Brownsville Overview Management Presentation December 2000

Slides:



Advertisements
Similar presentations
The three most important considerations for development of wind farms are: LAND with good to excellent wind resource CONTRACT to sell electricity produced.
Advertisements

NARUC 2015 Winter Meeting February 16, 2015 Combined Heat and Power and the Clean Power Plan Bruce Hedman Institute for Industrial Productivity.
COMBINED HEAT & POWER J.R. Simplot Mountain Home, Idaho.
Community Energy Opportunities Jon Bell Business Development Manager Mosscliff Environmental Ltd.
FIFTH ANNUAL FEDERAL ENERGY WORKSHOP & DEFENSE ENERGY PARTNERSHIP FORUM | PAGE 2 Bruce Hedman, Institute for Industrial Productivity September 16, 2014.
2001 & 2002 Energy Preparedness Tucson Electric Power February 16, 2001 Michael Flores, Manager Control Area Operations David Hutchens, Manager Wholesale.
Engineering Technology Division
A Bowman Microturbine at the Holiday Inn January 20, 2004 Brian Inglett Presents SIMMAX ENERGY.
Alternativenergy Flat Ridge Wind Facility Ted Hofbauer – Asset Manager.
Turkish Power System Overview March 2012
NASHVILLE ELECTRIC SERVICE | Association for Financial Professionals March 2012.
Freeport Generating Project Project Description Modernization projects at Power Plant #2 Developers – Freeport Electric and Selected Development Company.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
Lisa Linowes 2010 Mid-America Regulatory Conference Consumer Forum June 6 - 9, 2010 Kansas City, Missouri Wind Energy: An Assessment.
OFFSHORE WIND CONNECTION & COSTS Mary Doswell Alternative Energy Solutions December 7 th, 2010.
How the Transmission System Works Really William F. Reinke.
Southern California Edison The San Onofre Nuclear Generating Station April 14, 2011.
0 Greg Wagoner Manager, Power Supply Wabash Valley Power Association June 6, 2006 Methane Recovery Workshop.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
Enron North America. AC_01_ENA-1 Market-Making + Technology + Scale + Select Assets = Sustainable Competitive Advantage Enron North America North America.
Introduction And Thermal Power Plant
Briefing Note Enron Canada Corp. March 22, 2001 Ontario Business & Market Overview.
Fountain Valley Power 225 MW Peaking Station for Public Service of Colorado.
Aligning the Gas and Electric Markets: EDF Solutions
Pan-Canadian Wind Integration Study (PCWIS) Prepared by: GE Energy Consulting, Vaisala , EnerNex, Electranix, Knight Piésold Olga Kucherenko.
Brownsville Overview Management Presentation November 2000
Progress Briefing - Energy Initiative
Lincoln Energy Center Overview
Enron Generation Overview - Pastoria
Enron Generation Overview - Pastoria
Enron Generation Overview
DRAFT- April 3, 2001 Restructuring Proposal to Brazos Electric Power Cooperative, Inc. April 6, 2001 This Information is CONFIDENTIAL Per Section 5 of.
Wheatland Overview Management Presentation October 2000
Enron Generation Overview
Enron Generation Overview
Privileged and Confidential
FUEL CELLS.
Enron Generation Overview
Enron Corp. Board of Directors Presentation
Overhaul of Combustion Turbines Under NSR Regulations
Gleason Overview Management Presentation October 2000
Enron Generation Overview - Pastoria
Enron Generation Overview
EE6501 POWER SYSTEM ANALYSIS
Presentation to the Enron Corp. Finance Committee
October 2000 Confidential & Proprietary Sales Points Gleason Overview.
Transwestern Station 1 Heat Recovery Project
Gleason Overview Management Presentation October 2000
MRES Resource Operations in SPP
Methane Capture and Use: Current Practices vs. Future Possibilities
Nuclear Power Update for The Society of American Military Engineers
Wind Industry Market and Policy Overview
Michael I. Henderson ISO New England Inc.
The Joint Accounting Conference 2018
SunZia Project Description
Presentation on Cogeneration and District Cooling Plant
Distributed Energy Resources (DER) Experiences at CenterPoint Energy
New England Gas Overview
City Council April 30, 2018 Item 13
About Dominion: One of America’s Leading Energy Companies
Plug & Play CHP? Is Your Pocket About to be Picked?
New England Economic Partnership James Daly Vice President Energy Supply Energy Market Perspectives Reliable Energy, Competitive Prices and.
Panel Session: Next Generation of Market Machines
Wind Development & Policy Options
Power Generation: Natural Gas Role
Solar Energy Commercialization
Electrical Energy Supply System
Puerto Rico Electric System Challenges Ahead
Making Green Tariffs Work for Your Customers
Manager, Supply Resource Planning
Presentation transcript:

Brownsville Overview Management Presentation December 2000 Confidential & Proprietary Management Presentation Brownsville Overview

Brownsville Overview Overview Plant Description: 494 MW (nominal) natural gas-fired, simple-cycle facility Location: 134-acre tract in Haywood County, Tennessee, in the TVA subregion of SERC Power Interconnect: TVA 500 kV line Gas Interconnect: ANR Pipeline Company Start of Construction: October 1998 Commercial Operation Date: June 1999 Approx. Max. Annual MWh: 674,000 (nominal) Approx. Run Hours: 1,365 NOx (per unit): <15 ppm (501 D5) and <25 ppm (501 D5A) CO (per unit): <25 ppm

Facility Strengths “First-mover advantage” inside TVA Brownsville Overview Facility Strengths “First-mover advantage” inside TVA TVA and surrounding areas have historically experienced extreme power price volatility Ideally suited to capitalize on gas/power arbitrage opportunities Expansion/conversion potential at existing site Site has room for additional gas turbines Technology and layout of turbines allow for conversion to combined cycle 30-minute normal unit ramp up from cold to full load

Brownsville Overview Plant Picture

Brownsville Overview Regional Overview

Power Market Opportunities Brownsville Overview Power Market Opportunities Brownsville Power I, L.L.C. is qualified as an Exempt Wholesale Generator and has authority to sell energy and capacity at market-based rates TVA’s extensive 500 kV system provides system users excellent transmission reliability and reach Brownsville’s location in TVA and access to eastern U.S. electricity market provide sales opportunities into the wholesale power markets Brownsville provides access to TVA system with direct connections to 12 surrounding control area markets Brownsville is within two utility wheels away from over 70 control area markets

Equipment Overview Brownsville Overview Turbines: 2 Westinghouse Model 501 D5 and 2 Westinghouse Model 501 D5A, with evaporative cooling Switchyard Equipment: ABB, 500 kV interconnect breakers Switchyard Configuration: single ring bus Transformers: (2) ABB 332 MVA, 3 winding, three-phase, 13.8 kV/500 kV Control System: WDPF Generator Circuit Breakers: (4) ABB (11,500 A) Generator Voltages: 13.8 kV Plant Distribution Voltages: 4160 V and 480 V BROWNSVILLE ENSE 500 kV B G1 B B GSU T1 B G2 Cordova Substation Bus 1 (500 kV) Bus 2 (500 kV) B G3 B B GSU T2 B G4 Jackson Substation Summer Nominal Winter Unit MW Rating: 115 119 124 (D5) 125 128 133 (D5A) B = Breaker GSU = Generator Step-up Unit

Brownsville Overview Plant Layout

Performance Results Brownsville Overview Performance Data Unit Type D5 Life-to-Date Run Hours 1,105 922 819 937 Life-to-Date Starts 178 151 174 166 Performance Test Data Output (MW) Corrected to 90 F 112 112 119 118 Heat Rate (LHV) Corrected to 90 F 9,790 9,917 10,451 10,555 Heat Rate (HHV) Corrected to 90 F 10,867 11,009 11,601 11,716 NOx Emissions (ppm) Corrected to 15% O2 11.9 12.6 24.1 24.7

Power Interconnection Brownsville Overview Power Interconnection Interconnected via a single ring bus switchyard to TVA’s Cordova-Jackson 500 kV transmission line There is one line connected to TVA’s Cordova switchyard and the other line is connected to TVA’s Jackson switchyard

Gas Transportation Brownsville Overview Pipeline: ANR Pipeline Company Delivery Point: ANR ML-2 (Plant Gate) Base Contract: Service: IT/IPLS Term: 10 years (May - Sept), beginning April 1, 1999 Volume: 83,253 Dth/day Rate: $0.09 plus fuel and ACA Fuel: 0.0% on backhaul from Chicago; 2.91% on forward haul Receipt Points: SE Area LA and Joliet, IL. Balancing: $0.015 per Dth/day for out of balance volumes Backup Contract: ENA has a one time right to convert to firm transport at any time during the first 5 years of the agreement. Rate is $0.13 plus ACA and fuel. Balancing: IPLS at plant gate (limited to 84,000 Dth). IPLS service subject to economic dispatching and pipeline operational conditions. Balancing in-kind. Allows for uneven hourly flow at plant delivery point with even 24 hour supply flow

Brownsville Overview Plant Location

Brownsville Overview Control Area Status Brownsville control area, ENSE, has been designated a control area in accordance with NERC policy Control area designation is valuable for point to point power sales and scheduling of power Following the sale, control area options for purchaser include: control area services could be provided by TVA purchaser could re-establish a control area in accordance with NERC procedures an Enron affiliate could provide control area and scheduling services, under separate contract

Expansion/Conversion Opportunity Brownsville Overview Expansion/Conversion Opportunity Brownsville has been designed to facilitate a future plant expansion and/or conversion to combined cycle Net heat rate could go from approximately 11,300 Btu/kWh plant average (HHV) to approximately 7,900 Btu/kWh (HHV), depending on equipment Net output could go from approximately 494 MW (nominal) currently to approximately 700 MW (nominal), depending on equipment Conversion of Brownsville should take approximately 18 to 24 months Installation of an SCR should facilitate getting a PSD permit for combined cycle operation

Environmental Issues Discharge Permit: Not Required Brownsville Overview Environmental Issues Discharge Permit: Not Required Air Permit: Non-PSD NOx Control Method: 2 x Water injection (D5A) 2 x Steam injection (D5) Compliance Method: CEMS Limits: 249 T NOx per year 225 T CO per year Actual Commission NOx: <15 ppm (D5) and < 25 ppm (D5A) Estimated Run Hours: 1,365

Estimated Operating Costs Brownsville Overview Estimated Operating Costs

Brownsville Overview Organizational Chart Brownsville is currently operated by Operational Energy Corp (“OEC”), an Enron Corp. subsidiary It is anticipated that at closing, O&M contract with OEC will be terminated Brownsville personnel are currently employees of OEC

Brownsville Overview Legal Structure Brownsville Power I L.L.C. (“Brownsville Power”) leases the facility (including real property) from the Industrial Development Board of Haywood County for a term of 15 years beginning on the date of commercial operations (approximately June 1999) Brownsville Power has the right to buy the facility at any time during the term of the lease or within 90 days after the expiration thereof for $500.00 Brownsville Power is a single member Delaware limited liability company and is 100% owned by Enron North America Corp. Purchaser will acquire 100% of the member interests in Brownsville Power