No Removal of cellar frames by hands

Slides:



Advertisements
Similar presentations
Always start a vehicle correctly
Advertisements

Always use the correct lifting equipment
PDO Second Alert What happened? Your learning from this incident..
Always use mechanical handling aids when carrying out a heavy lift
Ensure a safety briefing is given where appropriate
Always ensure travelling block is stationary during DM changeover
Always use mechanical handling aids when carrying out a heavy lift
Always use 3 points of contact when using ladders
PDO Second Alert Date: Incident : LTI What happened?
Comply with Safe Operating Procedures
PDO Second Alert Valves open Valve closed Valves open Valve open
Don’t pull a twisted sling
Never place yourself in line of fire
Maintain 3 point contact when you climb Ladder
PDO Second Alert Date: Incident title: Fall from Height
PDO Second Alert Stay out of the line of fire What happened:
Drive with appropriate speed to road conditions
Use right tools for the job and use them correctly
Do not work at height without fall protection
PDO Second Alert Date: Incident type: LTI What happened?
Always ensure a stable position when working at height!
Always wear fall protection equipment when working at height
Avoid taking shortcuts
Ensure a working platform is adjusted and used
Follow Management of Change for an activity which is not in permit
PDO Second Alert Date: Incident: LTI What happened?
Keep away form ‘line of fire’
Keep away from “Line of Fire”
Always use the correct tools for the job
Always use the right equipment for the task !!!!
Ensure 3 point contact maintained whilst using ladder
Ensure OHL Clearance required for your lifting activity
No hands on elevator while delivering pipe
Never put your Hands in line of fire
Always stay out of the line of fire
Ensure cat line are under tension before removing elevator bolts
PDO Second Alert Date: Incident title: LTI What happened?
Beware of Fall hazards while working at edge of trailer
Adequate tethered tools
PDO Second Alert Photo explaining what was done wrong
If in doubt – stop the job
Photo explaining what was done wrong
Pay attention to your footing
PDO Second Alert Date: Incident: LTI What happened?
Always use secondary retention
Keep your hands in a safe position
Never place yourself in “line of fire”
Always assess the risks, Stop and think.
PDO Second Alert What happened? Your learning from this incident..
PDO Second Alert Date: Incident title: HiPo What happened?
Your health is your responsibility
Always ensure “no go” zone are in place
Check equipment prior to start the job
PDO Second Alert What happened? Your learning from this incident..
Do not move into the Line of Fire
Seek assistance of Banksman while reversing the vehicle
Always intervene an unsafe act
Always keep your hands and fingers away from the Line of Fire
Always keep your equipment maintained
Effective communication prevents incidents
Check Level Setup prior Lifting & Lowering Operation
Use a tool and protect your hands
Always adhere to Red/No Go zones
Keep away from “Line of Fire”
Vehicles to Keep Safe Distance at all times
Maintain communication between peers
Carillion Alawi LLC, Incident Type LTI No, 16/12/18
Keep away from the line of fire
Beware of raised edges of walk ways.
Use hands-off where possible
Presentation transcript:

No Removal of cellar frames by hands PDO Second Alert Date: 27.10.2016 PDO - LTI # 37 What happened? A PDO Operator along with his assistant was to operate a valve on casing which was at a depth of 1.2 meter from the ground level for re-commissioning of the well. While removing a section of the grating frame, the assistant operator stepped on an unstable frame, lost his balance and fell forward into the cellar which is 2.4 meter deep. As a result of falling the assistant sustained head injury (Trauma). Operator called Bahja operations for rescue support. Meanwhile he managed to get support from the nearby Well Pulling Hoist to rescue him from the cellar. Later on he was medevac to Haima hospital by PDO ambulance for further treatment. Your learning from this incident.. Use proper equipment to removal heavy structure (i.e. cellar grating frames) TBT for every job no matter it is routine or a simple job Don’t be complacent in routine jobs Photo explaining what was done wrong Photo explaining how it should be done right No Removal of cellar frames by hands

ATE, Asset Damage – Fire incident, 05 Jun 2016 Management self audit ATE, Asset Damage – Fire incident, 05 Jun 2016 Date: 27.10.2016 PDO – LTI #37 As a learning from this incident and to ensure continual improvement all contract managers must review their HSE HEMP against the questions asked below Confirm the following: Do you have appropriate competency procedure for your workforce? e.g. work instruction to reopen a well after well Work over's. Do your HEMP (TRIC) contains all Hazards & Controls associated with the task? Are all personnel involved in the assigned activity briefed with Hazards and Controls? Do your operators evaluate the risks prior to the commencement of their tasks? Are your operator s have sufficient & appropriate resources to perform a given task safely? Make a list of closed questions (only ‘yes’ or ‘no’ as an answer) to ask other contractors if they have the same issues based on the management or HSE-MS failings or shortfalls identified in the investigation. Pretend you have to audit other companies to see if they could have the same issues.