Requirements of the support mechanics

Slides:



Advertisements
Similar presentations
LST Mechanical Design Review Utility Routing, Cableways & Crate Locations Peter Kim October 21, 2003.
Advertisements

TPC Proposal for the 35 Ton Liquid Argon Test Abstract We propose to equip the 35 ton cryostat with one APA and two CPA’s, and all the necessary equipment.
Zian Zhu Superconducting Solenoid Magnet BESIII Workshop Zian Zhu Beijing, Oct.13,2001.
Mechanical Status of ECAL Marc Anduze – 30/10/06.
ZQNA Electrostatic Quadrupoles for ELENA Transfer Lines 1.Conceptual design 2.Performance 3.Engineering details 4.Interfaces 5.Production planning D. Barna,
Experimental hall in Japanese mountain site Y. Sugimoto ILD MDI/Integration 1.
1 Design of Solenoid and iron yoke for GLD KEK Hiroshi Yamaoka Ken-ichi Tanaka July 13, ‘05.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD IR Mechanics 7 th B2GM.
Tracking Integration Challenges Y. meeting 2013/9/25.
Mickael Frotin– 07/06/2009 Demonstrator - Assembly ECAL meeting - London.
1 ILD/CMS Engineering Meeting M. Joré – ILD integration philosophy Integration philosophy of ILD Matthieu Joré – January 21st Integration of the subdetectors.
Task7: NUSTAR2 - Design and Prototype Construction of a Radiation-Resistant Magnet C. Mühle GSI Task leader: G. Moritz /GSI.
ILC / ILD TPC Requirements of the support mechanics Volker Prahl ILD Workshop 2013 Cracow
ALCPG11-Peterson1 Development of a Low-Material TPC Endplate for ILD Dan Peterson Laboratory for Elementary-Particle Physics, Cornell University.
1 Advanced Endplate - mechanics: Development of a Low-Material TPC Endplate for ILD Dan Peterson Laboratory for Elementary-Particle Physics, Cornell University.
EPRI SCDC Cable Review Meeting Palo Alto 24 th October 2006 Meeting May 22-26th Sevenoaks UK Progress since.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
11 SSD Power and Cooling on the Cone STAR Integration Workshop Howard Matis May 16, 2008 STAR Integration Workshop Howard Matis May 16, 2008.
ILD Magnet & calorimeters integration meeting Questions to be addressed 01-02
EUDET JRA3 ECAL in 2007 : towards “The EUDET module” C. de La Taille IN2P3/LAL Orsay.
LumiCal mechanical & sensors design Wojciech Wierba J.Błocki, E.Kielar, J.Kotuła, K.Oliwa, L.Zawiejski FCAL Workshop, IFJ PAN Cracow,
56 MHz SRF Cavity Cryostat support system and Shielding C. Pai
The HCAL barrel absorber structure
CALICE Si-W ECAL (& ILD) power pulsing (cabling) C.Clerc LLR, Ecole polytechnique, Palaiseau R. Cornat P.Mora de Freitas G.Musat J.-F. Roig.
Integration with LDC & Push-pull impact on LumiCal Wojciech Wierba Institute of Nuclear Physics PAN Cracow, Poland FCAL Workshop, LAL Orsay,
1 ILD meeting LAL M. Joré – Integration status Matthieu Joré – 25 th of May ILD integration status and open issues.
ILD Vertex Detector Y. Sugimoto 2012/5/24 ILD
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
CEA DSM Irfu - J-M Rey - EUCARD WP 7 Meeting - GRENOBLE 22/03/ HTS insert preliminary design and solenoid prototypes Mélanie Bruchon, Sandrine Cazaux,
Redesign of LumiCal mechanical structure W.Daniluk, E.Kielar, J.Kotula, K.Oliwa, Wojciech Wierba, L.Zawiejski Institute of Nuclear Physics PAN Cracow,
Update: Puck and Gun Magnet March 1, Magnetized Gun 2 K 2 CsSb Preparation Chamber HV Chamber.
IPN Lyon ILD Mechanical structure February 2015 Design, Integration & Services J.C Ianigro - IPN Lyon -
G-10 CPA March 2016 Bill Sands. Design Criteria Structure must support the CPA panels and Field Cage Differential contractions must be identified and.
Hcal Geometry and Assembly Videoconference January 2008, 24th.
Single-Phase ProtoDUNE Construction Planning Jim Stewart LBNC January 11, 2016.
1 ILD inner region integration meeting M. Joré – Introduction ILD inner region integration meeting Welcome words Charge of the meeting The current concept.
MEA Machine and Experiment Assembly Norbert Meyners, MEA 12. July 2007ILC IRENG07 WG-A1 LDC Engineering Design (Status) Introduction General Design Detector.
MicroBooNE High Voltage System and Feedthrough MicroBooNE Collaboration Meeting Hans Jostlein, December 3,
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
Ideas on TPC Assembly Volker Prahl, Thomas Schörner-Sadenius Paris, 8/9 October /9 October 2015TSS: TPC Assembly1.
Kitakami Side AHCAL Assembly or anywhere in any detector.
Development of a low material endplate for LP1 and ILD Dan Peterson, Cornell At previous meetings, , showed the carbon fiber molded.
TPC Support Installation 26 Apr 2016Dan Wenman Mechanical Engineer1 Overview Installation of the support rails Details of the rail from the SAS to the.
What’s new at LAL-LLR ( MDI issues) M.Jore, C.Clerc Visit at CMS Forward detectors meeting at LLR Vacuum in Beam pipe, first LAL results.
Update on PANDA solenoid design
High efficiency work and MBK development for accelerators
STRAW TRACKER SYSTEM CAD STATUS :
- CT INSTALLATION PROCEDURE OVERVIEW -
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Development of a low material endplate for LP1 and ILD
Very preliminary draft
Cooling pipes and Space for Services
New field cage LP2 Ole Bach, Bernd Beyer, Volker Prahl
cooling and supports of the forward endcap EMC
status of the second field cage
Update of experimental hall in Japanese mountain site
C.Clerc ILD session, ALCPG /03/2010
LumiCal mechanical design, integration with LDC and laser alignment
IFR detector mechanics
(A) (B) - CENTRAL SUPPORT FRAME - INFN-LNF - SPAS 1
First of all we will remind some numbers:
ILD-0 overall dimensions C.Clerc ILD meeting, Seoul 17/02/09
SiD Engineering Status Report
Dan Peterson: News on Advanced Endplate Mechanics
The Quench Detection-Wire-Feedthrough Plug-In of W7-X
Integration and IR Hall
Overview of mechanical design & construction
Final Design CGEM Workshop HIEP, 14/03/2017 M. Melchiorri - INFN FE.
WA105: Order Status IFAE Thorsten Lux.
Status of QQXF cryostat
Presentation transcript:

Requirements of the support mechanics ILC / ILD TPC Requirements of the support mechanics Volker Prahl ILD Workshop 2013 Cracow 24.09.2013

Overview Fixing points and requirements of the TPC support structure Estimated acceleration and forces Various designs of the support structure Dimensions of the support structure of the TPC Flat ribbon support TPC cable, cooling, gas feed and routing HV Cable and routing TPC installation, mounting, tooling, support and working space Outlook

Fixing points of the TPC support structure Main dimensions of the TPC (outside) Ø Od = 3616, r=1808 Ø Id = 658, r=329 Length = 4700 incl. endplate and cabling Various possible fixing points Only the cryostat is foreseen to support the TPC

Estimated acceleration and forces Values of basic peak acceleration a0 [m/s2] North site A 0< 1.5 m/s² South site A 0< 1.0 m/s² For the proposed Japanese sides Please have a look at the talk from O. Ferreira, LLR Ecole Polytechnique http://ilcagenda.linearcollider.org/conferenceDisplay.py?confid=5524. TPC weight for calculation: 2000 kg >20000 N (Incl. FTD, SIT, Vertex) Seismic load force: 3000 N in x,y,z calculated with A 0< 1.5 m/s² The additional force load in longitudinal direction of the bar support should not be an issue. Question: Which maximal amplitude can be accepted ? An max. deflection of 1mm will be the aim

Various designs of the support structure Two options would be followed Flat ribbon support Support in Z necessary Bar support rectangular or double T-bar system Stiffness and damping in Z direction possible Pros and cons of the flat ribbon suspension + Thin and small cross section design possible - Support system ~ 1600mm long Damping support in Z necessary! This can be an issue? Pros and cons of the rectangular or double T-bar system + Damping in Z possible Large cross section Support system ~ 1600mm long Now this space is not available!

Dimensions of support structure Necessary area for adjustment Support bar cross sections of rectangular and double T-bar 200 HCAL junction plate HCAL Flat ribbon support 55 Sketch not in scale ! 30mm no go zone Endcap An cantilever design is only possible if minimum of 4 gaps can be used

Flat ribbon support Screws or rivets Necessary to move 55mm in Z ! Adjustable in x,y,z

Support in Z- direction ! Flat ribbon support Support in Z- direction ! Stiff U-bracket mounted on the TPC- Endplate Incl. a spring to damping the TPC in Z Ballpoint connection will push on an plate mounted on the ECAL surface

TPC cable, cooling, gas feed and routing TPC infrastructure needs to be defined Type of cable Number of cables Cross section and or diameter Specification of the cables Tubes for cooling Gas feed

HV Cable and routing Overview of an first idea of the HV-cable routing Inside or outside of the TPC vessel HV-Cable feed through at the Endplate Laying inside of the wall Connect to cathode Gap for the HV-cable od=20mm should be provide, the bending radius maybe an issue

HV Cable and routing Samples of HV-cables Okonite Hi-Voltage Cable: www.okonite.com 100kV, od= 16,76mm, bending radius = 4*od > 70mm Heinzinger HVC100 Best. No.:00.220.853.9 www.heinzinger.com 100kV, od= 14mm, bending radius min. 280mm! FUG C 2124, Mat.- No.: 0502032124 http://www.fug-elektronik.de/webdir/PDF/e/Access_data_sheet.pdf 100kV, od= 11,2mm, bending radius min. 152mm A Coated Stranded Copper Conductors B Polyester Insulation C Extruded Semiconducting Layer D Primary Insulation – Okoguard E Extruded Insulation Shield F Coated Copper Braid G Jacket – Okoseal  Cross section of the HV-cable: 255-300mm2 necessary

TPC installation, mounting, tooling, support and working space Basic questions has to be solved Installation of the inner detector (carbon fiber support tube) Independent assembly from the TPC necessary Installation steps of the TPC Central Electrode has to be mounted and connected with the HV-cable HV-Cable glued into the TPC or fixed at the vessel Patch panel necessary for the HV-cable Assembling steeps of the Endplate and the inner Vessel of the TPC Cabling and Cooling Alignment Combined sliding tool should be discussed it can be used for: Mounting of the central electrode TPC assembling and moving Installation of the central tube Something else Min 3 times longer as the TPC !

Conclusion and outlook Support system with min. 4 bars necessary Required space is an issue with the infrastructure and gaps between and in the middle of the HCAL / ECAL octagons Various cross sections and materials of the support bars are calculated Two support systems available Outlook Availability of space in the gaps has to be evaluated More FEA studies in progress (I-DEAS and/or Ansys) Minimize the cross section of the support bars depends on the requirements Space for the HV-Cable necessary, the place holder model will be prepared soon HV-cable bending radius can be an issue Field cage vessel studies should start