Texas Nodal Load Frequency Control (LFC) EDS 3 R6

Slides:



Advertisements
Similar presentations
Lead from the front Texas Nodal 1 EDS 3 Release 5 and 6 Friday Market Updates Aug 08, 2008.
Advertisements

Real-Time Transmission Congestion Management & Market Effects
SBBH Flag Implementation QMWG October 11, SBBH Flag - Background SBBH Flag - Background: –The SBBH acronym stands for “SCED Base Point Below HDL”
October 22, 2007 TPTF Meeting Early Delivery Systems Status Update and Forecast Daryl Cote/John Webb/John Hall.
Lead from the front Texas Nodal Version EDS 3 R6.3 8 Focused Input Test (FIT) II Web Ex Texas Nodal Load Frequency Control.
June 12, 2008 ROS SEM Go-Live procedure Linda Clarke.
ERCOT IT Update Ken Shoquist VP, CIO Information Technology Board Meeting May 2004.
NSRS deployment April John Adams ROS – May 12, 2005.
April, 2008 Maximum Shadow Price. April, 2008 Protocol Requirement: Transmission Constraint Management (2)ERCOT shall establish a maximum Shadow.
SO – CART Project Status Protocol Revision Subcommittee Update 2/23/06.
EDS 2 Early Delivery Systems Review and Request for Approval May 2007 John Webb.
Lead from the front Texas Nodal 1 Texas Nodal Load Frequency Control (LFC) EDS 3 Release 6 - Handbook EDS 3 Release 6 MP Planning.
1Texas Nodal Market Trials Update. 2Texas Nodal Full System Market and Reliability Test 24-Hour Test Observations Duration of Test for Week of 8/ Hour.
Lead from the front Texas Nodal 1 Texas Nodal Load Frequency Control (LFC) EDS 3 R6.1 EDS 3 Release 6 LFC Workshop October 10, 2007.
ROS Meeting – 12/06/071Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 12/06/2007.
WGR Ramp Rate in Nodal: “As High as Possible” Mike Grimes for QMWG Meeting 10 August 2009.
NPRR XXX: PRR 307 Inclusion in Nodal…Part II. Questions Raised 06/26/06 Section 3 –COP (resource parameters) –CLR participation limits –Telemetry Requirements.
Lead from the front Texas Nodal 1 EDS 3 Release 5 Monday / Friday Market Updates April 18, 2008.
January 21, 2010 Security Constrained Economic Dispatch Resmi Surendran.
Presentation to House Regulated Industries Committee Chairman Phil King Trip Doggett Chief Operating Officer The Electric Reliability Council of Texas.
1Texas Nodal Market Trials Update. 2Texas Nodal LFC Testing Review Review of materials presented at TAC Changes in Market Trials schedule and activities.
Lead from the front Texas Nodal Version Workshop: 2-Hour Full-System Load Frequency Control (LFC) Testing (fka, EDS 3 R6.3.
Lead from the front Texas Nodal 1 EDS 3 R6.2 Testing Overview Texas Nodal Load Frequency Control (LFC) EDS 3 Release 6 LFC WebEx.
Lead from the front Texas Nodal 1 Texas Nodal Congestion Revenue Rights (CRR) EDS 3 Release 7 - Overview EDS 3 Phase 2 MP Planning.
EDS 2 Early Delivery Systems Release 3 – WebEx Conference July 10, 2007.
Lead from the front Texas Nodal 1 Integrated ERCOT Readiness and Transition (IRT) TPTF - November 6 th, 2006.
© Property of ERCOT /17/20041 RTCA, CAM, and SFT Presented by: John Adams November 17, 2004.
ERCOT Operational Audit 2005 August 1 - August 19, 2005.
Congestion Management and Ramp Rate for Delivering Ancillary Services Resmi Surendran.
7 August, 2006 TPTF MMS Issues Review Brandon Whittle Lead, Real-Time Market Operations.
July 10, 2008 ROS Early Delivery Systems Status – R6.3 2 Hour Test John Dumas and Jeff Gilbertson.
Appeal of PRS Action NPRR 351, Calculate and Post Projected Non-Binding LMPs for the Next 15 Minutes Floyd Trefny Texas Steel Companies.
1 Tests for Reasonable LMPs & Price Validation Tool Overview October 27, 2009 NATF.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
February 5, 2008 TPTF 168 Hour Test Follow up discussion.
Lead from the front Texas Nodal 1 Texas Nodal EDS 3 Early Delivery System Plan TPTF April 02, 2007.
1 Readiness Scorecard – May ‘10 NATF Brandon McElfresh Nodal Readiness and Transition May 4, 2010.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Load Frequency Control (LFC) Business Requirements Energy.
Lead from the front Texas Nodal 1 Texas Nodal EDS 3 Early Delivery System Plan TPTF April 24, 2007.
1 Market Trials Update NATF May 4, 2010.
14 Minute Ramp Period Testing Workshop June 30, 2009.
“Managing the Integration of Energy Storage Technologies” Kenneth Ragsdale ERCOT.
DSWG Update to WMS 2/9/2011. EILS Procurement Results from 1/31 Business Hours 1 HE 0900 through 1300, Monday thru Friday except ERCOT Holidays; 425 hours.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
Lead from the front Texas Nodal 1 Texas Nodal EDS 4 Early Delivery System Plan TPTF May 22 nd, 2007.
PDCWG Report to ROS January 13, 2011 Sydney Niemeyer.
Lead from the front Texas Nodal 1 Integrated ERCOT Readiness and Transition (IRT) TPTF – December 4 th, 2006 ERCOT Qualification.
1 Market Trials Open Market Participant Call Weekly Kick Off May 10, 2010.
09/20/20061 RTCA, CAM, and SFT Presented by: John Dumas September 20, 2006.
Lead from the front Texas Nodal 1 Nodal Transitional Qualification Approach to Qualifications for the Nodal Market August 16, 2007.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
Lead from the front Texas Nodal 1 Early Delivery System Testing Environments & Planning – Involving Market Participants TPTF May.
EDS 3 Release 5 SCED Testing Update - TPTF Daryl Cote August 28, 2007.
Lead from the front Texas Nodal 1 Texas Nodal EDS4 - Approach 11/28/2007.
Lead from the front Texas Nodal 1 Texas Nodal Energy & Market Management System EMS/MMS Projects Requirement Documents November.
August 11, 2008 TPTF Early Delivery Systems Status Daryl Cote.
1 Readiness Scorecard – Market Readiness Series Brandon McElfresh Nodal Readiness and Transition January 28, 2010.
EDS 2 Early Delivery Systems Approach March 2007.
August 11, 2008 TPTF EDS Sequence and Durations Discussion Daryl Cote.
“Look Ahead SCED” Sai Moorty ERCOT November 28, 2011.
Market Trials Update NATF March 2,
Market Trials Open Market Participant Call
Cutover Market Call November 29, :30 PM
EDS 3 R6.3 Testing Workshop EDS 3 Release 6.3 LFC Web Ex June 11, 2008
NPRRs 815NPRR Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service.  This Nodal Protocol Revision Request (NPRR) revises.
Current FRRS Language & Explanation of Posted Data
Congestion Management and Ramp Rate for Delivering Ancillary Services
Paul Wattles, Sai Moorty ERCOT Market Design & Development
Market Trials QSE Qualifications
The New Texas Wholesale/Retail Market
Presentation transcript:

Texas Nodal Load Frequency Control (LFC) EDS 3 R6 Texas Nodal Load Frequency Control (LFC) EDS 3 R6.3 EDS 3 Release 6 LFC Workshop October 10, 2007 http://nodal.ercot.com 1

LFC – R6.3: LFC Total System Test Presentation: R6.3 Overview Additional Pre-requisites R6.3 Test Procedure FAQ’s and Discussion http://nodal.ercot.com 2

LFC – R6.3: LFC Total System Test Overview – Testing scheduled between June and August (completed before the EDS 4 R9, 168 hour test) ERCOT to verify the ability to control system frequency with LFC with all QSE and Resources (total system) providing Regulation and following Base Point in Nodal. Verify LFC’s ability to meet NERC control systems performance criteria Will require three tests of approx. 2, 8 and 48 hours. A QSE’s Resource(s) must have displayed the ability to follow Regulation instructions during EDS 3 R6.2 testing in order to provide Regulation during EDS 3 R6.3. http://nodal.ercot.com 3

LFC – R6.3: LFC Total System Test Market Participant Involvement – All QSE’s providing Regulation will be required to follow the Regulation instructions from Nodal (LFC). Each Resource obligated to provide Regulation must deploy Regulation during the test period as per the Nodal Regulation signal and the telemetered Participation Factor. Ratio of the Regulation obligation of the QSE under test to the total ERCOT requirement will be based on the outcome of the Zonal Ancillary Service Market SCED will calculate 5 minute Base Points, and the QSE must follow the LFC 4 second Updated Desired Base Point. All QSE’s must provide Energy Offer Curves for SCED, which will be representative of the same QSE portfolio Balancing Energy Service submitted in the Zonal system. http://nodal.ercot.com 4

LFC – R6.3: LFC Total System Test Market Participant Involvement – QSEs will continue to update their Resource Plans, Base Power Schedules and Zonal portfolio Offers during the test periods. The constraints activated in Zonal will also be active in Nodal. QSEs shall continue to update their Zonal schedules and Balancing Energy Service offers. During the test, QSEs should follow the LFC 4 second Updated Desired Base Point provided by the Nodal system and ignore the OOME Dispatch Instructions from the Zonal system. http://nodal.ercot.com 5

LFC – R6.3: Additional Pre-requisites SCED Pre-requites – EDS3 Release 5 - SCED Completed Submit and adjust Energy Offer Curves and Resource Output Schedules using MIS user interface or machine-to-machine interfaces    Download and review SCED Base Points for Resources through MIS user interface or machine-to-machine interfaces Review LMPs  SCED Validation Includes MP Input Validation SCED testing with ICCP (Third phase of SCED testing, Offer Curves will be created by MPs based on the defined formula and methodology as outlined in the Nodal Transition Plan). Six Month LMP complete (initial period use SCED MP offer methodology, second period allow MPs to submit any Offers and Output Schedules) Will need a test where offers are submitted to match Zonal bids Compare SCED results to Zonal dispatch for agreement http://nodal.ercot.com 6

LFC – R6.3: Additional Pre-requisites TCM/RTCAM Prerequisites – A Comparison test of TCM to RTCAM will be performed prior to R6.3 tests. Test TCM for correct shift factors, same Generator dispatch direction (raise or lower) and similar MW amounts. Both real-time contingency analysis (RTCA) and CA within the study network sequence (STNET) will be required to compute shift factors and hence will have NETSENS tightly integrated. RTCAM and TCM both set to a 3% cutoff for Gen Shift factors http://nodal.ercot.com 7

LFC – R6.3: Test Procedure (Entrance and Execution) Abort ERCOT complete all Pre-requisites and system checks No Request one QSE to Nodal System stable Correct Problem No All QSE’s on Nodal Yes No Monitor System and Record Data Yes A http://nodal.ercot.com 8

LFC – R6.3: Test Procedure (Exit) No Correct Problem Request one QSE to Zonal System stable A All QSE’s on Zonal Yes No End of Test Yes http://nodal.ercot.com 9

LFC – R6.2: FAQ’s FAQ’s and Discussion http://nodal.ercot.com 10

A role call of QSE’s will be performed before the test. LFC – R6.2: FAQ’s Q: How will ERCOT communicate instructions to discontinue the test or to switch between Zonal and Nodal control once the test has begun? A: All communication and instructions during the test will be done through the ERCOT Control Room Operator. A conference call number (and a secondary back-up) will be provided before the test, and will allow open communications between ERCOT and all MPs at all times during the test. A role call of QSE’s will be performed before the test. See previous slides on Test Procedure ‘Entrance and Exit’ steps. http://nodal.ercot.com 11

LFC – R6.2: FAQ’s Q: How will ERCOT coordinate the selection of active constraints for RTCAM and SCED? A: The constraints activated in Zonal System during the test will also be activated in the Nodal system and will be coordinated by the ERCOT Control Room Operator. ERCOT will monitor the active constraints in Zonal and Nodal and the relevant shift factors to ensure the expected actions are occurring. Managing constraints in Zonal and Nodal will be a pre-requisite ‘test’ for ERCOT to complete before scheduling the Total System test. http://nodal.ercot.com 12

LFC – R6.2: FAQ’s Q: Will the same power flow solutions be used in both Zonal and Nodal congestion management systems? A: Zonal and Nodal will be operating from different State Estimators, but both will have the same power flow solutions The Nodal EMS State Estimator, Constraint Equations and Power Flow solutions are verified in EDS 2 Release 3. http://nodal.ercot.com 13

Q: How will ERCOT calculate its CPS1 and CPS2 test scores ? A: LFC – R6.2: FAQ’s Q: How will ERCOT calculate its CPS1 and CPS2 test scores ? A: The ERCOT Nodal EMS will calculate and store the CPS1 and CPS2 scores. ERCOT will validate the scores and report the results to the market. http://nodal.ercot.com 14

Discussion and Questions? LFC – R6.2: Questions? Discussion and Questions? Thank you. EDS3@ercot.com http://nodal.ercot.com 15