Mechanical stability and QXF coil winding

Slides:



Advertisements
Similar presentations
May 9, 2012D. R. Dietderich, LARP CM-18 Cable Fabrication Plans and Experience D.R. Dietderich Lawrence Berkeley National Laboratory bnl - fnal- lbnl -
Advertisements

F. BORGNOLUTTI Oct. 16 th 2012 Winding Test plan for the MQXF Cable.
S2 Glass Insulation Hexcel Corporation S2 Fiberglass Cloth #4522 with F81 Silane Finish. 30” (0.762 m) wide roll, 125 yards long (114.3 m),.0051” (0.130.
LHQ Coil 02 Winding and Curing Plan Miao Yu 03/21/13.
Outline: Goals for the cable development at CERN. Main parameters of the cable. Cable development work for a cable width of 15.1 mm and for a cable width.
Coil working group video-meeting P. Ferracin, J. C. Perez, S. Izquierdo Bermudez, X. Sarasola February 4th, 2014.
SQXF 25 m Cable Practice Winding at LBNL Miao Yu Dan Cheng 10/31/2013.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
Nb3Sn Cable and Insulation for LARP High-Gradient Quadrupole Magnets
11 Oct , 2013 by Video LBNL Cable Experience for HiLumi HiLumi LARP/LHC Strand and Cable Internal Review Oct , 2013 by Video D.R. Dietderich,
Coil Design and Fabrication Miao Yu Outline Introduction Coil Design –Coil Pole –Coil End Parts –Coil Insulation Coil Fabrication –Winding.
E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, Francois-Olivier Pincot, X. Sarasola
MQXF Design and Conductor Requirements P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
Coil working group video-meeting P. Ferracin, J. C. Perez, S. Izquierdo Bermudez, X. Sarasola January 29, 2014.
MQXF RRP® Strand for Q1/Q3 A. K. Ghosh MQXF Conductor Review November 5-6, 2014 CERN.
Status of MQXF Conductor LARP Update
Fred Nobrega. 9 Dec 2014 Model Design & Fabrication – FNAL Fred Nobrega 2 Outline Background Mechanical Design Model Magnet Features Coil Technology and.
Design Features: still to be determined and open questions P. Ferracin 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014 KEK, Tsukuba.
QXF Cable Status D.R. Dietderich Conductor Working Group Video Meeting, Sept. 17, 2014.
LQ status and plans – G. Ambrosio 1 LARP Collaboration Meeting - LBNL, April , 2006 BNL - FNAL - LBNL - SLAC OUTLINE: Goals, Input and Output Sub-tasks.
MQXF Cable for Q1/Q3 D.R. Dietderich MQXF Conductor Review November 5-6, 2014 CERN.
E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, F.O. Pincot, X. Sarasola
DOE Review of LARP – February 17-18, 2014 Coil Design and Fabrication Miao Yu February 17,
F. Borgnolutti January 17 th 2013 Proposal for a winding test procedure for qualifying the QXF cable.
Plans and schedule for QXF Giorgio Ambrosio and Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013 The HiLumi LHC Design.
Fred Nobrega, Nikolai Andreev 21 September, 2015.
E. Cavanna, N. Bourcey, P. Ferracin, S. Izquierdo Bermudez, J. Mazet, J. C. Perez, F.O Pincot, X. Sarasola
MQXF Design and Conductor Requirements P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
Large Hadron Collider Accelerator Research Program Dimensional Changes of Nb 3 Sn Cables during Heat Treatment LBNL: Ian Pong Dan Dietderich.
LARP Meeting April 2006LARP Magnet Program – D.R. Dietderich LARP Cable R&D D.R. Dietderich LBNL.
Subscale quadrupole (SQ) series Paolo Ferracin LARP DoE Review FNAL June 12-14, 2006.
MQXF Q1/Q3 Conductor Procurement A. K. Ghosh MQXF Conductor Review November 5-6, 2014 CERN.
ECC Clément Lorin – Maria Durante Acknowledgements: Fresca2 team.
MQXFS Coil V1 Fabrication Status -Winding and Curing Miao Yu
QXF Coil Fabrication: Baseline Decisions QXF Coil Working Group Video Meeting (Revised from discussion during presentation) Dan Cheng April 16, 2013.
SQXF1 End Parts Mini Review G. Ambrosio and P. Ferracin October,
MQXF Short model and prototype plans P. Ferracin, G. Ambrosio HL-LHC/LARP International Review of the MQXF Design December 10-12, 2014 CERN.
1 Cable Functional Specification March Conductor Working Group Arup K. Ghosh (BNL)
SQXF Cu Cable Winding Test at LBNL Dan Cheng Dec 17, 2013.
Long Quad (LQ) & High Gradient (HQ) Series Alexander Zlobin bnl - fnal- lbnl - slac US LHC Accelerator Research Program DOE LARP review Fermilab, June.
DOE Review of LARP – February 17-18, 2014 SQXF Coil Design and Fabrication Winding and Curing Miao Yu February 17,
CERN MBHSM0101 and Plan for Future Models F. Savary on behalf of the 11T Dipole Project Team.
E. Cavanna, P. Ferracin, S. Izquierdo Bermudez, J. C. Perez
2 nd LARP / HiLumi Collaboration Mtg, May 9, 2012LHQ Goals and Status – G. Ambrosio 11 LHQ Goals and Status Giorgio Ambrosio Fermilab 2 nd LARP / HiLumi.
CERN QXF Conductor Procurement and Cable R&D A.Ballarino, B. Bordini and L. Oberli CERN, TE-MSC-SCD LARP Meeting, Napa, 9 April 2013.
LHQ Coil Fabrication Experience and Plan Miao Yu 04/08/2013.
MQXF Cable for Q1/Q3 D.R. Dietderich MQXF Conductor Review November 5-6, 2014 CERN.
CERN Cabling Experience FRESCA 2, 11 T Dipole and MQXF A. Ballarino
P. Ferracin on behalf of the MQXF collaboration
QXF Coil Fabrication & Tooling Reaction / Impregnation
MQXF cable with RRP wires for Q2
MQXF Design and Conductor Requirements
Coil Design and Fabrication
TQS Overview and recent progress
11 T Dipole Integration & Plans M. Karppinen
11 T cable development and procurement strategy at CERN
MQXF Goals & Plans G. Ambrosio MQXF Conductor Review
QXF Cable Winding Test and End Parts Design
J.C. Perez on behalf of SMC collaboration team J.C. Perez
CERN Conductor and Cable Development for the 11T Dipole
11 T dipole coil features and dimensions
MQXF Short Models Status and Plans
P. Ferracin and G. Ambrosio
MQXF cable with RRP wires for Q2
MQXF updates P. Ferracin October 9th, 2014.
MQXF coil cross-section status
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
QXF schedule and milestones
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
Cross-section of the 150 mm aperture case
Presentation transcript:

Mechanical stability and QXF coil winding P. Ferracin, L. Oberli, S. Izquierdo Bermudez MQXF Conductor Review November 5-6, 2014 CERN

Outline Winding test set-up and results Coil winding experience at CERN Paolo Ferracin 5/11/2014

First test set-up GEOMETRY 2: GEOMETRY 3: GEOMETRY 1: POLE INNER LAYER GEOMETRY 2: BIG SPACER INNER LAYER GEOMETRY 3: POLE OUTER LAYER Paolo Ferracin 5/11/2014

Second test set-up Paolo Ferracin 5/11/2014

Second test set-up Layer jump Paolo Ferracin 5/11/2014

Third test set-up Inner layer, favourable Outer layer, unfavourable Paolo Ferracin 5/11/2014

Exampled of unstable cable Paolo Ferracin 5/11/2014

Winding test example (with tool) Paolo Ferracin 5/11/2014

Winding test example (with tool) Paolo Ferracin 5/11/2014

“Parameter space” Nominal Min. – Max. Mid-thickness Width 1.525 mm tolerance: +/- 0.010 mm Width 18.150 mm tolerance: +/- 0.050 mm Keystone angle 0.55 deg. tolerance: +/- 0.10 deg. Pitch length 109 mm Min. – Max. Mid-thickness 1.430 - 1.570 mm Width 17.800 - 18.330 mm Keystone angle Rect. - 0.36 - 067 deg. Pitch length 95 - 125 mm Paolo Ferracin 5/11/2014

45 winding tests performed Paolo Ferracin 5/11/2014

45 winding tests performed Paolo Ferracin 5/11/2014

Winding test conclusions By P. Ferracin, L. Oberli, S Winding test conclusions By P. Ferracin, L. Oberli, S. Izquierdo Bermudez In general, all RRP and PIT cables are stable in the favorable direction Cable wound clock-wise around the pole (inner layer condition) In general, all RRP and PIT cables are unstable in the unfavorable direction The few PIT which did not show unstable behavior were not reproducible The cable behaviour was not improving by changing winding tension We performed tests at different winding tension (25 kg, 45 kg, 60 kg), and the behaviour was similar The core does not seem to play a role in the cable mechanical stability We only wound one RRP sample without core, but “typical behaviour”. In general, all RRP and PIT cables can be wound with the tool (CERN) and/or with the binder (FNAL) In some cases it is required to use a thinner tool which better follows the cable during all the length of the turn Paolo Ferracin 5/11/2014

Outline Winding test set-up and results Coil winding experience at CERN Paolo Ferracin 5/11/2014

Coil fabrication status: 3+3 coils wound and cured LARP coil #1 completed LARP coil #2 completed LARP coil #3 Prep. For impregnation at BNL CERN coil #001 Prep. For impregnation CERN coil #101 Prep. For impregnation CERN coil #102 Prep. For reaction Paolo Ferracin 5/11/2014

Mandrel and pole set-up Paolo Ferracin 5/11/2014

Mandrel and pole set-up Paolo Ferracin 5/11/2014

Mandrel and pole set-up Paolo Ferracin 5/11/2014

Inner layer winding Pole insulation 0.175 mm S2 glass, 33TEX, 493 sizing, 19 mm wide Paolo Ferracin 5/11/2014

Inner layer winding Layer jump Paolo Ferracin 5/11/2014

Inner layer winding Voltage taps Paolo Ferracin 5/11/2014

Winding with tool Paolo Ferracin 5/11/2014

Winding with tool Paolo Ferracin 5/11/2014

Winding with tool Paolo Ferracin 5/11/2014

Winding with tool Paolo Ferracin 5/11/2014

Winding with tool Paolo Ferracin 5/11/2014

Inner layer winding Ceramic binder Paolo Ferracin 5/11/2014

Ceramic binder during winding CTD-1202X From the technical specification Curing 1 hour at 80°C + two hours at 150°C We noticed that if we cure at T < 150°C, after 10 minutes the cable is still wet and the insulation is not rigid. Paolo Ferracin 5/11/2014

Ceramic binder during winding Procedure Paint binder on the cable Heat the cable on one side, and time 3 mins (after 3 mins, the cable temperature is ~150°C) Heat the other side 3 mins.   The cable is still wet and the insulation is not rigid. We cut the insulation and the fibers are not glued (very similar behaviour in the region with and without). Paolo Ferracin 5/11/2014

Ceramic binder during winding We repeated the process, heating up to 250°C, but the cable is still wet and the insulation is not rigid So Coil 001: with ceramic binder Coil 101 and 102: no ceramic binder Paolo Ferracin 5/11/2014

End spacers Paolo Ferracin 5/11/2014

Wedges Paolo Ferracin 5/11/2014

End-shoes Paolo Ferracin 5/11/2014

Ceramic binder for curing inner layer Paolo Ferracin 5/11/2014

Curing inner layer Paolo Ferracin 5/11/2014

Curing inner layer Paolo Ferracin 5/11/2014

First Nb3Sn coil (101, low-grade RRP) Outer layer after curing Paolo Ferracin 5/11/2014

First Nb3Sn coil (101, low-grade RRP) Outer layer after curing Paolo Ferracin 5/11/2014

First Nb3Sn coil (101, low-grade RRP) Outer layer after curing Paolo Ferracin 5/11/2014

Coil winding conclusions The feed-back from the winding team about the stability of the insulated RRP cable during winding of coil 101 and 102 is extremely positive No clear popped-out strands were observed, also by partially unwinding some of the turns Similar conclusions come from LARP, which has wound 3 coils with RRP strand using the binder (and not tool) From the winding team, it seems also clear that the braided insulation plays a key role in improving stability However, it is not clear if, by simple visual inspection and touching the insulated cable during winding, a popped strand can be detected CERN coil 101 (low grade RRP) and LARP coil 1 will be cut to check Paolo Ferracin 5/11/2014

Appendix Paolo Ferracin 5/11/2014

Winding with twist ~90 degrees in 150-200 mm, tightening the cable Paolo Ferracin 5/11/2014

Winding with twist ~90 degrees in 150-200 mm, tightening the cable Paolo Ferracin 5/11/2014

Winding with twist ~90 degrees in 150-200 mm, tightening the cable Paolo Ferracin 5/11/2014

Winding with twist ~90 degrees in 150-200 mm, tightening the cable Paolo Ferracin 5/11/2014

Winding with twist ~90 degrees in 150-200 mm, tightening the cable Paolo Ferracin 5/11/2014

Winding with twist ~90 degrees in 150-200 mm, tightening the cable Paolo Ferracin 5/11/2014