PROPOSALS FOR HIGH INTENSITY – HIGH ENERGY PROTON BEAMS

Slides:



Advertisements
Similar presentations
Summary of Projects Kai Hock. LHC Upgrade About the project LHC is a 27 km circular accelerator in CERN that produces 7 TeV protons. The project is to.
Advertisements

International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Preparation of FAIR EU FP7 preparatory phase proposals J. Eschke, FAIR.
CERN Robert Aymar – WelcomeCARE-HHH BEAM07, CERN, 1 October, 2007 CARE-HHH-APD event BEAM’07 "Finalizing the Roadmap for the Upgrade of the LHC and GSI.
D.S. proposal 18/12/2003 R. Garoby 1 PROTON DRIVER ACTIVITY Present work program: IPHI-SPL collaboration HIPPI Joint Research Activity [CARE] Proton driver.
September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   The proposal is under discussion: we welcome input from potential.
11 September 2007 FP7-IA HFM JRA proposal G. de Rijk (CERN)1 FP7-IA HFM JRA proposal   Outline Motivation General description Proposed Work Packages.
CERN F. Ruggiero & W. Scandale CARE Steering Committee, Paris, 11/04/2006 High Energy High Intensity Hadron Beams CARE-HHH Network: coordinators: F. Ruggiero.
H. Danared | Sw/Fr Coordination Committee | Page 1 Swedish/French Coordination Committee Håkan Danared Saclay, 13 January 2015.
Accelerator activities Brian Foster (Uni Hamburg/DESY) 1 B. Foster - Hamburg/DESY - Orsay 11/13.
Introduction to EC Framework Programme 7 Rob Edgecock CCLRC Rutherford Appleton Laboratory Introduction to Framework Programmes “ “ FP7 Neutrino LOI Mapping.
J.P.DelahayeE-GDE meeting 10/05/061 CERN non EU contribution to ILC J.P.Delahaye.
European design study on Neutrinofacilities - Euronu within FP7.
Name Event Date Name Event Date 1 CERN W. Scandale & F. Zimmermann HHH, CARE 08, CERN, High Energy High Intensity Hadron Beams
Networking Activity on Beams for European Neutrino Experiments BENE-Next ….. MEGLIO? Motivation Work Packages Partners & resources First ideas for the.
Peter Spiller, CBM collaboration meeting GSI-Darmstadt 11. February 2004 Status of the future accelerator project.
EuCARD Number of partners : 40 beneficiaries (12 countries) Total cost ~ 50 M€ (requested EC contribution: ~15 M€) Coordinator : J.-P. Koutchouk (CERN)
Maurizio Vretenar, CERN. Background 2  EuCARD (and CARE before it) had an enormous impact in structuring and promoting the European R&D on particle accelerators;
European Activities on ILC Machine Brian Foster (Uni Hamburg/DESY) 1 B. Foster - Hamburg/DESY - LCWS13.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Report from ESGARD EuCARD-2.
CARE Steering Committee and Dissemination Board R. Aleksan CARE Steering Committee CERN, September 13, 2006.
6-7 April 06 MAC Review Global Design Effort 1 European Regional Program Brian Foster GDE University of Oxford.
ESGARD – OMIA 10 & 11/09/2007 JRA on Collimators and Materials for High Power Accelerators Motivation Work Packages Partners & resources R. Assmann.
FP7 - IA EUROLUMI Network Walter Scandale, Frank Zimmermann ESGARD-OMIA meeting CERN,
CARE Steering Committee and Dissemination Board R. Aleksan CARE Steering Committee Paris, April 11, Introduction.
Les Les Robertson LCG Project Leader High Energy Physics using a worldwide computing grid Torino December 2005.
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU CNI contract Kick-off meeting, December 1-2,
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement An Introduction to EuCARD-2.
Status and Plans for EUROnu FP7 Design Study Status and Plans for EUROnu FP7 Design Study EUROnu = A High Intensity Neutrino Oscillation Facility in Europe.
JRA on Development of High Temperature SC Link Motivation Work Packages Partners & resources Amalia Ballarino Esgard open meeting CERN,
ECLOUD04, Panel Discussion, April 2004F. Zimmermann Panel Discussion future machines: higher intensity shorter bunch spacings and/or higher charge per.
NuFact06, 28 Aug 2006V. Palladino European Regional Outlook V. Palladino NuFact06 UC Irvine, Tue Aug 29, 2006 European Regional Outlook.
Preparation of FP7 Integration Activity Bid (2008) Superconducting RF Acceleration Systems Preparatory Group: Initial group : Dieter Proch (DESY), Terry.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2, ADS, linacs,
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
1 FCC News Frank Zimmermann LHeC-CG, 2 October 2015 FCC status F. Zimmermann on behalf of the FCC Collaboration LHeC Coordination Group 2 October 2015.
RF programme Review for the ESGARD Roadmap to EUCARD2 Peter McIntosh (STFC) Stephane Chel (CEA) Wolf-Dietrich Moeller (DESY)
CERN Report R-D Heuer ECFA, November Scientific Strategy Implementation of all four European Strategy high priority items Implementation of a diverse.
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe Introduction Aims Structure Tasks Link to other activities Future dates.
HFM coll. meeting, Febr , G. de Rijk, Summary of WP 1 Summary of the work-package. HFM: Superconducting High Field Magnets for higher luminosities.
ESGARD – OMIA 10 & 11/09/2007 JRA on Sc cavities and Cryomodule for a Pulsed proton Linac Motivation Work Packages Partners & resources R. Garoby for S.
R. Aleksan CARE06 meeting Frascati, November 16, 2006 CARE06 1.Preparing FP7 2.Conclusion.
XBEAM-XRING G. Franchetti 14/6/2013 G. Franchetti EuCARD-2 Kick-Off1.
ColMat Welcome and Task 1 Ralph W. Aβmann Kick off Meeting of EuCARD/ColMat CERN – June 17 th, Jun 09 1R. Assmann.
Discussions on preparations for future (joint) research projects
CLIC work program and milestones
Electronic Instrumentation
Neutrino Projects
Access to material testing facilities (WP10)
The R&D programme on High Field Magnets (HFM)
ICFA Report to C11 August 2016 to August 2017 J. Mnich (DESY)
Coordinated Accelerator R&D in Europe
Welcome to CERN Volker Mertens CERN Technology Department.
Accelerator Research and Innovation for European Science and Society
WP 4 CERN Nov 2, 2009.
CTF3 Collaboration Technical Meeting January 2008
EUDET Detector R&D towards the International Linear Collider
ARIES WP2 Task 2.3 Coordination, support and enhancement of training activities for accelerators in Europe Meeting:2 Rutambhara Yogi (ESS)
ARIES A new Integrating Activity for Particle Accelerators
European Integrating Activity in Hadron Physics
Steering Meeting of EuCARD
Steering Meeting of EuCARD
Report on EUCARD WP6: MICE Transnational Access (TA)
HEHIHB - WP1 Accelerator Magnet Technology
Design Study on High Luminosity Colliders EUROCRAB submitted to EU-FP7
Olivier Napoly, coordinator CEA/Irfu
Task 2.3 Particle simulations studies
High Energy High Intensity Hadron Beams
NuPECC Handbook 2004 – Status
A. Fabich EuCARD-2 annual meeting 2017, Glasgow
Presentation transcript:

PROPOSALS FOR HIGH INTENSITY – HIGH ENERGY PROTON BEAMS R. Garoby for R. W. Assmann, A. Ballarino, L. Bottura, G. De Rijk, M. Meddahi, V. Palladino, W. Scandale, L. Walckiers, F. Zimmermann OUTLINE PURPOSE & CONTEXT CONTENT PARTNERS RESOURCES & SUMMARY

Purpose & Context Purpose: Context: Not counting indirect costs… To foster joint European efforts in the preparation for the upgrade of major European accelerator facilities: CERN: LHC luminosity upgrades + upgrade of n facility GSI: FAIR project [ISIS (RAL) upgrades ? PSI upgrades ?] … and in the interest of future European projects (Future European n facility? EURISOL? ESS? …) Context: Based on the proposals submitted to ESGARD in 2006 and assembled in a 45 MEuros IA presented at CARE06 (Frascati – Nov. 2006) Taking into account: the approval by Brussels of the CNI for SLHC and of the DS for neutrinos, the progress in the definition of the most promising options for LHC, the instructions of the laboratory directors: Total budget for JRAs counting 70 kEuros/man.year: 14.5 MEuros 4 years duration Not counting indirect costs… Initial requests: 58.5 MEuros !

Content (1/3): Networks LHC luminosity upgrade GSI (FAIR) Name Type Description Cost (MEuros) EU funding (MEuros) EURO-LUMI ... Network LHC Luminosity upgrade 0.2 « MEGLIO » ... Towards a neutrino facility in Europe 0.3 Upgrade of CERN n facility Future European n facility

Content (2/3): Joint Research Activities LHC luminosity upgrade n facility 70 kEuros/man.year Application to accelerators (LHC upgrade…) Industrial Applications Name Type Description Cost (MEuros) EU funding (MEuros) HFM ... JRA High Field Magnets for LHC upgrades 6.2 1.86 HTS_SL ... HT superconducting link 0.8 0.24 ColMat ... Collimators and Materials for High Power Accelerators 6 1.8 SCPL ... Superconducting cavities and Cryomodule for a Pulsed proton Linac 1.5 0.45 LHC luminosity upgrade GSI (FAIR) High power accelerators (e.g. n facility) Industrial Applications LHC luminosity upgrade n facility EURISOL… ESS ?

Content (3/3): Transnational Access LHC luminosity upgrade GSI (FAIR) ITER Name Type Description Cost (MEuros) EU funding (MEuros) CryoMagNet ... TA Characterization of supraconductors and magnets 0.25 HiRadMat ... Test of materials under extreme beam induced shock LHC luminosity upgrade n facility

Austrian Research Center INFN (Genova, Milano etc.) Partners (20/33) Country EURO -Lumi n HFM ColMat SCPL HTS-L CryoMagNet HiRadMat Austrian Research Center Austria X Louvain la Neuve Belgium Uni. Sofia Bulgary CERN CH EPFL PSI ? Uni. Geneva etc. ITER EU CEA (Saclay) France IN2P3 (Orsay etc.) DESY Germany FZ Karlsruhe GSI KFZ Juelich MPI (Heidelberg) etc. TU Berlin TU Darmstadt INFN (Genova, Milano etc.) Italy Uni. Torino Uni. Milano

Partners (33/33) Country EURO -Lumi n HFM ColMat SCPL HTS-L CryoMagNet HiRadMat Uni. Bologna Italy X Uni. Sannio Benvento Uni. of Malta Malta X’ TEU (Twente) Netherland Uni. Cracow Poland ? WUT IFIC (Valencia) etc. Spain SISC CIEMAT Uni. Alicante Cockroft Institute UK John Adams Institute STFC (RAL, IC etc.) Uni. Southampton

Industrial Partners (6) Country EURO -Lumi n HFM ColMat SCPL HTS-L CryoMagNet HiRadMat EHTS Germany (industry) X Plansee ? Cesi Italy (industry) Columbus Edison Theva !

Partners outside Europe (8) Country EURO -Lumi n HFM ColMat SCPL HTS-L CryoMagNet HiRadMat BINP Novosibirsk Russia ? IHEP Protvino X JINR Dubna Kurchatov Research Centre BNL USA FNAL LBNL SLAC KEK Japan US-LARP Texas A&M

Budget distribution (JRAs only)