What Should We Do?.

Slides:



Advertisements
Similar presentations
Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
Advertisements

Summary of the discussion for the commissioning session 2 nd ATF2 Project Meeting KEK, Tsukuba, Japan 6/ 1/ 2006 T.Okugi (KEK)
Nick Walker KEK-DESY meeting 7 th March 2005.
Workshop TS May 2008 GENERAL CLIC ALIGNMENT Progresses and strategy. Hélène MAINAUD DURAND, TS/SU/MTI.
Issues of stability and ground motion in ILC Andrei Seryi SLAC October 17, 2005 Selected pages from: Full talk at
European Design Study Towards a TeV Linear Collider WP 2 : Beam Delivery System Co-ordinator: Deepa Angal-Kalinin CCLRC, Daresbury Laboratory.
-brief report of October runs and some inputs for the Nov/Dec planning – Nobuhiro Terunuma, KEK, ATF ATF session on LCWS13, Tokyo Univ., Nov. 13, 2013.
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
1 Framework Programme 7 Guide for Applicants
Summary of AWG4: Beam Dynamics A. Latina (CERN), N. Solyak (FNAL) LCWS13 – Nov 11-15, 2013 – The University of Tokyo, Japan.
R&D proposals for EuCard 2 EuCard2, April 21Steffen Döbert, BE-RF  SRF basic research (W. Weingarten)  CTF3 and CTF3+, possible infra - structure for.
Gek 16/6/041 ITRP Comments on Question 19 GEK 9/06/04 19) For the X-band (warm) technology, detail the status of the tests of the full rf delivery system.
UK/EU Plans for ATF2 G.A. Blair ATF2-IN2P3-KEK kick-0ff meeting, Annecy, 8 th October 2006 Overview EUROTeV UK.
27/3/2009EuCARD NCLinac Kick-Off Meeting 1 Summary NCLinac Kick-Off CERN, 27-Mar-2009.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
D. Angal-KalininEUROTeV Annual Meeting, DESY WP2 : Beam Delivery System D. Angal-Kalinin ASTeC, STFC, Daresbury Laboratory 4 th EUROTeV Annual.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt CBM Collaboration meeting Status Interim MoU J. Eschke, GSI.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
1 Tunnel implementations (laser straight) Central Injector complex.
Luminosity expectations for the first years of CLIC operation CTC MJ.
BCD Status: Strengths and Weaknesses Tor Raubenheimer.
CLIC main activities and goals for 2018 Design and Implementation studies: CDR status: not optimized except at 3 TeV and not adjusted for Higgs discovery,
8 th Meeting of the ATF TB/SGC 11 June Hardware Status Fast Kicker – FID pulsers have had a reliability problem: this appears to have been solved.
BDS Andrei Seryi, Deepa Angal-Kalinin, Emmannual Tsesmelis, Rogelio Tomas, Andrea Latina, Daniel Schulte Detectors Civil engineering.
The stabilisation of the final focus (StaFF) system Sun 12 th March 2006 MDI – LCWS06 at I I Sc Bangalore David Urner, Paul Coe, Armin Reichold.
Multibunch beam stability in damping ring (Proposal of multibunch operation week in October) K. Kubo.
Global Design Effort Introduction and goals of the meeting Andrei Seryi, Toshiaki Tauchi Fifth ATF2 Project Meeting December 19-21, 2007.
Beam stability in damping ring - for stable extracted beam for ATF K. Kubo.
CLIC Machine-Detector Interface Working Group (MDI) Emmanuel Tsesmelis CERN TS/LEA CLIC-ACE of 3 September 2008.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
Introdcution to Workpackage/Activity Reflection D. Schulte.
Simulations - Beam dynamics in low emittance transport (LET: From the exit of Damping Ring) K. Kubo
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
Alignment system and impact on CLIC two-beam module design H. Mainaud-Durand, G. Riddone CTC meeting –
Main and Drive Beam Dynamics Working Group Caterina Biscari, Daniel Schulte Attending people ~ 20 ± 5 Presentations ~ 18 (7 from CERN) CL IC 07.
FP7: EuCARD after a year of preparation… A.Jeremie.
TBL experimental program Status and Results  Introduction  Status  Experimental program for 2010 and beyond  Outlook ACE, Steffen Döbert.
February 4, 2007 Global Design Effort 1. February 4, 07 Global Design Effort IR&MDI: 2 Tuesday’s discussion EDR organization Work Package distribution.
EuCARD NCLinac 9.3 Linac and FF Stabilisation A.Jeremie.
1 1 H. Hayano and ATF group ATF Status August/2004 H. Hayano and ATF group Multibunch emittance Instrumentation developments Plans for run Multibunch.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
Survey for SPL Dominique Missiaen BE-ABP/SU. Outline 12/11/2008 Dominique Missiaen BE-ABP-SU, Survey for SPL 2  Scope & Main Parameters  Technical Description.
ESGARD OMIA Sept EUROdrive and LED Motivation Work Packages Partners & resources.
CLIC Parameter Working Group Two Beam Module Design
Task 9.4 Beam Delivery System CERN, 27-Mar /3/2009
The Engineering Test Facility for nLC
LCC L. Evans, Santander, 2nd June 2016
CLIC module working group
In collaboration with P. N. Burrows, A. Latina and D. Schulte
For Discussion Possible Beam Dynamics Issues in ILC downstream of Damping Ring LCWS2015 K. Kubo.
Emittance Dilution and Preservation in the ILC RTML
Input to Strategy currently planned
Ddd 4-Slides Challenge Silvia Zorzetti.
M.Jonker CTC MPO-WG status
CLIC Study Aim Conceptual design report in 2010
WP10.3 LHC Crab Cavities Overview EUCARD SRF Annual Review
Background With new accelerators delivering beams always smaller and more energetic, requirements for very precise beam alignment become more and more.
CLIC-ILC BDS & MDI work.
A.Jeremie Some drawings from different CLIC’08 presentations
Accelerator Physics Technical System Group Review
ATF2 review R. Tomas ATF2 review web:
Andrei Seryi Materials for discussion TILC-08
Introduction / Comments on instrumentation issues
Advanced Research Electron Accelerator Laboratory
BDS EDR Discussion EDR Organisation? Discussion of WP distribution
Reliability, MPS, Operations and Tuning Work Packages
Presentation transcript:

What Should We Do?

Some Formal Points The duration of the project will be 4 years The request for EU funding needs to be reduced The number of JRAs needs to be reduced Suggested is to merge at least LED, EUROdrive and High Gradient Will give more flexibility in distribution of resources From ILC, a number of additional requests to extend the FP7 bids came in late Will be integrated where they fit But request already has been too large Firm commitments are to be made before end of September

EUROdrive Topics 1) Drive beam phase feedback system 2) Drive beam alignment and tuning procedures 3) Breakdown measurements in CTF3 High Gradient 4) CLIC machine protection system Also GADGET 5) Main beam simulation studies Very low level of resources 6) Longitudinal bunch profile measurements

LED Topics 1) Demonstrate main linac quadrupole stability 2) Explore sub nanometer stability for final doublet quadrupoles 3) Characterise the noise of different machine components in CTF3 add ATF2, but needs not be part of FP7 4) Develop ultra-fast transverse feedback system What needs to be done beyond FONT? 5) Main beam luminosity studies. Very small amount of resources

LED Topics II 6) Determination of requirements for IP instrumentation, stabilisation and feedback It is not clear how this can be tied to CTF3. Possible if small request of resources. 7) Test of girder and quadrupole alignment equipment with beam 8) Accelerating structure alignment on the girders and to the beam 9) Development of fast beamstrahlung and beam energy monitors that can resolve the beam pulse 10) Crab cavity development and tests in CTF3

LED Topics III 11) Laser wire 12) Design of alternative ILC interaction regions Could be integrated but hard to justify resource requests 13) Beam dumps Were not in the scope of the LED JRA, mainly looks like engineering

Combined Topic List 1) Drive beam phase feedback Mainly address the phase monitor 2) Longitudinal profile monitor to be coordinated with GADGET 3) Beam tuning studies mainly focus on the drive beam maybe can add a little for ATF2 Need to fit program development in 4) Machine protection mainly focus on loss monitors can integrate some simulations

Combined Topic List II 5) Demonstration of 1nm stability in main linac 6) Sub-nanometer stability for final doublet 7) Precision alignment equipment 8) Accelerating structure mechanical alignment 9) Crab cavities 10) Laser wire 11) Supporting simulation studies I consider this vital Can include design Will probably get limited funding

New Topic List III 11) Things from the seperate lists that are well enough supported Fast feedback Luminosity monitoring Beam dump 12) High gradient and precision topics

Next Steps Programme must be established before beginning of September Firm commitments need to be made before end of September Need more formal approach Everyone is to provide a description of their contribution Requested resources must be specified Matching funds must be specified (>2*request) Indication of level of certainty We will send out a template Will need to reduce requests soon Make sure that yours are registered in time

Other Points Organisation into JRAs and tasks will need to be done But should be relatively transparent for the work The formal contacts in your laboratory need to be prepared The reporting will later be based on a scientific and an administrative path We should meet in person Presentations at CARE meeting (September 10) Maybe use time of CLIC meeting (October 16-18) for technical preparation of the bids

Required Information Fill in the template as soon as possible If you have questions contact us First selection will be made on matching funds Make sure you can bring a firm commitment as soon as possible The programme needs to be well defined Objectives will be required Work description will also be required In activities involving several partners this may take a bit more time Still be quick with the commitment confirmation