Update on Plan for KISTI-GSDC

Slides:



Advertisements
Similar presentations
Update on Status of Tier-1 GSDC, KISTI Sang-Un Ahn, for the GSDC Tier-1 Team
Advertisements

Status GridKa & ALICE T2 in Germany Kilian Schwarz GSI Darmstadt.
T1 at LBL/NERSC/OAK RIDGE General principles. RAW data flow T0 disk buffer DAQ & HLT CERN Tape AliEn FC Raw data Condition & Calibration & data DB disk.
Southgrid Status Pete Gronbech: 27th June 2006 GridPP 16 QMUL.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
Status Report on Tier-1 in Korea Gungwon Kang, Sang-Un Ahn and Hangjin Jang (KISTI GSDC) April 28, 2014 at 15th CERN-Korea Committee, Geneva Korea Institute.
Global Science experiment Data hub Center Oct. 13, 2014 Seo-Young Noh Status Report on Tier 1 in Korea.
Preparation of KIPT (Kharkov) computing facilities for CMS data analysis L. Levchuk Kharkov Institute of Physics and Technology (KIPT), Kharkov, Ukraine.
11 ALICE Computing Activities in Korea Beob Kyun Kim e-Science Division, KISTI
LCG Introduction John Gordon, SFTC GDB December 2 nd 2009.
November 16, 2012 Seo-Young Noh Haengjin Jang {rsyoung, Status Updates on STAR Computing at KISTI.
LCG Service Challenge Phase 4: Piano di attività e impatto sulla infrastruttura di rete 1 Service Challenge Phase 4: Piano di attività e impatto sulla.
LCG-2 Plan in Taiwan Simon C. Lin and Eric Yen Academia Sinica Taipei, Taiwan 13 January 2004.
1 1APCTP LHC Konkuk University. Introduction to GSDC Project Activities in 2009 Strategies and Plans in 2010 GSDC office opening ceremony CERN.
Sejong STATUS Chang Yeong CHOI CERN, ALICE LHC Computing Grid Tier-2 Workshop in Asia, 1 th December 2006.
Status Report of WLCG Tier-1 candidate for KISTI-GSDC Sang-Un Ahn, for the GSDC Tier-1 Team GSDC Tier-1 Team 12 th CERN-Korea.
KISTI-GSDC SITE REPORT Sang-Un Ahn, Jin Kim On the behalf of KISTI GSDC 24 March 2015 HEPiX Spring 2015 Workshop Oxford University, Oxford, UK.
V.Ilyin, V.Gavrilov, O.Kodolova, V.Korenkov, E.Tikhonenko Meeting of Russia-CERN JWG on LHC computing CERN, March 14, 2007 RDMS CMS Computing.
KISTI-GSDC SITE REPORT Asia Tier Center KISTI, Daejeon, South Korea 22 Sep – 24 Sep 2015 Sang-Un Ahn on the behalf of KISTI-GSDC.
Ian Bird LCG Project Leader WLCG Collaboration Issues WLCG Collaboration Board 24 th April 2008.
Status Report of WLCG Tier-1 candidate for KISTI-GSDC Sang-Un Ahn, for the GSDC Tier-1 Team GSDC Tier-1 Team ATHIC2012, Busan,
Procedure to follow for proposed new Tier 1 sites Ian Bird CERN, 27 th March 2012.
Jan 2010 OSG Update Grid Deployment Board, Feb 10 th 2010 Now having daily attendance at the WLCG daily operations meeting. Helping in ensuring tickets.
Procedure for proposed new Tier 1 sites Ian Bird WLCG Overview Board CERN, 9 th March 2012.
Site Report: Prague Jiří Chudoba Institute of Physics, Prague WLCG GridKa+T2s Workshop.
Tier-1 Andrew Sansum Deployment Board 12 July 2007.
STATUS OF KISTI TIER1 Sang-Un Ahn On behalf of the GSDC Tier1 Team WLCG Management Board 18 November 2014.
LCG WLCG Accounting: Update, Issues, and Plans John Gordon RAL Management Board, 19 December 2006.
JINR WLCG Tier 1 for CMS CICC comprises 2582 Core Disk storage capacity 1800 TB Availability and Reliability = 99% 49% 44% JINR (Dubna)End of.
LCG Accounting Update John Gordon, CCLRC-RAL WLCG Workshop, CERN 24/1/2007 LCG.
BaBar Cluster Had been unstable mainly because of failing disks Very few (
Eygene Ryabinkin, on behalf of KI and JINR Grid teams Russian Tier-1 status report May 9th 2014, WLCG Overview Board meeting.
LCG Issues from GDB John Gordon, STFC WLCG MB meeting September 28 th 2010.
Data transfers and storage Kilian Schwarz GSI. GSI – current storage capacities vobox LCG RB/CE GSI batchfarm: ALICE cluster (67 nodes/480 cores for batch.
Development of a Tier-1 computing cluster at National Research Centre 'Kurchatov Institute' Igor Tkachenko on behalf of the NRC-KI Tier-1 team National.
WLCG Operations Coordination report Maria Alandes, Andrea Sciabà IT-SDC On behalf of the WLCG Operations Coordination team GDB 9 th April 2014.
WLCG Status Report Ian Bird Austrian Tier 2 Workshop 22 nd June, 2010.
Status of GSDC, KISTI Sang-Un Ahn, for the GSDC Tier-1 Team
Dominique Boutigny December 12, 2006 CC-IN2P3 a Tier-1 for W-LCG 1 st Chinese – French Workshop on LHC Physics and associated Grid Computing IHEP - Beijing.
Global Science experimental Data hub Center April 25, 2016 Seo-Young Noh Status Report on KISTI’s Computing Activities.
LCG Accounting Update John Gordon, CCLRC-RAL 10/1/2007.
Pledged and delivered resources to ALICE Grid computing in Germany Kilian Schwarz GSI Darmstadt ALICE Offline Week.
Grid Operations in Germany T1-T2 workshop 2015 Torino, Italy Kilian Schwarz WooJin Park Christopher Jung.
LHC collisions rate: Hz New PHYSICS rate: Hz Event selection: 1 in 10,000,000,000,000 Signal/Noise: Raw Data volumes produced.
Availability of ALICE Grid resources in Germany Kilian Schwarz GSI Darmstadt ALICE Offline Week.
T0-T1 Networking Meeting 16th June Meeting
WLCG IPv6 deployment strategy
COMPUTING FOR ALICE IN THE CZECH REPUBLIC in 2015/2016
COMPUTING FOR ALICE IN THE CZECH REPUBLIC in 2016/2017
Ian Bird WLCG Workshop San Francisco, 8th October 2016
The Beijing Tier 2: status and plans
LCG Service Challenge: Planning and Milestones
Andrea Chierici On behalf of INFN-T1 staff
October 28, 2013 at 14th CERN-Korea Committee, Geneva
Vanderbilt Tier 2 Project
Kolkata Status and Plan
LCG-France activities
The CREAM CE: When can the LCG-CE be replaced?
KISTI-GSDC Tier-1 SITE REPORT
Proposal for obtaining installed capacity
Luca dell’Agnello INFN-CNAF
RDIG for ALICE today and in future
Update from the HEPiX IPv6 WG
Project Status Report Computing Resource Review Board Ian Bird
ALICE – FAIR Offline Meeting KVI (Groningen), 3-4 May 2010
PK-CIIT Grid Operations in Pakistan
Bernd Panzer-Steindel CERN/IT
Romanian Sites Current Status
IPv6 update Duncan Rand Imperial College London
The LHCb Computing Data Challenge DC06
Presentation transcript:

Update on Plan for Tier-1 @ KISTI-GSDC GSDC Tier-1 Team Update on Plan for Tier-1 @ KISTI-GSDC Sang-Un Ahn, for the GSDC Tier-1 Team sahn@kisti.re.kr 20/11/2012 WLCG MB

Outline Current Status Update on Plan Conclusion Resource Summary Operation status Network Update on Plan Tape: installation & test Network upgrade Pledges SAM & APEL Staff Conclusion WLCG MB/20. 11. 2012

Resource Summary Operation Network Current Status WLCG MB/20. 11. 2012

Resource Summary Disks Middleware components Tape (being installed) CPUs Intel Xeon, 24 cores w/ 96GB (3GB/core) x 62 WNs = 1488 cores (~17k HS06) Disks 1000 TB disks Middleware components CREAM-CE, site-BDII, VOBOX, XROOTD, WNs, APEL Production in gLite3.2 -> EMI migration in progress: EMI-2 on SL6 Tape (being installed) 1 PB capacity, 275 TB buffer, 2 GB/s throughput Network Dedicated 1Gbps established Storage Element Status @ MonALISA WLCG MB/20. 11. 2012

Operation Job capacity more than 1400 jobs since the end of July Internal network issue solved Quite stable now but instability on PBS requires its restarting in 48/72hrs Hope to be improved after EMI-2 migration Internal network issue solved 1,400 # of Jobs Stable status Active jobs March – October in 2012 WLCG MB/20. 11. 2012

Network Traffic Status GLORIAD-KR – CERN (dedicated 1Gbps) ‘Yearly’ graph (1 Day Average) Correlation with # of active jobs Incoming Traffic in bps Outgoing Traffic in bps Maximal 5 minutes Incoming Traffic Maximal 5 minutes Outgoing Traffic Start of torrent-based ALICE package distribution service: Observed large incoming traffic (maximal 5 minutes) after Dedicated 1Gbps established Functional test Internal network issue solved WLCG MB/20. 11. 2012

Update on Plan TAPE: installation & test Network upgrade Pledges SAM & APEL Staff Update on Plan WLCG MB/20. 11. 2012

Capacity (expendable) TAPE IBM TAPE library (TS3500) TSM and GPFS on SL6.3 is being installed and functioning test will be complete in this week Disk buffer for cache (allows prompt access to archived data) ALICE request: Min. 200 TB; max. 400 TB for pA 275 TB is now assigned for buffer Start of data transfer test with ALICE is foreseen by 3 Dec. 2012 Capacity (expendable) Tape Drive Throughput Robotics Support 1 PB (3PB) 8 drives: R/W @ 250MB/s 2 GB/s Dual 24/7 recovery for 3 years WLCG MB/20. 11. 2012

Network to LHCOPN Currently, 1Gbps (dedicated) connection for CERN-KISTI 10Gbps connection is required to join LHC OPN (Optical Private Network) In April 2013, dedicated 2Gbps will be established (budget secured) Plan for upgrading 3Gbps will be presented by May 2013 Dedicated 1Gbps Shared 10Gbps Dedicated 1Gbps Current Network Set-up WLCG MB/20. 11. 2012

Pledged Pledged resources Based on WLCG & ALICE Collaboration MoU Provides 2500 cores (~31k HS06) & 2PB for TAPE by 2014 Meeting ALICE requirement by 2013 Current (ALICE Req.) Pledged 2012 2013 2014 CPUs (HS06) 16,900 (25,000) 18,800 25,000 31,250 Disk (TB) 1,000 (1,000) Tape (TB) - (1,500) 700 1,500 2,000 WLCG MB/20. 11. 2012

SAM & APEL Job queues available for OPS VO KISTI_GSDC included monthly SAM report for OPS VO Not monitored by ALICE VO APEL server is running and properly publishing accounting data Recently found APEL was not correctly configured Fixed it and should be working now WLCG MB/20. 11. 2012

Staff Good News Bad News ROLE June (7 FTE) Current (7 FTE) System Admin Disk & Server 3 FTE 2.5 FTE (2 FTE to be employed) Tape 1 FTE (to be employed) 1 FTE Grid Middleware 1.5 FTE Network 0.5 FTE + KISTI support Power/Cooling KISTI support Physics Analysis ALICE service 1 FTE (0.5 FTE to be employed) Good News 2 new member employed in June: 1 for TAPE; 1 for M/W and ALICE support Bad News 1 member (Beob Kyun Kim) for M/W left in September and 1 member for S/A would leave soon WLCG MB/20. 11. 2012

Milestones T1 Demonstration Plan Roadmap Summary WLCG MB/20. 11. 2012

Milestones Objective Target date Original Revised WLCG MB/20. 11. 2012 Nominate KISTI/GSDC representatives in the WLCG Management Board and the GDB Jun. 2012 - Establishment of a 1Gbps connectivity to CERN Apr. 2012 Installation of tape system Nov. 2012 Dec. 2012 High speed transfer of data from CERN to KISTI at the speed required to receive and archive 10% of the ALICE AA raw data foreseen for 2012 over a continuous period of 2 weeks Jan. 2012 Provide a precise plan for 3Gbps (or higher) connectivity to CERN Jan. 2013 May 2013 Present a plan for providing on-call services/support according to the T1 specifications as laid out in the WLCG MoU 85% of the job capacity running for at least 2 months Feb. 2013 90% Storage Element (DPM and/or XROOTD ?) availability (functional tests) for at least 2 months Jul. 2013 Running of the reliability tests (both OPS and ALICE-specific) and publishing those to the new SAM infrastructure Integration with the APEL accounting system and publishing accounting data 90% of the WLCG T1 service targets for at least 2 months Sep. 2013 Integration in the WLCG OPN (with 2Gbps) Functional tests of the OPN (with 2Gbps) Aug. 2013 ■ Done ■ Almost done ■ To be done ■ In question ■ Urgent WLCG MB/20. 11. 2012

T1 Roadmap TAPE library set-up and data transfer test: to be ready for pA Plan for 3Gbps to be provided by May 2013 Internal discussion on 24hr on-call service: monitoring, shift, and documentations … >85% job capacity can be accomplished Demonstration of Tier-1 target services (>90%) at least 2 months WLCG MB/20. 11. 2012

Thank you WLCG MB/20. 11. 2012