FIXM – GUFI Manfred Beckmann (SOLITEC)

Slides:



Advertisements
Similar presentations
SIP/2012/ASBU/Nairobi-WP/19
Advertisements

FIXM – What’s it all about?
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-30/PIA-2 Service Improvement through Digital Aeronautical Information.
FIXM Breakout Introduction
Integrating information towards Digital ATM Common Flight Identifiers Presented By: Chris Dodson (BA), Jim Miller (DEN) Date:August 28, 2013.
IATA views on Information management JF Grout Assistant Director ICAO relations.
Delivering Digital Services International Collaboration - Towards the 4DT for FF-ICE Step 1 Presented By: Dr. Stéphane Mondoloni Date:August 27, 2014.
International Civil Aviation Organization European and North Atlantic Office Outcome of the ICAO EUR FPL2012 Workshop Kiev, Ukraine 29 June – 1 July 2010.
Delivering Digital Services FIXM - Flight Information Exchange Model Presented By: Rob Hunt Manager, FAA, Air Traffic Organization, Technical Analysis.
Delivering Digital Services WP6 – SESAR SWIM State of Play ICAO IMP-# January 2015 Presented By: Paul BOSMAN Head SWIM/Architecture.
Delivering Digital Services SESAR AIRM Status Report Presented By: Hubert LEPORI EUROCONTROL Date:August 26, 2014.
International Civil Aviation Organization Collaborative Decision Making (CDM) Saulo Da Silva Workshop on preparations for ANConf/12 − ASBU methodology.
Integrating information towards Digital ATM Mini Global Demonstration Presented By: Thien Ngo Date:August 28, 2013.
Integrating information towards Digital ATM FIXM – Flight Information Exchange Model Presented By: Richard Jehlen Director, FAA, Air Traffic Organization,
Integrating information towards Digital ATM Information Structures - AIXM - Presented By: Eduard Porosnicu, Eurocontrol Date:August 27, 2013.
3 – 4 September 2015 Delhi, India Piyawut Tantimekabut (Toon)
Integrating information towards Digital ATM Airservices Australia FIXM Experience Presented By: Paul Chisholm, Ph.D. Airservices Australia Date:August.
Aeronautical Information Exchange Model (AIXM). Introduction “Never let an aircraft take you somewhere your brain didn't get to five minutes earlier”
CANSO Role in ATFM/CDM in APAC
AIXM - purpose, scope, implementation and future evolution.
AIS-AIMSG/12 Briefing to ANC AIS-AIMSG/12 Briefing to ANC 23 October 2015.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-30/PIA-2 Service Improvement through Digital Aeronautical Information.
AIS-AIMSG/12 Briefing to ANC 23 October 2015
FIXM briefing for the AIXM CCB Hubert LEPORI EUROCONTROL, ATM/STR/SWM
SYMPOSIUM OUTCOMES AND THE WAY FORWARD
Collaborative Decision Making (CDM) Saulo Da Silva
AIS-AIM SG - #4 Agenda item 4.1 Integration with other services - SWIM
AVIATION SYSTEM BLOCK UPGRADES (ASBU)
System Wide Information Management
5-7 DEC 2016, EUROCONTROL HQ, Brussels
Presented by United Arab Emirates
FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE
AIXM 5.1 – Interoperability issues
Workshop on preparations for ANConf/12 − ASBU methodology
FIXM – What’s it all about?
SIP/2012/ASBU/Nairobi-WP/19
Workshop on preparations for ANConf/12 − ASBU methodology
Messaging support FIXM 4.0 Guidance Materials
Mini Global Demonstration
AIM Operational Concept
GOLD GOLD Amendment Program Presented to: SOCM/2 Seminar
Chapter 6 Sub-Group ICAO Headquarters, November 2013
Workshop on preparations for ANConf/12 − ASBU methodology
AIXM 5.1 – Interoperability issues
AIXM 5.1 – Interoperability issues
AIXM CCB meeting EUROCONTROL HQ, Brussels
Flight and Flow Information for a Collaborative Environment (FF-ICE)
AIXM 5.1 – Interoperability issues
Recommending a Strategy
AIXM 5 Overview xNOTAM Workshop #2 Brussels, November 2007
AIXM 5 Development Status
CIM Model Manager Report
Advancing Digital NOTAM implementation
AIXM CCB meeting EUROCONTROL HQ, Brussels
CANSO Role in ATFM/CDM in APAC
AIXM 5.2 – WIP AIXM CCB – Webex 26 July 2018.
AIM Global Strategy Air Navigation Procedures for AIM Seminar
P. Cruellas EUROCONTROL DSR SWIM/EA Unit
AIXM 5.1 – Interoperability issues
AIXM CCB – Webex 24 January 2017
AIXM 5.1 – Interoperability issues
Maintenance Management Information eXchange Model (MMIXM)
Aeronautical Information Exchange Model (AIXM) – Business Rules
ICAO ACP Working Group M Iridium Sub Group Overview
AIXM 5.2 – WIP AIXM CCB – Webex 26 APR 2018.
ICAO AIRM briefing for the AIXM CCB Scott WILSON
AIXM 5.2 – WIP AIXM CCB – Webex 29 March 2017.
AIXM 5.2 – WIP AIXM CCB – Webex 10 OCT 2017.
AIXM 5.1 – Interoperability issues
Presentation transcript:

FIXM – GUFI Manfred Beckmann (SOLITEC) AIXM CCB – 05 December 2016

Proposed Agenda Baseline Material GUFI Format GUFI Concept and Requirements GUFI Significant Issues ICAO FF-ICE Concept Use Case Model GUFI Provision Flight Domain Model References from FIXM to AIXM UML Model Sample FIXM message Lessons Learned?

Baseline Material fixm.aero (Flight Information Exchange Model) FIXM Core Release v4.0.0 (31-Aug-2016) Globally Unique Flight Identifier (GUFI) Format and Content version 2.1 (23-Jun-2014) Globally Unique Flight Identifier (GUFI) Requirements version 2.1 (23-June-2014) FIXM Implementation Guidance Package version DRAFT (31-Aug-2016)*Updated 31-Oct-2016 aidx.aero (Aviation Information Data Exchange) ICAO Doc 9965, Manual on Flight and Flow — Information for a Collaborative Environment (FF-ICE)

GUFI Format Globally Unique Flight Identifier (GUFI) attached to every ATM flight data transaction for a flight allow systems to easily and accurately correlate the data Work carried out previously on the format: Natural identifier (information about the flight is encoded in the flight identifier) adopted by the Aviation Information Data Exchange (AIDX) presently used in a business context by members of the International Air Transport Association (IATA) Meta-identifier (information about the GUFI itself is encoded in the flight identifier) Uninterpreted identifier (identifier has no semantic content)

GUFI Concept and Requirements Two contexts: commercial data and ATM data Commercial data: schedules to plan sequences of flights far into the future (up to a year), but also between airline and airport operator to provide status for flights on a given day. ATM flight data used to coordinate operation of particular flight between flight operators and ATM service providers. Only one set of data for a flight, and one GUFI associated with that data set. Concept of Use The first time any ATM data is shared between any two systems for a flight, a GUFI must be assigned to the flight. Any system that processes ATM data for a flight must use the GUFI to associate the data in the transaction with its internal representation of the flight’s data. Interoperability and Transition Requirements defined

GUFI Significant Issues Who is responsible for creating GUFIs? Flight Operator? ANSP? How are GUFIs kept unique?  UUID When does flight data change so much that a new GUFI is needed? E.g. flight changes its destination? What does a transition environment look like? E.g. flight transitions GUFI ATM -> legacy ATM -> GUFI ATM How to make sure only one GUFI is assigned to the same flight?

ICAO FF-ICE Concept As of FIXM v4.0.0, requirements come from the FF-ICE/1 implementation manual. Rather one joint context: Commercial & ATM data

FF-ICE – Use Case Model

FF-ICE – GUFI Provision

FF-ICE – Domain Model

References from FIXM to AIXM

References from FIXM to AIXM <message xsi:type="MessageType"> <flight flightType="S"> <fx:departure> <fx:aerodrome xsi:type="fb:IcaoAerodromeReferenceType" locationIndicator="LOWW"/> <fx:estimatedOffBlockTime timeReference="UTC">2018-01-31T11:20:00.000Z</fx:estimatedOffBlockTime> </fx:departure> <fx:destination> <fx:aerodrome xsi:type="fb:OtherReferenceType" iataDesignator=„BRU"/> </fx:destination> <fx:operator designatorIcao="AUA"> <fb:operatingOrganization name="AUSTRIAN"/> </fx:operator> </flight> </message>

Lessons Learned? “To define a unique flight identifier, it is necessary to first define a unique flight.”  Feature identifying properties Clear responsibility for GUFI creation needed Still significant issues to be addressed FIXM references to AIXM via various natural keys