Laboratories in Annecy working on Vibration Stabilization

Slides:



Advertisements
Similar presentations
FINAL FOCUS: COMBINATION OF PRE ISOLATOR AND ACTIVE STABILISATION K. Artoos, C. Collette, R. Leuxe, C.Eymin, P. Fernandez, S. Janssens * The research leading.
Advertisements

Passive isolation: Pre-isolation for FF quads A. Gaddi, H. Gerwig, A. Hervé, N. Siegrist, F. Ramos.
1 LAViSta Laboratories in Annecy working on Vibration and Stabilisation Impact of random and determinist acoustic noise on vibrations at high frequencies.
Benoit BOLZON Nanobeam 2005 – Kyoto Active mechanical stabilisation LAViSta Laboratories in Annecy working on Vibration Stabilisation Catherine ADLOFF.
B. Caron, G. Balik, L. Brunetti LAViSta Team LAPP-IN2P3-CNRS, Université de Savoie, Annecy, France & SYMME-POLYTECH Annecy-Chambéry, Université de Savoie,
CERN VIBRATION SENSOR PROPOSAL The research leading to these results has received funding from the European Commission under the FP7 Research Infrastructures.
Introduction to seismic sensors (subject 3.2) Peter Novotny PACMAN meeting, CERN, 7 October 2014.
1 LAViSta Laboratories in Annecy working on Vibration and Stabilisation Catherine ADLOFF Andrea JEREMIE Jacques LOTTIN Benoît BOLZON Yannis KARYOTAKIS.
1 ATF2 project: Investigation on the honeycomb table vibrations Benoit BOLZON 33rd ATF2 meeting, 24th January 2007 Laboratories in Annecy working on Vibration.
ATF2 week meeting: Impact of cooling water on the final doublets vibrations Benoît BOLZON Laboratories in Annecy working on Vibration Stabilization 15/10/08.
Vibration measurements on the final doublets and the Shintake Monitor Benoît BOLZON7th ATF2 project meeting, 16/12/08.
Update of the ground motion generator of A. Seryi for ATF2 thanks to ground motion measurements in the ATF2 beam line 1 Benoît BOLZONATF2 software task.
Installation of FD in September A.Jeremie, B.Bolzon, N.Geffroy, G.Gaillard, J.P.Baud, F.Peltier With the help of KEK, SLAC, KNU and CERN colleagues For.
1 FEA of Towers for Dome C JL Dournaux / JPh Amans GEPI, Pôle Instrumental - Paris Observatory
IN2P3 Les deux infinis G. Balik, B. Caron, L. Brunetti (LAViSta Team) LAPP-IN2P3-CNRS, Université de Savoie, Annecy, France & SYMME-POLYTECH Annecy-Chambéry,
A.Jeremie LAViSta: Laboratories in Annecy working on Vibration Stabilization Some information on the Stacis 2000 Table from CERN, currently in Annecy B.Bolzon,
CERN, BE-ABP (Accelerators and Beam Physics group) Jürgen Pfingstner Orbit feedback design for the CLIC ML and BDS Orbit feedback design for the CLIC ML.
QD0 stabilization L. Brunetti 1, N. Allemandou 1, J.-P. Baud 1, G. Balik 1, G. Deleglise 1, A. Jeremie 1, S. Vilalte 1 B. Caron 2, C. Hernandez 2, (LAViSta.
Hcal Geometry and Assembly CLIC Meeting - LAPP December 2008, 15th.
CLIC QD0 Stabilization J. Allibe 1, L. Brunetti 1, J.-P. Baud 1, G. Balik 1, G. Deleglise 1, A. Jeremie 1, S. Vilalte 1 B. Caron 2,C.Hernandez 2 1 : LAPP-IN2P3-CNRS,
Vibration Measurement on the Shintake Monitor and Final Doublet Takashi Yamanaka (Univ. of Tokyo) Benoît Bolzon (LAPP) ATF2 weekly meeting 26 November,
CLIC MDI stabilization update A.Jeremie G.Balik, B.Bolzon, L.Brunetti, G.Deleglise A.Badel, B.Caron, R.Lebreton, J.Lottin Together with colleagues from.
CLIC MDI Working Group Vibration attenuation via passive pre- isolation of the FF quads A. Gaddi, H. Gerwig, A. Hervé, N. Siegrist, F. Ramos.
1 H. Yamaoka R. Sugahara M. Masuzawa IR stability at SuperKEKB June 14, ‘10 H. Yamaoka.
BPM support and beam pipe length FD support status A.Jeremie.
July 5, 2007 C. HAUVILLER CLIC stabilization Beam line and final focus.
Update of a ground motion generator to study the stabilisation usefulness of ATF2 final focus quadrupoles 1 Benoît BOLZON B. Bolzon, A. Jeremie (LAPP)
QF1 vibration status A.Jeremie A.Jeremie, N.Geffroy, drawings by Araki-san.
Vibration Stability Studies of a Superconducting XFEL/ILC Accelerating Module at Room Temperature and at 4.5K R. Amirikas, A. Bertolini, W. Bialowons.
CARE / ELAN / EUROTeV Feedback Loop on a large scale quadrupole prototype Laurent Brunetti* Jacques Lottin**
1 SiD Push-pull Plans Marco Oriunno, SLAC International Workshop on Linear Colliders 2010 Geneva, October 2010 M.Oriunno, IWLC10 – Geneva, Oct.2010.
CARE / ELAN / EUROTeV Active stabilization of a mechanical structure Laurent BRUNETTI LAViSta Team LAPP-IN2P3-CNRS,
FD support Andrea JEREMIE N.Geffroy, B.Bolzon, G.Gaillard.
B. Caron, G. Balik, L. Brunetti LAViSta Team LAPP-IN2P3-CNRS, Université de Savoie, Annecy, France & SYMME-POLYTECH Annecy-Chambéry, Université de Savoie,
How high frequency we care if we need the stabilization of 1nm level?
1 ATF2 Project Meeting December 2006 Ground Stabilisation with the CERN STACIS 2000 Stable Active Control Isolation System LAViSta Laboratories in.
Main beam Quad Stabilisation: Status of the stabilisation test program at CERN CLIC-stabilization day S. Janssens Contribution to slides by:
1/13 Tatsuya KUME Mechanical Engineering Center, High Energy Accelerator Research Organization (KEK) ATF2-IN2P3-KEK kick-off meeting (Oct. 9, 2006) Mount.
Passive isolation: Pre-isolation for FF quads A. Gaddi, H. Gerwig, A. Hervé, N. Siegrist, F. Ramos.
Superconducting final doublet Support A.Jeremie. SC magnet steps Motivation: have an active stabilisation as planned in ILC and CLIC => need to evaluate.
Vibrations studies for the nominal optics and the ultra-low beta optics Benoît BOLZON 1 B. Bolzon, A. Jeremie (LAPP) P. Bambade, Y. Renier (LAL) A. Seryi.
1 KEK Hiroshi Yamaoka Vibration analysis of the ILD QD0-support system Oct, 2 nd '09 KEK H. Yamaoka - Results of Vibration analysis - Coherency measurement.
CERN, 27-Mar EuCARD NCLinac Task /3/2009.
ATF2: final doublet support Andrea JEREMIE B.Bolzon, N.Geffroy, G.Gaillard, J.P.Baud, F.Peltier With constant interaction with colleagues from KEK, SLAC.
NLC - The Next Linear Collider Project Keeping Nanometer Beams Colliding Vibration Stabilization of the Final Doublet Tom Himel SLAC NLC MAC review October.
Test plan for CLIC MB linac quad LAPP option A.Jeremie.
QD0 stabilisation in CLIC CDR A.Jeremie with LAViSta team.
Progress of Shintake Monitor (ATF2 IP-BSM) KEK site meeting 2008/10/31 Takashi Yamanaka.
Vibration measurements with and without Monalisa 15/07/09 Benoît BOLZON (LAPP) David Urner (Oxford) Paul Coe (Oxford) 1 Benoît BOLZON.
1 A_RD_2A_RD_2 Design of the linear collider machine-detector interface and ATF-2 at KEK Ph.Bambade, J.Brossard, O.Dadoun, C.Rimbault, M.Alabau Pons, A.Jeremie,
FF Stabilisation A.Jeremie (Summary of things learned and work done at LAPP, CERN, SYMME, Oxford, SLAC)
QD0 Stabilisation L. Brunetti 1, J. Allibe 1, J.-P. Baud 1, G. Balik 1, G. Deleglise 1, A. Jeremie 1, S. Vilalte 1 B. Caron 2, A. Badel 2, R. Le Breton.
CARE05 – November Status report on active stabilisation of a linear collider final focus quadrupole mock-up J. Lottin, ESIA
Alignment and stability session
BNL-SLAC-Annecy TeleConference
Summary FD Support System
Vibration issues at Linear Colliders:
ILC MDI Platform Concept
Seismic motion analysis of the SuperB site of Frascati
Active isolation Target : a low cost dedicated table
A.Jeremie, B.Bolzon, N.Geffroy, C.Girard, (G.Gaillard)
EuroTeV WP7 activities in DESY
3: ISI ASCR, Brno University of Technology, Brno, Czech Republic
Vibration studies for the QD0-support system
ATF2: final doublet support
Dead zone analysis of ECAL barrel modules under static and dynamic loads for ILD Thomas PIERRE-EMILE, Marc ANDUZE– LLR.
A.Jeremie, B.Bolzon, N.Geffroy
IP configuration session
HBP impedance calculations
Seismometer Development for the 1TeV Linear Collider
Presentation transcript:

Laboratories in Annecy working on Vibration Stabilization ATF2 project: Expected honeycomb table and floor vibrations at ATF Ring Laboratories in Annecy working on Vibration Stabilization Benoit BOLZON ATF2 phone conference, 18th April 2007

Presentation ATF2 constraint: Relative motion between the Shintake monitor and the final magnets < 6nm ILC configuration: Final magnets and Shintake monitor on 2 separate supports ATF2 floor: Coherence of ground motion good up to a distance of 4-5m (4m: distance between Shintake monitor and the last magnets) First idea: Shintake monitor and last magnets movement same than the ground  Necessity of having stiff supports well fixed on the floor in order that these supports move like ground motion

Honeycomb table eigenfrequencies At LAPP: Very stiff honeycomb table with a first eigenfrequency guaranteed at 230Hz by TMC Company in free-free configuration Measurements done with an impact testing hammer Table supported at four points by pneumatic isolators along the 2 nodal lines 22% from the ends of the table  Free-free configuration

Honeycomb table eigenfrequencies Honeycomb table: Good candidate as a support for magnets Fixation of this table to the ground to have the same motion Fixed-fixed configuration: Eigenfrequencies not the same Simple block simulation done by Nicolas Geffroy: Full block with the table dimensions (240*90*60cm) Calculation of the density to obtain the table weight (700kg) Young modulus chosen (rigidity) to obtain the first eigenfrequency of the table in free-free configuration (230Hz)

Honeycomb table eigenfrequencies Boundary conditions at the 4 extremities of the table: Simple and rigid supports Fixed-fixed configuration Same values of eigenfrequencies obtained First eigenfrequency at 56.2Hz: Well lower than in free-free configuration!!! Other eigenfrequencies: 58.1Hz, 58.6Hz, 76.0Hz, 85.4Hz, 95.4Hz, 248.1Hz…

Measurements outline LAVISTA team: Investigation on our honeycomb table Fixation of the table to the ground Vibrations transmissibility study between table and floor  Coherence between table and floor measurements at LAPP  Table transfer function measurements at LAPP Expected floor and table motion at ATF Ring Expected relative motion between table and floor at ATF Ring

Fixation of the table to the ground Ground not flat at all: Positioning of 4 high steel supports of the same layer (with a thickness precision of 0.1mm) between the ground and the four corners of the table  Gap of 5mm between the top of a support and the bottom of one table corner Not to have this gap anymore: positioning of 2 home-made spacers with a thickness precision of 0.1mm

Fixation of the table to the ground Checking that the table is leveled thanks to a spirit level

Sensors used for the vibrations transmissibility study Limitation of the measurement:  Guralp sensors: - From 0.1Hz: Electronic noise too high below - To 50Hz: Frequency response not flat above  ENDEVCO sensors: - From 10Hz: Electronic noise to high below - To 100Hz: Frequency response not flat above

Sensors used for the vibrations transmissibility study One Guralp velocity sensor on the floor and the other one on the table to measure low frequency vibrations in the X, Y and Z directions (0.1Hz to 50Hz) One ENDEVCO accelerometer on the floor and the other one on the table to measure medium frequency vibrations in the Z directions (10Hz to 100Hz) One microphone on the floor to study acoustic effect on the table behaviour Simultaneous measurements of the 4 sensors in the Z direction Guralp velocity sensors ENDEVCO accelerometers Microphone

Vibrations transmissibility study between table and floor Magnitude of table transfer function measured at LAPP: Ground motion amplification Up to 20Hz: Table transfer function magnitude around 1  No big amplification or damping done by the table Above 20Hz: Increase of table transfer function magnitude  Ground motion amplification done by the table up to a factor 11 at 68Hz

Vibrations transmissibility study between table and floor Simulation of a simple block put on rigid supports or in fixed-fixed mode: eigenfrequencies begin at 56Hz and close to each other Measured table transfer function: eigenfrequencies begin also around 50Hz and also close to each other except for the 2 first ones Not really eigenfrequencies? Table not well put on supports? Supports not well put on the floor?

Vibrations transmissibility study between table and floor Phase of table transfer function measured at LAPP: Up to 20Hz: Table transfer function phase around 0  Almost no phase differences of floor vibrations with respect to the table Above 20Hz: Increase of table transfer function phase  Phase differences of floor vibrations with respect to the table up to ±180˚

Vibrations transmissibility study between table and floor Coherence between the table and the floor measured at LAPP: Guralp geophones electronic noise Up to 20Hz: Coherence around 1  Almost linear vibrations transmissibility between table and ground Above 20Hz: Fall down of coherence  Probably due to non linear vibrations transmissibility: Bad fixation of the supports to the table and to the ground

Expected floor and table vibrations at ATF Ring Floor vibrations at ATF Ring: 2 data files from 2 types of sensors STS-2 seismometer: Good coherence from 0.1Hz to 50Hz Servo accelerometer: Good coherence from 3Hz to 100Hz ATF Ring floor vibrations data: STS-2 seismometer: from 0.1Hz to 50Hz Servo accelerometer: from 50Hz to 100Hz Ground motion quite the same

Expected floor and table vibrations at ATF Ring Displacement Power Spectrum Density (PSD) of the table at ATF = (Table transfer function magnitude)^2 *ATF floor displacement PSD

Expected floor and table vibrations at ATF Ring Integrated displacement Root Mean Square at ATF Ring: Difference of integrated displacement RMS from 0.1Hz to 100Hz: 3.3nm!!! But phase differences between table and floor not taken into account  Relative motion calculation to know the real difference of motion

Relative motion between table and floor at ATF Ring Power Spectrum Density (PSD) of relative motion at ATF Ring: = ATF floor displacement PSD * [1+Re(g)^2 - 2*Re(g) + Im(g)^2] with: g: Table transfer function (Complex number)

Relative motion between table and floor at ATF Ring Integrated displacement RMS of relative motion at ATF Ring: Integrated relative motion between floor and table at ATF Ring: - Above 0.1Hz: 5.95nm  Below ATF tolerances (6nm)!!! - Above 50Hz: 0.78nm  Negligible

General conclusion and future prospects Integrated RMS of relative motion between table and floor at ATF Ring (with the table not well fixed to the floor): Above 0.1Hz: 5.95nm  Below ATF tolerances (6nm)!! Above 50Hz: 0.78nm  Negligible Near future: Fixation of the table to the ground (Linear vibrations transmissibility: coherence=1)  Fixed-fixed configuration Simple block simulation: First eigenfrequency at 58Hz  Should have no ground motion amplification below 50Hz (see magnitude transfer function)  Should have no phase differences below 50Hz between the table and the floor (see phase transfer function) Honeycomb table Relative motion should be lower