Energy Storage Settlements Consistent with PUCT Project & NPRR461

Slides:



Advertisements
Similar presentations
Distributed Generation (DG)
Advertisements

Amendment 3/5 Workshop.
Unresolved Issues in NPRR 555 Texas Steel Companies July 9, 2013.
1 Regulatory Developments and Impacts Involving Electricity Storage in Texas Elizabeth Drews 31 st USAEE/IAEE North American Conference Austin TX, November.
Market Operations Presentation Board of Director’s Meeting November 18, 2003.
Energy Storage Definitions/Definitions ETWG 18 Feb 2013.
Raine Cotton  Registered DG settlement is in accordance with Protocol Section as Real-Time Energy Imbalance at a Load.
Loads in SCED v2 Subgroup The LMP-G Journey 1. TAC Endorsement of LMP-G TAC voted to endorse “LMP-G” rather than “Full LMP” as the mechanism to enable.
GENFLEX TARIFF AND INCOPORATION OF THE MEC INTO THE NMD RULES
Retail Market Update June 5, New meter is requested for a specific customer’s location. 2.Application is filed by customer and/or the customer’s.
Welcome New York Independent System Operator. (Pre-NYISO) Regulated Market Physical contracts Regulated industry Cost Based System Two Party Deals Bundled.
1 Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
7/15/2013 CSWG CSWG – ERCOT Update ERCOT Matthew Tozer.
ERCOT ENERGY STORAGE MARKETS & POLICY: PAST, PRESENT & FUTURE Emerging Technology Working Group, September 17 th, 2015 Cyrus Reed, Lone Star Chapter, Sierra.
Current DG Framework for Competitive Areas of ERCOT DREAM TF September 28, 2015.
Distributed Energy Resources Concept Document Discussion ERCOT Staff DREAM Task Force Aug. 25,
ERCOT MARKET EDUCATION
ERCOT MARKET EDUCATION Retail 101. Introductions, Roles and Responsibilities.
0 The Basics –There are 4 POLR customer classes: Residential, Small Non-Res. (
Distributed Generation Task Force November 29, 2007 TAC Report.
Grabbing Balancing Up Load (BUL) by the Horns December 2006.
Southern California Edison SM Southern California Edison Company Proposed AB920 Net Surplus Compensation Rate [NSCR] July 9, 2010.
GENERATION PROTOCOL AND SETTLEMENT TODAY COMET WG / RMS Workshop Electric Reliability Council of Texas May 2, 2007.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations May 8, 2012 – COPS Meeting May 9, 2012 – WMS.
ERCOT UFE Analysis UFE Task Force February 21, 2005.
SPP Presentation Stakeholder Meeting April 16, 2008 Austin, Texas UPDATE: Retail Open Access for ETI within SPP.
01/17/ CP Discussion October 16,2002 Retail Market Subcommittee Austin, Texas.
Advanced Metering Rule Christine Wright Public Utility Commission of Texas June 6, 2007 Retail Market Workshop COMET WG Meeting.
ERS Update – DSWG Presentation September 21, 2012.
1 Presentation MIT November 14, 2011 Metering Issues Taskforce (MIT) Elimination of Time Error Correction Potential Impact on Wholesale Settlements.
Distributed Generation Registration June 30, 2008.
ERCOT MARKET EDUCATION Retail 101. Introductions, Roles and Responsibilities.
“Managing the Integration of Energy Storage Technologies” Kenneth Ragsdale ERCOT.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
ERCOT MARKET EDUCATION Retail 101. Market Rules Overview Topics in this lesson...  Introduction to Market Rules Public Utility Regulatory Act PUCT Substantive.
Profiling Working Group 1 PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair Ed Echols Of Oncor ERCOT PWG Vice Chair for COPS Meeting.
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
March 22, 2011 ERCOT Board of Directors Commercial Market Operations Version 2 - Updated on March 18, 2011 Betty Day.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations June 27, 2012 – ETWG Meeting.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations November 2, 2012 – RCWG Meeting.
Retail Metering Working Group Progress Report 08/15/07.
Joint Energy Auction Implementation Proposal of PG&E, SCE and SDG&E California Public Utilities Commission Workshop – November 1, 2006.
1 RMS Update to RMWG June 6, Market Process for Solar & Wind Devices Retail customers are purchasing and installing wind and solar equipment on.
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
Commercial Operations Subcommittee (COPS) Update to TAC 4/28/2016
Smart Grid Tariff Changes
Interpreting HB 3693 Interstate Renewable Energy Council
ERCOT MARKET EDUCATION
LPGRR060, Load Profiling Guide Clean Up Related to LPGRR057
Principal Load Profiling and Modeling
Fuel Cost Components in the Fuel Adder
2017 Seasonal Adjustment Factors
Distributed Generation Task Force
Fuel Cost Components in the Fuel Adder
TAC Report to the ERCOT Board
Nodal COMS Additional Items Update
Hurricane Rita.
NPRRs 815NPRR Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service.  This Nodal Protocol Revision Request (NPRR) revises.
John Dumas Director, Wholesale Market Operations
Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
Fuel Cost Components in the Fuel Adder
Ancillary Service Trades and Ancillary Service Settlement
Alternative Approach for Loads in SCED v.2
Reflecting Losses in DR within ERCOT August 22, 2012
NPRR829 Incorporate Real-Time Telemetered Net Generation for Non-Modeled Generation into the Real-Time Liability Estimate ERCOT PRS Meeting May 11, 2017.
The New Texas Wholesale/Retail Market
31st USAEE/IAEE North American Conference
Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
Calculation of BGS-CIEP Hourly Energy Price Component Using PJM Hourly Data for the PSE&G Transmission Zone.
Presentation transcript:

Energy Storage Settlements Consistent with PUCT Project 39917 & NPRR461 ERCOT Commercial Market Operations June 27, 2012 – ETWG Meeting

Implementation Concepts Metering Configurations Data Aggregation Agenda Guiding Principles References to the preamble for Project 39917 References to the rule language Commission Staff Direction on the rule intent for self serving loads Implementation Concepts Metering Configurations Data Aggregation Settlements Spreadsheet Examples Separate file attached to meeting materials Operational Concepts – “Under Construction” Concepts are not addressed by the rule language or the NPRR

Excerpt from Commission Response to question 1 in the preamble Guiding Principle 1 An energy storage resource has the option of receiving wholesale storage load treatment. Excerpt from Commission Response to question 1 in the preamble “…. the storage facility could choose not to separately meter the storage facility and treat all energy purchased from the ERCOT system as retail sales.”

Guiding Principle 2 ESR Storage load must be separately metered to be considered wholesale storage load Excerpt from §25.501 (m) (2) “Wholesale storage occurs when electricity is used to charge a storage facility; the storage facility is separately metered from all other facilities including auxiliary facilities; and energy from the electricity is stored in the storage facility and subsequently re-generated and sold at wholesale as energy or ancillary services.”

Non storage generation may serve wholesale storage load Guiding Principle 3 Non storage generation may serve wholesale storage load Excerpt from Commission Response to question 1 in the preamble “PURA §35.152 provides that a storage facility is entitled to be treated like other generation facilities in the sale of energy and ancillary services at wholesale. A key issue for the commission to resolve is how to treat a storage facility when it is acquiring energy. As explained below, the commission determines that the electricity withdrawn to charge a storage facility is a wholesale transaction. There are a number of possible scenarios where this issue arises, including the following: (1) only a storage facility and its auxiliary facilities (station power); (2) a storage facility, auxiliary facilities, and other consuming facilities, all under common ownership; (3) a storage facility, auxiliary facilities, other consuming facilities, and a non-storage generation facility, all under common ownership; and (4) a storage facility, auxiliary facilities, other consuming facilities, and a non-storage generation facility, with different ownership.” … … “In the third scenario, where there is a storage facility, auxiliary facilities, other consuming facilities, and a non-storage generation facility, all under common ownership, the energy produced by the non-storage generation facility to charge the storage facility is self-use energy and should therefore not be treated as a retail sale, like energy generated by a non-storage generation facility and used for its auxiliary facilities.”

Commission staff direction on the intent of the rule Guiding Principle 4 ESR Generation can be netted with generation site auxiliary loads and associated loads. Commission staff direction on the intent of the rule reference provided was an excerpt from the Commission Response to question 1 in the preamble “PURA §35.152 provides that a storage facility is entitled to be treated like other generation facilities in the sale of energy and ancillary services at wholesale.”

Guiding Principle 5 Wholesale storage load is exempt from charges and credits based on Load Ratio Share or per MWH basis Excerpt from §25.501 (m) (2) “… Wholesale storage is not subject to retail tariffs, rates, and charges or fees assessed in conjunction with the retail purchase of electricity. Wholesale storage shall not be subject to ERCOT charges and credits associated with ancillary service obligations, or other load ratio share or per megawatt-hour based charges and allocations. ...”

Excerpt from §25.192,Transmission Service Rates (b) (1) Guiding Principle 6 Wholesale storage load will not be included in the ERCOT 4CP calculations. Excerpt from §25.192,Transmission Service Rates (b) (1) “… A TSP’s transmission rate shall be calculated as its commission-approved transmission cost of service divided by the average of ERCOT coincident peak demand for the months of June, July, August and September (4CP), excluding the portion of coincident peak demand attributable to wholesale storage load….”

Guiding Principle 7 Settlement for a storage facility that has more than one delivery point shall be based on the net impact of those delivery points on ERCOT system. Excerpt from §25.501 (m) (1) “For a storage facility that has more than one delivery point, ERCOT shall net the impact of those delivery points on the ERCOT system for settlement purposes”

Guiding Principle 8 Wholesale storage load pricing shall be based on the LMP at the electrical bus Excerpt from §25.501 (m) (2) “… Wholesale storage is wholesale load and ERCOT shall settle it accordingly, except that ERCOT shall settle wholesale storage using the nodal energy price at the electrical bus that connects the storage facility to the transmission system, or if the storage facility is connected at distribution voltage, the nodal price of the nearest electrical bus that connects to the transmission system. …”

Implementation Concepts Metering configurations Will require the ESR Charging Load that is requesting treatment as Wholesale Storage Load to be metered separately from all other site loads be based on ERCOT system design and capabilities for accounting for the wholesale storage load and ESR generation be discussed with the Settlement Metering Working Group Will NOT be allowed if they do not conform to a design that allows ERCOT to settle the site based on current system design As rules are finalized Market Participants should work with ERCOT early during the design phase of their facility

Implementation Concepts Data Aggregation processes wholesale storage load will be included to determine total UFE will NOT be assigned Unaccounted for Energy (UFE) be included in Adjusted Metered Load (AML) be included in ERCOT 4CP calculations be included in TRE fee calculations have transmission and/or distribution losses added

Implementation Concepts Settlement processes   Site is net generation Same settlements logic for all generation sites Summation of POI metering point dollars EPS metered energy * price at EPS meter Generation POI’s Settled using base point weighted price at the generation EPS meter(s) Load POI’s, including ESR Charging Load POI’s Settled using a time-weighted price at the Load EPS meter(s)

Implementation Concepts Settlement processes   Site is net load Conditional calculation to determine WSL & Retail Load based on: site net load value metered value(s) of ESR charging load Wholesale Storage Load Settled using an energy-weighted price at the ESR Load EPS meter(s) ESR load is LMP weighted average by telemeter ESR load Retail Load Assigned to an ESI ID

Implementation Concepts Wholesale storage load treatment Wholesale storage load will be settled by QSE and Settlement Point be settled through Real-Time Energy Imbalance at a Resource Node Wholesale storage load will NOT be included in any Load-shared charges and credits be settled using a Load Zone Settlement Point Price

Questions and Discussion