Production Cavities in progress

Slides:



Advertisements
Similar presentations
6/Nov/2012 TTC Meeting 1 Improvement of cavity performance by T-mapping/X-ray-mapping, optical inspection and local grinding Kirk.
Advertisements

KEK cavity status, March 2011 H. Hayano, ALCPG11, WG3, Eugene.
SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
Superconducting RF Cavity/Cryomodule Development at Fermilab (Industrialization) C.M. Ginsburg (FNAL) Proton Accelerators for Science and Innovation 2.
US Cavities Status and Plan Mark Champion 01 October 2009.
Overview of the ILC and SRF Program (With an emphasis on Px) Shekhar Mishra ILC & SRF Program Fermilab.
ILC08 Chicago Global Design Effort 1 Discussion of Optical Inspection and Temperature mapping Results Several new inspection and mapping systems.
Cavity Gradient Yield Plots Update, August, 2009 As reported by Akira Yamamoto to the EC and the ILCSC August, 13, 2009 On behalf of the ILC Cavity Global.
Single cell coordination. Single Cell Cavity Activity Outline 1.ANL EP optimization (TE1AES005) 2.R&D cavities A. Tumble, 2 cavities (TE1ACC004, NR-6,
Jim Kerby, Fermilab for Rongli Geng and the S0 Cavity Team 23 May 2010 Current Status of SCRF Cavity Development SCRF Cavity Technology and Industrialization.
SRF Cryomodule 2 Cavity Test Results Andy Hocker TD/SRF Dev Dept. All Experimenters Meeting, 10-OCT-2011.
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
Americas S0 Plan in USA Shekhar Mishra Fermilab/GDE US Main Linac Cavity and Cryomodule WBS.
Plans for Future SRF Infrastructure Shekhar Mishra ILC Program Fermilab.
ILC Cavity and Cryomodule Overview Shekhar Mishra Fermilab.
Summary of Main Linac SCRF-part H. Hayano, ILC08 at UIC.
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
9-cell cavity coordination CM Ginsburg 8 Mar
Cavity Gradient for the R&D and ILC Operation Akira Yamamoto ILC-GDE SCRF Presented at the AD&I meeting held at DESY, Dec. 2-3, 2009 A, Yamamoto,
TILC09 / SCRF Session Update on S0 Work in the Americas Region Mark Champion, Fermilab With slides provided by: Zack Conway, Cornell Rongli Geng, Jefferson.
Parallel session summary ML/SCRF L. Lilje, H. Hayano, N. Ohuchi, S. Fukuda, C. Adolphsen (with help of Chris Nantista) TILC09,
Achievement of 41 MV/m Gradient by AES8 Rong-Li Geng Jefferson Lab ALCPG09, October 1, 2009.
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
Global Design Effort 1 S0 Status High-Gradient cavities Lutz Lilje DESY supplement by H. Hayano 04Sep2008 EC
R.L. Geng, 5/27-31,2013 ECFA LC2013, DESY 1 Update on Raising Q0 at Ultra-High Gradient via Large-Grain Niobium Material Rongli Geng Jefferson Lab ECFA.
R&D Expected in Cooperation with Vendors ILC Baseline Assessment Workshop Mark Champion September 09, 2010.
SRF Processing at ANL: Progress and Plans ANL: Mike Kelly, Scott Gerbick FNAL: Dan Olis, Allan Rowe Speaker: Mike Kelly November 17, 2008.
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
F Fermilab ANL/FNAL SCPF EP/HPR Processing Status and Plan Allan Rowe TD/SRFDD.
ILC Cavity Gradient R&D Plan Proposal for Release 5 Rongli Geng for ILC Cavity Group 2jun2010 ILC SCRF WebEx Meeting 6/2/20101ILC SCRF WebEx Meeting.
Superconducting rf test facility LCWS 2010 in Beijing, 28 Mar 2010, Ken Watanabe Replica-method and local grinding repair K. Watanabe (KEK) LCWS 2010 in.
(1)[12~13/Dec/2009] Optical inspection (2)[14/Dec] frequency & field flatness measurement (3)[10/Mar/2010] pre-EP (5μm) (4)[11/Mar] EP1 (100μm) (5)[11/Mar]
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
HiGrade-Kickoff DESY Global Design Effort 1 ILC-HiGrade WP6 High-Gradient cavities Lutz Lilje DESY.
10/1/09 R.L. Geng ALCPG09, Albuquerque, NM 1 Cavity R&D Status and Future Plans - with a partial summary of SRF2009 Rongli Geng Jefferson Lab.
Update on S0 Work in the Americas Region Mark Champion 17 June 2008.
Current study status of high gradient at KEK Fumio Furuta KEK SCRF meeting Fermilab. Apr
Americas S0 Cavity (Tesla-style) Test Philosophy and Test Status results from JLab, Cornell and FNAL C.M. Ginsburg (FNAL) GDE SCRF Meeting April 21, 2008.
Explosive Events during V.T. in KEK ECFA (2013/5/30) 1.
JLab Update Rongli Geng April 30, th LCC ILC Cavity Group Meeting.
Centrifugal Barrel Polishing at Fermilab (Tuesday, December 6th at 10:20) Tesla Technology Collaboration IHEP, Beijing December 5 th -8 th, 2011.
FNAL SRF Program: 1.3 GHz Camille M. Ginsburg (FNAL) Fermilab Accelerator Advisory Committee November 7-9, 2011.
Plans for Gradient R&D and Cavity Processing and Testing in the Americas Region in FY08-09 Mark Champion 21 April 2008.
Update on S0 Work in the Americas Region Camille Ginsburg (FNAL) 2 June 2009 Slides/Info from: Zack Conway (Cornell) Rongli Geng (JLab) Genfa Wu, Dmitri.
Recent FNAL/ANL Cavity Performance C.M. Ginsburg (FNAL) On behalf of the FNAL/ANL Cavity Crew TTC Meeting - Milano 28.Feb.-3.Mar
Gradient Degradation Experience at Fermilab (NML/CM-1) Elvin Harms TTC Meeting, Beijing 5-8 December 2011.
9-cell cavity coordination CM Ginsburg 15 Mar
SRF Collaboration Shekhar Mishra Fermilab. Overview Charge: Does the laboratory make effective use of collaboration and existing SRF capabilities at other.
JLab Update Rongli Geng, Ari Palczewski, Yongming Li December 11, rd ILC Cavity Group Meeting.
1.3 GHz Cavity/Cryomodule Performance Camille M. Ginsburg (FNAL) FNAL-LBNL joint meeting on SRF Cavities and Cryomodules March 15, 2012.
Americas Report C.M. Ginsburg (FNAL) for the FNAL/ANL, JLab, and Cornell (no report this time) cavity teams S0 Meeting 7.June 2011.
Status Report of the Review of Vacuum Systems and Procedures Tug Arkan, Allan Rowe 3/7/
Plasma cleaning Laser re-melting technique at FANL M. Ge, G. Wu, J. Ruan, J. Ozelis, T. Nicol, D. Sergatskov, D. Hicks, L. Cooley Fermi National Accelerator.
Rongli Geng ILC Cavity Group Meeting October 25, 2011
Cornell Updates Commissioning of T-map for ILC single cell starts.
ILC10 Beijing Global Design Effort
Electropolishing of Dressed ILC 9-cell Cavity
ILC R&D Board Meeting: SRF Cavities Status and Plans
Cavity Gradient R&D Status and Future Plans for TDP-2
Energy (ILC) and Intensity (Project X) SRF Cavity Needs
FNAL recent coupler troubles
Rongli Geng Jefferson Lab & GDE
for the FNAL/ANL, JLab, and Cornell cavity teams
S0 Status report from KEK
ILC Cavity & Cryomodule Overview
9-cell Vender Qualification test for LCLS-II
Recent VT Results in the STF-2 cavities
TTC Meeting, 28 February - 2 March, 2011, Milan
CEPC Waveguide HOM 5-cell and 2-cell Cavity Study and EP Facility
Cavity & Cavity Integration; recent KEK activities
Presentation transcript:

Production Cavities in progress TB9ACC013 (dressed) Cold coupler removed in cleanroom and flange blanked off (all other hardware still attached); suspicious feature found; discussions with SLAC ongoing; Questar inspection of cavity by 4/21 using provisional setup, then HPR unless something plan-changing is found during the inspection Initial Questar inspection of the ends will be Friday 4/9 TB9AES009 (dressed) at HTS; Eng Note signed yesterday; cooldown started this morning ACCEL8 (dressed) in MP9 cleanroom for cold-end coupler assembly; prep for HTS TB9AES008 (dressed) at ANL for HPR TB9AES010 (dressed) Will be next for HTS prep after TB9AES008 TB9ACC016 Ti ring welding at Sciaky was completed 3/31; now at IB4 for CMM TB9AES007 (@JLab) 41 MV/m vertical test at JLab 3/16. To be sent back to FNAL soon. Will HPR and VTS prep at FNAL/ANL facility upon receipt, then vertically test at IB1; then joins the dressing queue TB9RI018 (@JLab) vertical test took place before final EP (goal: qualify furnace): 21 MV/m with field emission limitation; was light EP’d; currently in 120C bake; test Mon 4/12 (continued…) 7 Apr 2010 CM Ginsburg Cavity Scheduling Mtg *=bulk-EP’d at RI

Production Cavities (cont.) TB9RI024* Vertical test 4/8 TB9RI026 At ANL light-EP and VTS prep; due Fri 4/9 at VTS; 120C bake this weekend; test Mon.4/12 TB9RI019 (@JLab) Being tuned now after 800C HT; to be degreased and HPR’d Tue. 4/13; will subsequently vertically test without final EP TB9RI029* (@JLab) To return to FNAL after 800C HT 4/9 for tuning, optical inspection and light EP+VTS prep TB9RI021* at JLab for 800C HT (TBC; departed FNAL 4/2) TB9RI022* done with optical inspection 4/2; to go to JLab for 800C HT TB9RI020 done with optical inspection 3/31; destination TBC TB9RI027 done with incoming inspection 3/23; to optical inspection TB9RI028 incoming inspection started TB9NR001 inspection started TB9NR002 to be inspected TB9RI025* to be inspected TB9RI023* (repaired) to be inspected, partially for a second time Next new cavities The first two Niowave-Roark cavities arrived 3/30 – to be pushed to the front of the incoming inspection line; remainder due ~June The first AES cavities are expected to arrive soon 7 Apr 2010 CM Ginsburg Cavity Coordination Mtg *=bulk-EP’d at RI

R&D Cavities in progress AES003 (spot polished at KEK) Optical inspection showed interesting features which may explain persistent field emission; by-hand spot polishing, tuning complete Light EP was 4/2; VTS prep in progress; to IB1 Apr.15/16; vertical test possibly week of April 19 ACCEL6 and ACCEL7 Held in reserve as CM2 backup cavities until they can be replaced by better cavities TB9ACC014 (after dented cell was tuned to lower field) Vertical test 15.Feb.: 29 MV/m at 2K; some FE observed. Q0 @max grad=1.4E10 max gradient to be confirmed by 24.Mar – still waiting 4/8 retest 4/16 with second sound and different thermometry configuration second sound system in IB1 with at least 6 sensors (8 would be ideal) TB9ACC017 Defect on cell 4 equator to be molded at Fermilab using Fermilab technique soon TB9AES006 (@JLab) Repair defects in cell 5 TB9ACC010, ACCEL9, TB9AES005, TB9ACC015 (@ Cornell) are in various stages of tumbling and VEP.  Being used for VEP commissioning and performance improvement. TS7MSU001 & TS7MSU002 (visual inspection and tuning only, then return) Visual inspection complete, field flatness measurement complete, tuning complete at FNAL Have arrived back at MSU, where they will be processed and tested 7 Apr 2010 CM Ginsburg Cavity Coordination Mtg

9-cell Cavities - By Facility Incoming inspection Next: TB9RI028, TB9NR001, TB9NR002, TB9RI025*, TB9RI023*[returned] partially to be completed Tuning/field flatness measurement Next for tuning: TB9RI029* (upon return from JLab ~early next week), TB9RI021* (after JLab furnace visit) Next for FF: TB9NR001, TB9NR002, TB9RI025*, TB9RI023* Optical Inspection Next: TB9RI027, TB9NR001 (after incoming inspection complete), TB9NR002 (after incoming insp.) FNAL/ANL (bare – for VTS prep) TB9RI026 light EP+VTS prep, AES003 light EP+VTS prep; more light EPs to come down pipeline [TB9RI029*, TB9RI021*, TB9RI022*, then somewhat later TB9RI025*, TB9RI023*]; also several heavy EPs on NR and new AES cavities (dressed – for HTS prep) TB9AES008 (after TB9RI026), TB9AES010 VTS Second sound system commissioning in progress; to be complete for TB9ACC014 test TB9RI024* 4/8; TB9RI026 4/12; TB9ACC014 (with second sound and modified thermometry) 4/16, TB9AES007, AES003, another test of TB9AES007 after dressing, same subsequent list as FNAL/ANL (bare) above HTS TB9AES009 (3 week test duration; out week of April 19(TBC)), ACCEL8 (test duration: 2 weeks proposed), TB9AES008 (test duration: 2 weeks proposed), TB9AES010 (test duration: 2 weeks) MP9 TB9ACC013 (dressed) cold coupler discussion, then Questar inspection; TB9AES009 (dressed) after HTS; HTS prep follows for ACCEL8 (dressed), TB9AES008 (dressed), TB9AES010 (dressed); TB9ACC016 then TB9AES007 are next for dressing Cryomodule-ready [None] 7 Apr 2010 CM Ginsburg Cavity Coordination Mtg

CM Ginsburg Cavity Coordination Mtg 7 Apr 2010 CM Ginsburg Cavity Coordination Mtg

CM Ginsburg Cavity Coordination Mtg Data in preceding plot Americas S0 Cavities sum= 48 S1-Global cryomodule-ready dressed+tested dressed+being tested dressed VTS qualified for dressing backup in process+test before process expected R&D path, dressed R&D path, bare AES004 TB9ACC013 TB9ACC009 ACCEL8 TB9ACC016 ACCEL6 TB9RI026 TB9RI023 TB9AES011 AES001 AES003 TB9ACC011 TB9AES008 TB9AES007 ACCEL7 TB9RI024 TB9RI021 TB9AES012 AES002 JLab-1 TB9AES010 TB9RI018 TB9RI029 TB9AES013 JLab-2 TB9RI019 TB9RI020 TB9AES014 ACCEL9 TB9RI022 TB9AES015 TB9AES005 TB9RI027 TB9AES016 TB9ACC010 TB9RI025 TB9NR003 TB9ACC015 TB9RI028 TB9NR004 TB9ACC014 TB9NR001 TB9NR005 TB9ACC012 TB9NR002 TB9NR006 TB9ACC017 LG1 LG2 TB9AES006 sum 2 1 3 4 10 13 not available available for CM 7 Apr 2010 CM Ginsburg Cavity Coordination Mtg