MD#2 News & Plan Tue – Wed (19. – 20.6.) DayTimeMDEiCMP Tue06: GeV  4 TeV: Ramp for chromaticity - missed A 08:00Ramp down 10: GeV: Large.
Advertisements

Lot’s of time lost due to cryo problem in IR8. Major impact, therefore review of MD program… Start discussion here, please let us know your input. Will.
LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
First measurements of longitudinal impedance and single-bunch effects in LHC E. Shaposhnikova for BE/RF Thanks: P. Baudrenghien, A. Butterworth, T. Bohl,
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
Friday to Saturday 02:00: Machine closed. 09:00: Cryogenics all OK. Preparing pre-cycle. 10:00: Pre-cycle started. 11:30: Pre-cycle finished. 14:00: Beam.
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
Nominal intensity bunches ● First ramp with nominal intensity bunches suffered from an instability appearing around 1.8 TeV. ● Nominal intensity bunches.
Tuesday 17 th April 04:00 Prepare second fill for v/d Meer scans. 06:22 Stable beams, v/d Meer scans for Alice and LHCb. 13:20 End v/d Meer scans.Dump.
Shortened program (2 days), as decided in LMC. MD program worked very well  all MD’s on plan with ~foreseen beam time. LHC in very good shape with excellent.
Cryo back at 17:30 Beam back at 19:00 IR2 aperture until ~03:00 Since then no beam from the SPS:  Connector problem on MKD  Connector eroded, needs to.
LHC 8 & 9 May :10: Injection kicker B1 faulty on oil level –Check in UA and RA. Leaks fixed, to be further checked in TS1 10:30: Pre-cycle started.
Lumi scan limits checked (in preparation for next fill VdM scans).  Trims of up to 150 um per beam in IP1 & IP2 both planes both beams were done (IP5.
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
Ion Commissioning: Thursday & Friday
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
MD Planning Fri – Sat (26. – 27.8.)
M.Fitterer, A.Patapenka, A.Valishev (FNAL)
Wednesday 8.9 External crossing angles:
1st LHC MD Period Started
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Saturday 24 March 2012.
MD2036: UFO dynamics studies and UFO fast detection
Summary Friday h38: Ramp down and pre-cycle.
MD Report 24 June 2012 Machine coordinators: Barbara Holzer, Mike Lamont MD Coordinators: Ralph Assmann, Giulia Papotti, Frank Zimmermann MD#2 News & Plan.
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
LHC Morning Meeting - G. Arduini
Thursday morning – optics correction
Monday 18 October : Collimation system
Tuesday 23/11/10 8:00 Physics fill #1511 dumped
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
MD#4 Progress MD Coordinators: Giulia Papotti, Frank Zimmermann
Summary of Week 16 G. Arduini, J. Wenninger
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Lost at 12:05 to power converter (RTQX2.R1) problem
Wed :40 Lost S78 - QPS controller.
Week 35 – Technical Stop and Restart
Friday 14th December - morning
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Monday February 28th 8h00: Injection
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
MD#4 Progress MD Coordinators: Giulia Papotti, Frank Zimmermann
Wire almost entirely through beam before BLM triggers dump
Yesterday morning Held 1647 for a while – SPS kicker problem
Wednesday 09 March …:09:00: beta* measurement (1.5 m) by K-modulation and with AC-dipole excitation. 1/17/2019 LHC 8:30 meeting.
Saturday 7th May Sat – Sun night
Friday 23rd March 08:00 Access
(on behalf of the LHC team)
Summary Thursday h21: Stable beams fill #1303.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Aims for the week Recover from technical stop and precycle at 10A/s
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Collective effects in the SPS and LHC (longitudinal plane)
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Wednesday h10: Programmed dump. 07h54: Injection. 200b.
Saturday :42 stable beams fill 3541
LHC Morning Meeting - G. Arduini
Summary Tuesday h23: Machine closed. Precycle started.
Wednesday 23/2 Thanks CRYO!!!.
Fri :52 Stable beams fill #2536
Another Immortal Fill….
Thursday Morning/Afternoon
Wednesday :35 : Beam lost because of trip of RCBXH3.L1
Wednesday 8th (I) 09:22 Fill #1855. Beams dumped by Alice dipole trip Stable beams for 10.5 hours; int. lumi 31 pb-1 After investigation EPC could not.
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

Saturday 21st April 00:33 Interlock during ramp on BLM HV 02:46 Again, interlock BLM HV during ramp, with reduced bunch intensity 05:12 Pilot ramp for tune measurement. 05:26 Dump beams - ramp down - long. impedance MD 13:30 Start transverse damper (ADT) MD 17:06 Dump at full energy – end of ADT MD 18:30 Collimation MD @ 4 TeV starting 20:30 Beam dumped at 4 TeV, collimator moving into beam 00:14 B2 XPOC and IPOC failed due to no data for the MKD. This was due to the server cfi-ua67-mkdpm2 being down. Reset. 02:30 Aperture MD starting with beam at 4 TeV 07:20 Beam lost at 4 TeV while kicking with AC dipole for aperture measurements 07:20 Preparing RF batch by batch blow-up planned to start at 09:00 22/04/2012 LHC 8:30 meeting

Longitudinal impedance MD 3 fills with Beam1 and 2, each with 8 bunches of varied. The first fill was with large longitudinal emittance (bunch length in SPS 2.0 ns). The 2nd fill had no controlled long. emittance blow-up in the SPS and the 3rd fill was with blow-up in the SPS and phase loop was switched off. We nevertheless observed that higher intensity bunches were longer. In the LHC measurements of the stable phase, bunch profiles, transverse emittances and Schottky spectrum were done for standard conditions and for BSRT and TDI in and out. Some effect was visible for TDI movement, more details will come after analysis and simulations (as for IBS). 22/04/2012 LHC 8:30 meeting

Transverse damper MD Checked all dampers and determined damping time from injection oscillations; the differences observed need to be followed up in the technical stop and a "re-normalisation" is to be done Emittance data to be analysed The gain modulation batch-by-batch was commissioned First bunch 1.7x10**11 & 7 trailing bunches at 1.5x10**11 . Ramped with the first nominal bunch without damper; recorded emittances. Relative damper gains used for the 8 bunches Bunch with zero damper gain clearly blown up; also tendency visible for the other bunches of the train, but emittance measurements show large scatter; larger emittances measured in the ramp than at flat top: to be further analysed 22/04/2012 LHC 8:30 meeting

Saturday, April 21, 2012, ADT 4 hours Part 1: 1.5 hours (scheduled) first checked damping time in single bunch mode for high gain and low gain (0.25 and 0.02 in LSA)  follow-up of difference between the two planes and beams during technical stop, then re-check after technical stop injected one nominal bunch (1.4-1.5x10**11) and waited about 40 minutes at 450 GeV observing emittances; 12 minutes with high gain, 11 minutes with low gain and 10+ minutes with high gain  emittance data to be analyzed offline damping times: (ratio high / low gain in LSA: 12.5; fillamentation significant for low gain setting ! single bunch mode at high gain between  11 and 19 turns single bunch mode at low gain between  73 and 127 turns 50 ns settings high gain (expected 3x slower than single b. setting)  35 to 51 turns 21.04.2012 LHC MD block 1 / ADT

Saturday, April 21, 2012, ADT 4 hours Part 2: 2.5 hours commissioned batch-by-batch gain modulation factor of 0-127 in steps of 1 8 bunches injected with gains of ADT scaled by (0, 1, 2, 5, 12, 30, 70, 127)/128 verified by observing injection damping bunch 1 gain 0 Bunch 3 gain 2 bunch 1 gain 12 Bunch 8 gain 127 g gain 12  approx. prepare for ramp (LSA 0.02) gain 127  high gain (LSA 0.25, injection setting) first 4096 turns of the horizontal beam 1 injection oscillations are shown 21.04.2012 LHC MD block 1 / ADT

Saturday, April 21, 2012, ADT 4 hours Part 2: 2.5 hours ramped with normalised LSA gain at 0.25 at all times + gain modulation LSA gain of 0.02 normally used in “prepare for ramp” corresponds to bunch 5 approx. bunch with zero gain clearly blows-up good BBQ signal thanks to low gain bunches (also higher intensity for bunch 1 as planned) emittance data to be analysed (large scatter observed) also recorded all bunches of HB1Q7 with new “continuous acquistion” in ADT batch-by-batch gain mod. is feasible for Physics fill to see which gain gives highest lumi 1 of 8 bunches no gain 8 bunches high gain 21.04.2012 LHC MD block 1 / ADT

Collimation at 4 TeV MD The first part of the MD involved performing an alignment of a horizontal IR3 The poor BLM signal quality for horizontal alignments observed for the March setups could be due to different parameters (e.g. octupole strength) rather than the momentum cut during the alignment. Test of new software, which uses the BPM-interpolated orbit at the collimators to move in the jaws from their initial positions to a safe margin in sigmas around the orbit The beam was dumped due to an error in the setting of the jaw position (settings sent in metres instead of mm) The bug was quickly fixed, and the functionality of the software was tested at 450 GeV. With the collimators all at 6 sigmas after the initialization from the BPM-interpolation, beam-based alignment of the collimators in parallel was performed (IR3 and IR7, 26 collimators) 22/04/2012 LHC 8:30 meeting

4 TeV Aperture MD For pilot intensities we started with the alignment of the TCTH collimators in IP1/5. However, the aperture scans gave puzzling results. Even if for both beams we measured more than 11 sigmas, we found different results than in the first measurements done during the initial commissioning period (B1-H bottleneck now found in IR1 sepration plane). Details will come after off line analysis. We noticed that the horizontal scans were affected by losses at the vertical collimators, which are not understood. We noticed also that the octupoles have an effect on the loss patterns during beam blow-up and on the estimated aperture values. Very preliminary on line analysis indicates about 1 sigma more if octupoles are at 50A instead than 450A. To be checked in detail. 22/04/2012 LHC 8:30 meeting

The Plan Fri Physics with 1380b Length scale calibration will be after the Technical Stop during intensity ramp up Sat 06:00 Start of LHC MD #1 (cut short by 1 day) Mon 06:00 Start of LHC technical stop (new software for orbit feedback) 20/04/2012 LHC 8:30 meeting

Updated of shortened MD Schedule Sat 06:00 – 07:00 end of fill study (tune scan, …) 09:00 – 13:00 450 GeV: Longitudinal impedance 13:00 – 17:00 450 GeV  4 TeV: ADT (no fast blow up) 19:00 – 00:00 450 GeV  4 TeV: Collimation Sun 02:00 – 07:00 450 GeV  4 TeV: Aperture 09:00 – 17:00 450 GeV: RF batch by batch blow-up 17:00 – 23:00 450 GeV  4 TeV: BI (emittance cross calibration with ADT blowup) 01:00 – 06:00 450 GeV  4 TeV: ADT (tune compatibility) 20/04/2012 LHC 8:30 meeting