The concept of an economic-order.
Inventory Management MD707 Operations Management Professor Joy Field.
Independent Demand Inventory Planning CHAPTER FOURTEEN McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
1 1 Slide © 2011 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole.
Ch. 21 Inventory Control Learning Objectives Analyze the importance of inventory. Describe the features of an inventory control system. Analyze the costs.
Introduction to Basic Inventory Control Theory
The (Q, r) Model.
Operations Research II Course,, September Part 3: Inventory Models Operations Research II Dr. Aref Rashad.
PPTs t/a Management Accounting 2e by Banks & Neish. © 2003 McGraw-Hill Australia. Slides prepared by Peter Miller 18–1 This is the prescribed textbook.
Inventory Management for Independent Demand Chapter 12.
CHAPTER 6 Inventory Management. Copyright © 2001 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin 6-2 Purposes of Inventory Enables.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 12 Inventory Management.
Inventory Management.
Example ( In terms of Percentage)
Inventory Models (II) under SC environment
Part Six: The application of quantitative methods to management accounting Chapter Twenty-four: Quantitative models for the planning and control of inventories.
Operations Research Lecture 11.
Assignment 5: Part (A) The Dine Corporation is both a producer and a user of brass couplings. The firm operates 220 days a year and uses the couplings.
NATCOR Stochastic Modelling Course Inventory Control – Part 3
NATCOR Stochastic Modelling Course Inventory Control – Part 2
Lecture 24 Order Quantities (Continued)
MANAGEMENT AND COST ACCOUNTING
Random Demand: Fixed Order Quantity
The Economic Order Quantity
Beni Asllani University of Tennessee at Chattanooga
Chapter 17 Inventory Control.
Slides by John Loucks St. Edward’s University.
Inventory Models Dr. Titus Bitek Watmon.
Presentation transcript:

NATCOR Stochastic Modelling Course Inventory Control – Part 1 Adam Letchford Department of Management Science Lancaster University Management School

Recap: simple deterministic model Demand for a part is D items per year The demand rate is constant over the year The cost of placing a delivery order is Co The cost of holding one item in stock per year is Ch. The company wishes to order Q units at a time, at regular intervals throughout the year.

Recap (cont.)

Recap (cont.) Number of orders per year = D/Q. Average stock level = Q/2. The annual ordering cost = CoD/Q. Annual stock-holding cost = ChQ/2. Total annual cost = CoD/Q + ChQ/2.

Recap (cont.)

Recap (cont.) The cost function is minimised when Q = . This value is called the Economic Order Quantity (EOQ). (Due to Harris, 1913.)

Stochastic Aspects In real life, there are two important things to take into account: 1. Lead Time (L): there is usually a delay between placing an order and the order arriving. 2. Stochastic demand: the demand per unit time usually is not constant, but varies according to a known distribution.

Lead times and constant demand If the demand rate is constant, and L is known, then the demand over the lead time is just DL. So place an order of size Q whenever the stock falls to DL. Stock Level Q DL Time place order order arrives

Example Suppose: Then the DL is 90*(4/5) = 72. The demand is 90 items per five day working week. We have already computed that Q = 150. The lead time is four working days. Then the DL is 90*(4/5) = 72. So place an order when only 72 items remain in stock.

Example (cont.) This is how the stock varies in the example. We place an order when stock drops down to 72. Stock Level Q = 150 DL = 72 Time place order order arrives

Lead times and stochastic demand Now suppose that demand is stochastic. We assume that the demand per unit time period follows some known probability distribution. For example, we may know that the demand in a five-day working week follows a normal distribution with a mean of 90 and a standard deviation of 25.

The Lead Time Demand Distribution Now we do not know exactly what the demand will be during the lead time. But we can compute the probability distribution for the lead-time demand, the so-called Lead-Time Demand (LTD) distribution. If the demand per unit time is Normally distributed with mean  and standard deviation , then the LTD will be Normally distributed with mean L and standard deviation  .

Example (cont.) If the demand per five day working week is Normally distributed with a mean of 90 and a standard deviation of 25, and L = 4 working days… …then the LTD is Normally distributed with mean = 90(4/5) = 72 and standard deviation = 25(4/5) = 22.4.

Stockouts: failure to meet demand Suppose we ignore the stochastic aspect, and continue to place an order whenever the stock falls to 72. On average, after we place an order, there is a 50% chance that LTD > 72. Then we have a 50% chance of running out of stock during each lead time!

Stockouts: graphical representation

Service Level = 1 - Prob (Stockout Occurs). The Service Level If we do not want to have so many stock-outs, we will have to place our orders before the stock drops to 72. In order to decide on the appropriate re-order level, denoted by r, we need to decide on our objective. A commonly used measure of quality of an inventory control system is the “service level”. This is the expected percentage of lead times in which we do not run out of stock. That is, Service Level = 1 - Prob (Stockout Occurs).

Computing the correct re-order level If the LTD is Normally distributed, we know there is: 5% chance that demand will exceed mean + 1.64 St.Dev. 2.5% chance that demand will exceed mean + 1.96 St.Dev. 1% chance that demand will exceed mean + 2.33 St.Dev. So, for example, if we place an order when the stock drops to: r = mean LTD + 1.64 St.Dev Then Prob(Stockout Occurs) will be 5%. And the Service Level will be (100-5)% = 95%.

Example (cont.) Suppose again that the LTD is Normally distributed with a mean of 72 and a standard deviation of 22.4. If we set the re-order level to r = 72 + (1.64 × 22.4) = 108.7 then the service level will be 95%. (Actually, we should round up to 109 units, since the re-order level must be an integer.)

Variation when r = 109

re-order level = mean LTD + buffer stock. Achieving a high service level comes at a price: our average stock level is increased. The average additional stock carried in our example is 109 – 72 = 37 units. This is called the buffer stock or safety stock. To summarise: re-order level = mean LTD + buffer stock.

Total cost Expected annual cost = Purchase cost + Ordering cost + stock holding cost = cD + (CoD/Q) + Ch(0.5Q + b), where: c is the unit item price, D is the annual demand Co is the ordering cost Ch is the holding cost b is the buffer stock.

Continuous Review system Notice that, in the approach just described, one must continually monitor the stock level, to see if it has dropped down to r. It is therefore called a continuous review system. It is also sometimes called a (Q,r) system. In the next lecture, we will look at periodic review systems, in which one checks the stock level at regular intervals.