DS Quench TEST 2  MOTIVATION and METHOD: 1. Achieve 500kW on beam 1 – TCP7 collimators.(so far 500kW with beam 2 and 235kW over 1s with beam 1 were reached.
Advertisements

LHC Beam Operation CommitteeJune, 14 th UFOs in the LHC Tobias Baer LBOC June, 14 th 2011 Acknowledgements: N. Garrel, B. Goddard, E.B. Holzer, S.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
LHC 15 April :19: UFO event detected by on BLM 15.R8 and beam dump 8:46: P2 cold compressor trip and recovery during morning shift. Access given.
Lot’s of time lost due to cryo problem in IR8. Major impact, therefore review of MD program… Start discussion here, please let us know your input. Will.
LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
First measurements of longitudinal impedance and single-bunch effects in LHC E. Shaposhnikova for BE/RF Thanks: P. Baudrenghien, A. Butterworth, T. Bohl,
H. Bartosik, K. Cornelis, A. Guerrero, B. Mikulek, G. Rumolo, Y. Papaphilippou, B. Salvant, E. Shaposhnikova June 16 th, 2011.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
Beam-induced Quench Tests of LHC Magnets Beam-induced Quench Tests of LHC Magnets, B.Dehning 1 B. Auchmann, T. Baer, M. Bednarek, G. Bellodi, C. Bracco,
ION COMMISSIONING REVISITED 1 Thanks to: John Jowett, Walter Venturini. Matteo Solfaroli.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Mariusz Sapinski BI/BL Acknowledgements: 1 Planning of quench tests - LMC158 Draft planning of beam induced quench tests at the end of 2013 run LHC Machine.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
1 Experience at CERN with luminosity monitoring and calibration, ISR, SPS proton antiproton collider, LEP, and comments for LHC… Werner Herr and Rüdiger.
LHC Progress Thursday 29 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
AOB: Adjustments to BLM Thresholds in Light of Run-2 Experience with UFOs B. Auchmann, J. Ghini, L. Grob, A. Lechner, D. Wollmann. 118 th MPP,
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 Future Needs and Future Directions Maximizing the LHC Performances J.M. Jimenez …when Nature persists.
Shortened program (2 days), as decided in LMC. MD program worked very well  all MD’s on plan with ~foreseen beam time. LHC in very good shape with excellent.
Beam-Beam head-on Limit J. Barranco, X. Buffat, T. Pieloni, C. Tambasco, J. Qiang, K. Ohmi, M. Crouch for the Beam-Beam team BI BSRT Team George and Enrico.
1 Commissioning and Operation of the machine protection system L. Ponce Acknowledgements: M. Zerlauth, J. Wenninger, D. Wollmann, V. Chetvertkova, G. Valentino,
CONTENT: Beam characteristics and MP concerns BI configuration Operational settings Collimators Planning Shift breakdown Thanks to: P.Baudrenghien, G.Bellodi,
Parameter scan for the CLIC damping rings July 23rd, 2008 Y. Papaphilippou Thanks to H. Braun, M. Korostelev and D. Schulte.
Monday 19 th March 07:33 Lost (another) beam in the squeeze, beyond 2 m, B2 hits 1/3 resonance. 08:30 Start (another) ramp  Try to correct coupling and.
Use of a Diamond BLM System in the LHC Ring
Beam instrumentation MDs
Ion Commissioning: Thursday & Friday
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
BEAM LOSS MONITORING SYSTEM
Use of a Diamond BLM System in the LHC Ring
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Potential failure scenarios that can lead to very fast orbit changes and machine protection requirements for HL-LHC operation Daniel Wollmann with input.
Saturday 24 March 2012.
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Beam-beam Effects in Hadron Colliders
MD2490 Measurement of the TMCI threshold at flat-top
Fast losses at collimators during 16L2 dumps
MD2490: Measurement of the TMCI Threshold at Flat-Top
LHC Status Wed Morning 13-April R. Assmann, B. Holzer et al
BEAM LOSS MONITORING SYSTEM
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
LHC Morning Meeting - G. Arduini
Week 35 – Technical Stop and Restart
Friday 14th December - morning
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Wire almost entirely through beam before BLM triggers dump
Friday 16/3 08:30 – 10:15 Access for QPS and EPC (BI in point 4)
Why do BLMs need to know the Quench Levels?
Saturday 7th May Sat – Sun night
Summary Thursday h21: Stable beams fill #1303.
Aims for the week Recover from technical stop and precycle at 10A/s
Thursday Fill 1364 (24 bunch) dumped at 07h
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
90m "proper" VdM scans in the 90m/10m optics
Scrubbing progress - 08/12/2012
MD Planning Fri – Sat (1. – 2.7.)
Summary for LPC (March 7th, Ralph Assmann)
LHC Morning Meeting - G. Arduini
Fri :52 Stable beams fill #2536
Thursday 30th September De-bunching test
Wednesday h18: 228b fill lost just before start of ramp.
Friday 15th February - morning
Another Immortal Fill….
Saturday 15th May One bunch 1 e11 per beam 09:57: start ramp
31/3/2010 Difficult day… but at the end stable beams.
15/12/2009 Vacuum interlock in sector 78 understood  out-gassing of a Penning gauge ignited as a result of ionization or dust arcing In conclusion: NO.
Monday 152 bunch operation summary
Presentation transcript:

MD2036: UFO dynamics studies and UFO fast detection A. Apollonio, P. Belanger, L. Grob, L. Ponce, R. Schmidt, M. Valette, D. Valuch andrea.apollonio@cern.ch v1

Reminder UFOs remain one of biggest unknowns related to LHC operation UFOs can severely affect LHC availability by Triggering premature dumps due to beam losses Causing beam-induced quenches It is fundamental to achieve a better understanding of UFO dynamics and improve their detection methods in view of operation with higher beam intensities and energy

UFO-induced Dumps & Quenches in 2015/16 A. Lechner Number of dumps & quenches depends on: BLM threshold settings UFO rates -> strong conditioning observed since Oct 2015, rates much lower in 2016 than in 2015

BLM threshold strategy for UFOs A. Lechner Arcs and dispersion suppressors: If we try to prevent quenches, unnecessary dumps are unavoidable For availability it is better to avoid unnecessary dumps, tolerate some quenches, as confirmed by 2016 experience: Would adopt same strategy at 7 TeV -> “only” consequence is increased risk of quenches Long straight sections: Expect that local UFO hot spots can be mitigated with threshold increase (as done in 2015 and 2016) *3 out of 4 dumps were in S12 (temporary reduction of thresholds due to suspected inter-turn short) ** Simple count of 2016 fills which would have been prematurely dumped if tenfold lower thresholds would have been applied in all sectors throughout the whole year. Multiple occurrences per fill are only counted once.

6.5 vs 7 TeV: Increased Risk of UFO Quenches A. Lechner Quench levels: 20-30% decrease Energy density in coils per proton lost: ~12% increase For a given UFO rate, # of UFOs which have potential to induce a quench increases by a factor of 2-4 The strong dependence of the UFO rate on the machine conditioning status implies that the impact of UFOs on operation at 7 TeV will be critical in the first year following a long shutdown

Goal of the MD Validate modelling and simulation of UFO events Produce UFO-like losses UFO by flying wire scanners Monitor losses produced by elastically scattered particles at the TCP with diamond BLMs in IP7 Change bunch parameters (emittance, orbit) and see effect on loss pattern (injection and flat-top) Validate diamond BLM setup for UFO recording Verify triggering and acquisition system Set thresholds for injection and flat-top events Evaluate possibility to include dBLM data in the UFO buster

Readiness of the MD Setup and triggering of dBLMs validated with: Emittance calibration fill (flat-top) ADT settings (preparation required with D. Valuch): Option 1: AC dipole mode at equilibrium between excitation and damping Pros: known settings (21/5/2017) Cons: not constant displacement at the TCP Option 2: AC dipole mode with low excitation frequency (<10 Hz) Pros: quasi-constant displacement at the TCP Cons: a bit more complicated to prepare (requires synch with wire scanner timing event) 450 GeV 6.5 TeV

MD Preparation Unlink B1 and B2 in the BIS (no other interlock modification required). Prepare the filling scheme “Single_10b_9_2_2_BSRT_Calib_RampUp” Verify diamond triggering and acquisition at injection. Verify that the selected ADT mode is working as expected at injection.

MD Steps (450 GeV) Inject 10 nominal bunches (B1 and B2) Perform a vertical and a horizontal wire scan and verify correct triggering and acquisition of the diamond detector Perform a vertical and a horizontal wire scan following each of the following manipulations (done independently and subsequently) Repeat for the second beam Dump

MD Steps (6.5 TeV) Inject 10 nominal bunches (B1 and B2) and ramp to 6.5 TeV Correct orbit, then swtich-off orbit feedback and tune feedback Perform a vertical and a horizontal wire scan following each of the following manipulations (done independently and subsequently) Repeat for the second beam Dump

Recovery Ramp-down Restore ADT settings Set dBLMs to default settings Total time 4 h + 2 h

Conclusions UFOs  Very interesting topic and MD programme Scope is two-fold Investigate UFO dynamics Validate dBLMs for monitoring UFO-induced losses Added value: more experience with ADT advanced settings

2012 – Availability Working Group Established Thank you! Questions?