Middle Fork Project Overview of 2008 Technical Study Plan Implementation April 21, 2008.

Slides:



Advertisements
Similar presentations
Action Effectiveness Monitoring in the Upper Columbia (Chapter 4) Karl M. Polivka, Pacific Northwest Research Station, USDA Forest Service.
Advertisements

Experimental Design 9th Grade EIC September 28, 2010.
LENTIC SYSTEMS ASSESSING FUNCTIONALITY LENTIC SYSTEMS.
1 Placer County Water Agency Middle Fork American River Project AQ 3 – Aquatic Mollusk Technical Study Report – 2008 March 3, 2009.
Middle Fork American River Project AQ 2 – Fish Population Technical Study Report Overview March 3, 2009.
Middle Fork Project AQ 6 – Fish Passage Technical Study February 3, 2009.
May Middle Fork Project Project Operations Overview May 2006 PCWA MAY 16, 2006 HANDOUT #4.
Hydroelectric Relicensing in Vermont Brian Fitzgerald Vermont Agency of Natural Resources.
Watershed System Physical Properties Stream flow (cfs) Stream Channel Pattern Substrate Chemical Properties pH Dissolved Oxygen Temperature Nutrients Turbidity.
Stanislaus River An overview…. History and Background One of largest tributaries to San Joaquin River Development of Basin began during the Gold Rush.
Middle Fork Project AQ 12 – Special-Status Amphibian and Aquatic Reptiles Technical Study Plan Report Overview March 10, 2008.
Placer County Water Agency Middle Fork American River Project (FERC No. 2079) Recreation Technical Working Group Meeting July 21, 2008.
Placer County Water Agency Middle Fork American River Project Placer County Water Agency Middle Fork American River Project Plenary Meeting January 6,
Hoover Dam – Colorado River. Reasons for Dams Flood Control 39,000 dams worldwide higher than 15 m (ICOLD, 1988)
Middle Fork Project AQ 12 – Special-Status Amphibian and Aquatic Reptiles Technical Study Plan Report Overview March 10, 2008.
Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research Program Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research.
Placer County Water Agency Middle Fork American River Project (FERC No. 2079) Recreation Technical Working Group Meeting March 6, 2008.
Biological Objectives Tied to Physical Processes Dr. William Trush Scott McBain Arcata, CA.
July Middle Fork Project Additional Information Potential Project Betterments to be evaluated during Relicensing July 2006.
Terrestrial Resources Working Group June 3, 2008.
Claytor Hydroelectric Project Water Quality Study Mark Hutchins, Project Manager January 25, 2007.
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
2012 Instream Flow Study Agency Meeting on 2012 Draft Study Descriptions January 24,
Middle Fork Project AQ 12 - Attachment A California Red-legged Frog Site Assessment March 10, 2008.
Suggested Guidelines for Geomorphic aspects of Anadromous Salmonid Habitat Restoration proposals G. Mathias Kondolf.
Middle Fork Project Flow and Temperature Modeling (Status Report) November 4, 2008.
Membership Need to clarify members and determine who has authority to vote on group decisions.
Icicle Creek Salmon Habitat Conditions* Land Development has affected stream channel movement, off channel habitat, and LWD recruitment. Barriers to migration.
Rehabilitation of Flat Creek, Teton County, Wyoming; Planning, design and implementation A cooperative effort between: Trout Unlimited, Jackson Hole Chapter.
Middle Fork Project Project Description April 25, 2006.
1 Placer County Water Agency Middle Fork American River Project (FERC No. 2079) Recreation Technical Working Group Meeting February 19, 2008.
1 Potential Project Betterments to be studied further during Relicensing June 20, 2006 Stakeholder Meeting Middle Fork American River Hydroelectric Project.
Claytor Lake Debris Study. Hydro Environmental Services of Kleinschmidt Associates  Shoreline Management Plans (SMP)  Aquatic & Terrestrial Habitat.
Placer County Water Agency Middle Fork American River Project (FERC No. 2079) Recreation Technical Working Group Meeting April 8, 2008.
Middle Fork Project Potential Project Betterments October 1, 2007.
National Aquatic Resource Surveys Wadeable Streams Assessment Overview November, 2007.
Fish Assemblages of the Wabash River Mark Pyron. Wabash River Fishes 1.Large river 2.High diversity 3.History of human impact 4.Fish assemblages respond.
Baird Claytor Hydroelectric Project Sedimentation Study.
Relationships between River Environment & Aquatic Life Don Sada Walker Basin Stakeholder Meeting December 12, 2007 Dr. Sudeep Chandra (UNR), Fish Dr. Christian.
HYDROELECTRIC POWER AND FERC. HYDRO 101A ”Water Runs Down Hill”
Placer County Water Agency Middle Fork American River Project Plenary Meeting June 1, 2009 Handout #2.
October 28, 2015 Yuba River Development Project Slide 1 Licensee Response to Relicensing Participant Tunnel Closure Proposal Yuba County Water Agency Yuba.
Placer County Water Agency Middle Fork American River Project Plenary Meeting January 4, 2010 Handout #3.
Habitat Mapping of High Level Indicators at Multiple Scales for Fish and Wildlife.
Hydropeaking and minimum flow : the French approach. P. Baran CIS ECOSTAT - HYDROMORPHOLGY WORKSHOP 12th and 13th June Brussels Pôle Ecohydraulique.
Middle Fork Project TERR 6 - Special-Status Bat Technical Study Plan Report Overview March 3, 2008.
Nehalem River Basin: Technical Assistance for Watershed Data Synthesis, Restoration, and Outreach Priorities 4/16/2008.
Agenda 9:00 AM - 12:00 PM 12:00 PM Introductions
PCWA Study Plan Physical Habitat Characterization Study Plan –Geomorphology Study Plan –Riparian Habitat Mapping Study Plan –Aquatic Habitat Characterization.
Iowa Rivers Information System Inventory, Modeling, and Evaluation of Basin, In-Stream Habitat, and Fishery Resource Relationships Kevin Kane, Iowa State.
Middle Fork Project AQ 3 – Macroinvertebrate and Aquatic Mollusk Technical Study Report Overview May 5, 2008.
Middle Fork Project AQ 11 – Water Quality Contingency Sampling Protocol (Contingency Study) September 8, 2008.
Chelan County Lead Entity Presentation SRFB 2005 Salmon Habitat Grant Cycle.
Environmental Flow Instream Flow “Environmental flow” is the term for the amount of water needed in a watercourse to maintain healthy, natural ecosystems.
1 Placer County Water Agency Middle Fork American River Project Terrestrial Working Group November 6, 2007 TERR 1: Vegetation Communities and Wildlife.
Middle Fork American River Project Recreation Resources Technical Working Group Meeting October 5, 2009.
Placer County Water Agency Middle Fork American River Project Plenary Meeting February 2, 2009 Handout #5.
Effects of Stream Restoration: A Comparative Study of Pine Run in Felton, Pennsylvania Luke Mummert, Department of Biological Sciences, York College of.
Source: Stream Corridor Restoration Manual WATERSHED MANAGEMENT.
FUNCTIONALITY of LENTIC SYSTEMS
An Overview of the Flathead Subbasin Planning Process
Middle Fork Project AQ 11 – Water Quality Technical Study Plan Report Overview March 10, 2008.
Middle Fork Project Entrainment Direct Sampling Approach (Contingency Study) September 8, 2008.
Middle Fork Project Project Description and Operations Maps
Water Testing Project for the North Fork River
Adelaide and Mount Lofty Ranges Aquatic Ecosystem and Biodiversity Report Card Assess and rate the ecological condition of creeks and rivers across Adelaide.
Milltown Phase II Draft Restoration Plan
What is a Shoreline Master Plan?
Middle Fork Project TERR 3 – Noxious Weed Technical Study Report Overview February 17, 2009.
Placer County Water Agency Middle Fork American River Project Plenary Meeting October 5, 2010.
Presentation transcript:

Middle Fork Project Overview of 2008 Technical Study Plan Implementation April 21, 2008

AQ 1 – Instream Flow 2008 Field Surveys Instream 12 Fish Study Sites (high, medium, and low flows) Rubicon River High Flow Issue 4 Sites with 2D for FYLF 5 Riparian Study Sites (high, medium, and low flows) 2 FYLF Stage Locations (NF near Shirttail, NFMF) 2D Model Validation FYLF Egg Masses and Tadpoles Coordinate with Geomorphology, Riparian, Amphibian and Aquatic Reptile, and Recreation TSPs Stranding Evaluation Snorkel 3 Large Pools/Write-up Peaking Reach Stage Monitoring Document Algae Abundance and Presence of Didymo Quantify Flow Level For Horseshoe Bar Channel

AQ 1 – Instream Flow (cont.) Habitat Modeling Develop HSC Coordinate with Riparian, Geomorphology, and Special-status Amphibian and Aquatic Reptile TSPs Document Results in 2009 Instream Flow TSR

AQ 2 – Fish Population Draft Report Comments Ralston Afterbay Sampling 2 Times (early summer and fall) Gillnets, Boat Electroshocking, Sonar, Water Temp Determine 2008 Sampling Sites with Aquatic TWG River Study Sites Qualitative Hardhead Distribution Identify Appropriate River Fish Standing Crop Comparison Data Sets Document 2008 Results in 2009 Fish Population TSR Misc. Duncan Diversion Pool Fish Scales (coordinate with fishermen?) Periodicity Chart

AQ 3 – Macroinvertebrate and Special-status Mollusks Draft Report (Coming Soon) Mollusk Field Study (20 sites) See map (4 sites with WPS mussels) Consult with TWG Regarding Water Quality Results & Potential BMI Sampling Document 2008 Mollusk Results in Macroinvertebrate and Special-status Mollusks TSR Present Drift Sampling Results in the 2009 Bioenergetics Study Report

AQ 4 – Water Temperature Modeling Water Temperature and MET Data Collection (2007-2008) Tunnel Sites Data Collection Temperature Refugia (Tributaries/Pools) Travel Times Develop Temperature Model Water Temperature Modeling Subgroup Select Models Develop and Calibrate Models Analyze Data and Develop Water Temperature Analysis Scenarios Betterments Global Warming Empirical Analysis of Small Streams Document Results in 2009 Water Temperature Modeling TSR

AQ 6 – Fish Passage Draft Report (Coming Soon) Consult with Aquatic TWG to: Determine if Hydrodynamic Modeling is Required at any Barriers Discuss Passage at Project Facilities Document 2008 Surveys in 2009 Fish Passage TSR

AQ 7 – Entrainment White Paper Analysis Report (Coming Soon) Consult with TWG to: Determine Entrainment Mitigation Determine Need for Entrainment Sampling If Necessary, Conduct 2008-2009 Entrainment Sampling Document sampling in 2010 Entrainment TSR

AQ 9 – Geomorphology Characterize Sediment Capture in Reservoirs Survey French Meadows and Hell Hole reservoirs, Ralston Afterbay, Duncan Diversion, and Middle Fork Interbay Betterment Shoreline Erosion with Hell Hole Storage Increase Hydrology Flood Frequency Analysis Sediment Transport Calculations High Flow Measurements if Possible Bankfull Identification Consult with Aquatic TWG on Need for Empirical Sediment Transport Data Collection Document 2007 and 2008 Results in 2009 Geomorphology TSR

AQ 10 – Riparian Resources Conduct 2008 Field Surveys Project Betterments Riparian Vegetation (Hell Hole Reservoir and Five Lakes Creek) Tree Cores from the Rubicon River Downstream from Hell Hole Dam (R25.7) Instream Flow Measurements (in Coordination with AQ 1) on Comparison Streams and Bypass Streams (if possible) Riparian Mapping at Peaking Reach 2D Modeling Sites Document 2007 Comparison Stream and 2008 Analysis Results in 2009 Riparian Resources TSR

AQ 11 – Water Quality Draft Report Comments Consult with TWG to Determine if: Results from the 2007 Water Quality Sampling Program Indicated Potentially Adverse Water Quality Conditions that Require Additional Sampling (Water Quality and/or BMI) Additional Fish Tissue Mercury Sampling is Necessary If Necessary, Complete 2008 Sampling Document 2008 Results in 2009 Water Quality TSR

AQ 12 – Special-status Amphibian and Aquatic Reptiles Draft Report Comments FYLF Stage Data at NF35.7 and NFMF1.6 (1-3 cross-sections) Collect Modeling Validation Data at 2D Sites Egg Masses/Tadpoles Breeding Timing (Initiation of Breeding) Additional Breeding Timing Data (Shirttail, Otter Creek) Consult with TWG to Identify any Data Gaps: Identify if Additional Limited-scope 2008 Surveys are Needed (e.g., breeding and timing, site revisits) CRLF Complete CRLF Surveys in 2009 (Horseshoe Bar & Ralston Ridge) Document 2008 Survey Results in 2009 Amphibian TSR