Construction and Commissioning of Electronic Test Benches

Slides:



Advertisements
Similar presentations
Final Design of a CW Radio-Frequency Quadrupole (RFQ) for the Project X Injector Experiment (PXIE)* Abstract: The Project X Injector Experiment (PXIE)
Advertisements

Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
Areal RF Station A. Vardanyan RF System The AREAL RF system will consist of 3 RF stations: Each RF station has a 1 klystron, and HV modulator,
MICE Refurbishment of CERN RF equipment for MICE M. Vretenar, CERN AB/RF.
بسم الله الرحمن الرحیم MODULATOR & POWER SUPPLY FOR HIGH POWER MICROWAVE TUBE IN LINAC ACCELERATOR.
1.0 MW / 175 MHz Source for IFMIF: a study of alternatives
DC Power Sources for the High Power RF Amplifiers By Rolf Wedberg Review ESS Spoke RF Source 11 – 12 December 2012.
Potential improvements of the PS 10 MHz cavities driving amplifier G. Favia Acknowledgments: V. Desquiens, F. Di Lorenzo S. Energico, M. Morvillo, C.
Development of Solid State Long Pulse Klystron Modulators
CERN 29 Jan 2008 Power Converters for Linac 4 - Carlos A. Martins1 Power Converters for Linac 4 2 Hz) Carlos A. MARTINS Accelerators and Beams (AB)
Digital measurement system for the LHC klystron high voltage modulator D. Valuch, A. Mikkelsen, G. Ravida, O. Brunner.
Front End Test Stand Klystron Commissioning Alan Letchford UKNF Plenary Meeting 22 nd April 2009.
An Assessment on Klystron Modulator Topologies for the ESS Project Carlos A. Martins (*), Karin Rathsman(**) (*) – Laval University, Dept. Electrical and.
POWER PLANT USED IN TELECOM
Proton Linac, Workshop, December 3 rd - 4 th, 2007 The FAIR Proton Linac Outline Requirements to Proton Linac Source, RFQ, DTL, RF Beam Dynamics.
LINAC4 STATUS Alessandra M. Lombardi for the LINAC4 team 1.Motivation and goals 2.Status of Linac4 2 years after official start of the project ( )
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
8 Channel Fiber Optically Linked Data Acquisition System for Booster Modulators Tsatsu Nyamadi Norfolk State University Supervisor Rene Padilla Fermilab.
CERN ISOLDE / HIE ISOLDE 1 Isolde Target Modulator Prototype development prepared by T. Gharsa TE-ABT-EC CERN.
High Power RF Systems, Control and Distribution in the HINS Alfred Moretti, Brian Chase, Chris Jensen and Peter Prieto Fermilab Accelerator Advisory Committee.
Klystron Modulator for Proton Driver
Electrical & Control Power Supplies Trevor Hartnett.
David Regidor, Moisés Weber (CIEMAT, Madrid, Spain) The IFMIF-EVEDA Accelerator Prototype will be a 9MeV, 125mA CW deuteron accelerator to validate the.
February 17-18, 2010 R&D ERL Alex Zaltsman R&D ERL High Power RF Systems Alex Zaltsman February 17-18, 2010 High Power RF Systems.
Neutrino Factory Workshop, IOP, 28th October 2003 RF Systems David M Wilcox.
RF Sources and Combiners Emma Wooldridge. 28th-29th April 2004Joint Accelerator Workshop Outline Very quick RF power overview RF power sources –Triodes.
Anders Sunesson RF Group ESS Accelerator Division
Power Supply System for DRFS
MICE RF System Power Supplies, Control and Monitoring Status report February 2012 Chris White, STFC Daresbury Laboratory MICE Collaboration Meeting CM32,
Kévin Pepitone 1CLIC project meeting, CERN, December 1st, 2015 Kevin PEPITONE, BE-RF Drive Beam Injector Gun.
RF scheme of electron linear accelerator with energy MeV Levichev A.E. Budker Institute of Nuclear Physics SB RAS.
Commissioning of the ALBA IOT-Transmitters Paco Sanchez - 14th ESLS RF - ELETTRA, September Paco Sanchez, RF Group, CELLS (Consortium for.
ALBA RF Amplifiers based on IOTs CWRF08 - CERN, March 2008 Michel Langlois & Paco Sanchez 1 Michel Langlois & Paco Sanchez.
Comparison of Fermilab Proton Driver to Suggested Energy Amplifier Linac Bob Webber April 13, 2007.
ESS Linac Modifications for ESSnuSB Dave McGinnis Chief Engineer / Accelerator Division August 27, 2014.
ESS Spoke Linac section RF Anders Sunesson, RF group leader Rutambhara Yogi ESS Carlos Martins ESS Roger Ruber FREIA.
Kévin Pepitone 1CLIC workshop, CERN, January 2016 Kevin PEPITONE, BE-RF LEETCHI: Drive Beam Electron Source.
Long Pulse Klystron Modulators SML (Stacked Multi-Level) topology
ISIS OPTIMVS NEVTRONVM SPALLATIONENSIVM FONS MVNDI ISIS Developments David Findlay Accelerator Division ISIS Department Rutherford Appleton Laboratory.
New prototype modulator for the European XFEL Project (DESY) Pulse Step Modulator (PSM) Technology for long pulse applications.
High Voltage modulators ESS developments Carlos A. Martins ESS Accelerator Division, RF electrical power systems.
Powering The RHIC EBIS at BNL (And a few words on other new projects within the Collider –Accelerator Dept.) Bob Lambiase 16 June 2019.
ESS Linac Upgrade Dave McGinnis Chief Engineer / Accelerator Division May 27, 2014.
High Power RF Systems for 2-8 GeV Fast Cycling Synchrotron PROJECT X (ICD-2) John Reid September 11, 2009.
CERN LHC RF Power Systems
Carlos A. Martins ESS – Accelerator Division - RF Electrical Power Systems May 16 th, 2014 Klystron and IOT modulators.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
In House RF Power Option John Reid December 14, 2011.
ISIS OPTIMVS NEVTRONVM SPALLATIONENSIVM FONS MVNDI
Status of the ELETTRA RF Plants
Report Technical Director Storage-Ring-Installation Completed
Areal RF Station A. Vardanyan
Switched-mode power supply charger
High Efficiency Klystron
Present and possible future schemes for hadron therapy linacs Alberto Degiovanni for the ADAM team HG2017 Workshop , Valencia.
MICE RF System Power Supplies, Control and Monitoring Status report
RF Sources and Combiners
Development of a Marx-Generator for the drive beam electron gun
E4 hall technical specifications
Construction and Commissioning of Electronic Test Benches
TE/EPC activities for LINAC 2, PSB, PS & TT2 during EYETS
352MHz Klystron Control for the 3MeV Linac test stand
PS System for DRFS PS System for Diode-type klystrons
BEPCII RF POWER SOURCE AND INPUT COUPLER
IFMIF-EVEDA RF POWER SYSTEM
Klystron Power Supplies for ILC
One quarter of RFQ vessel + vacuum pumps and supports
ISIS OPTIMVS NEVTRONVM SPALLATIONENSIVM FONS MVNDI
Status and New Developments of ALBA RF Systems
IOT operation in the SPS Long term experience TWC 800 MHz
Presentation transcript:

Construction and Commissioning of Electronic Test Benches Medical RFQ 28th November 2016, 3th Workshop of the Spanish Traineeship Program FTEC 2015 28th November 2016, 3th Workshop of the Spanish Traineeship Program FTEC 2015 Medical RFQ eric.montesinos@cern.ch , CERN-BE-RF-PM frederic.killing@cern.ch, CERN-BE-RF-PM josue.rodriguez.diez@cern.ch, CERN-BE-RF-PM

Index Overview My work Status Future 28th November 2016, 3th Workshop of the Spanish Traineeship Program FTEC 2015 Medical RFQ eric.montesinos@cern.ch , CERN-BE-RF-PM frederic.killing@cern.ch, CERN-BE-RF-PM josue.rodriguez.diez@cern.ch, CERN-BE-RF-PM

Overview Constructing a compact 750 MHz Radio Frequency Quadrupole It can accelerate a proton beam to 5 MeV in a lenght of 2 meters It is divided into 4 standardized modules of 500 mm RF power sources: 4 IOT (Inductive Output Tubes) HV-DC POWER SUPPLY CAPACITOR RF ON/OFF Drivers IOT HV Capacitor Charger Capacitor Bank Water Air 16A 200Hz 20µs Filament Focus Grid Ion Pump LVPS Control PLCs 28th November 2016, 3th Workshop of the Spanish Traineeship Program FTEC 2015 Medical RFQ eric.montesinos@cern.ch , CERN-BE-RF-PM frederic.killing@cern.ch, CERN-BE-RF-PM josue.rodriguez.diez@cern.ch, CERN-BE-RF-PM

Overview ) Anode: Close to GND Focus PS Capacitor Charger / HVPS IOT: Inductive Output Tube Anode: Close to GND Focus PS INPUT RF e- OUTPUT RF Capacitor Charger / HVPS Capacitor e- e- e- Grid PS ) Cathode: -40 kV DC Ion Pump PS Filament PS 28th November 2016, 3th Workshop of the Spanish Traineeship Program FTEC 2015 Medical RFQ eric.montesinos@cern.ch , CERN-BE-RF-PM frederic.killing@cern.ch, CERN-BE-RF-PM josue.rodriguez.diez@cern.ch, CERN-BE-RF-PM

My work R + // C Low-Pass Filter Desing and Simulation R + // C Low-Pass Filter Modify Resistance and Capacitor values Control Cards Body Current Card RFQ Medical 200 Hz – 20 µs Electrosys System 43 kHz et 127 kHz MATLAB 28th November 2016, 3th Workshop of the Spanish Traineeship Program FTEC 2015 Medical RFQ eric.montesinos@cern.ch , CERN-BE-RF-PM frederic.killing@cern.ch, CERN-BE-RF-PM josue.rodriguez.diez@cern.ch, CERN-BE-RF-PM

My work Assembly and Connection IOT Tube Flow Meters, Sensors… Key Lock & Ground Swith Systems New Ion Pump Power Supplies 4 kV DC Full Wave Rectifier 28th November 2016, 3th Workshop of the Spanish Traineeship Program FTEC 2015 Medical RFQ eric.montesinos@cern.ch , CERN-BE-RF-PM frederic.killing@cern.ch, CERN-BE-RF-PM josue.rodriguez.diez@cern.ch, CERN-BE-RF-PM

My work Test HV Test: Isolation Level, HV Measurements… 28th November 2016, 3th Workshop of the Spanish Traineeship Program FTEC 2015 Medical RFQ eric.montesinos@cern.ch , CERN-BE-RF-PM frederic.killing@cern.ch, CERN-BE-RF-PM josue.rodriguez.diez@cern.ch, CERN-BE-RF-PM

My work RFQ Drivers 28th November 2016, 3th Workshop of the Spanish Traineeship Program FTEC 2015 Medical RFQ eric.montesinos@cern.ch , CERN-BE-RF-PM frederic.killing@cern.ch, CERN-BE-RF-PM josue.rodriguez.diez@cern.ch, CERN-BE-RF-PM

My work 28th November 2016, 3th Workshop of the Spanish Traineeship Program FTEC 2015 Medical RFQ eric.montesinos@cern.ch , CERN-BE-RF-PM frederic.killing@cern.ch, CERN-BE-RF-PM josue.rodriguez.diez@cern.ch, CERN-BE-RF-PM

My work Test Isolation Problem HV & Other Tests 28th November 2016, 3th Workshop of the Spanish Traineeship Program FTEC 2015 Medical RFQ eric.montesinos@cern.ch , CERN-BE-RF-PM frederic.killing@cern.ch, CERN-BE-RF-PM josue.rodriguez.diez@cern.ch, CERN-BE-RF-PM

My work LVPS Problem Isolation Control Parts Everything -40 kV DC ISOLATION TRANSFORMER 230/230 V, 15 kVA, 60 kV DC LVPS Problem Isolation Control Parts Everything -40 kV DC Reference Output Protection Cards 28th November 2016, 3th Workshop of the Spanish Traineeship Program FTEC 2015 Medical RFQ eric.montesinos@cern.ch , CERN-BE-RF-PM frederic.killing@cern.ch, CERN-BE-RF-PM josue.rodriguez.diez@cern.ch, CERN-BE-RF-PM

My work LVPS Only Output Floating System -40 kV DC Reference TVS ISOLATION TRANSFORMER 230/230 V, 15 kVA, 60 kV DC LVPS Floating System Only Output -40 kV DC Reference TVS Improve Protection Cards 28th November 2016, 3th Workshop of the Spanish Traineeship Program FTEC 2015 Medical RFQ eric.montesinos@cern.ch , CERN-BE-RF-PM frederic.killing@cern.ch, CERN-BE-RF-PM josue.rodriguez.diez@cern.ch, CERN-BE-RF-PM

Status Now 14.11 21.11 28.11 05.12 12.12 19.12 RF Conditioning Nominal Power: 400 kW 210 kW > 50 % Nominal Power Improving Test Bench Now Improvements: HV Plastic Rack, New Power Supplies, PLC Control, Cables, Connections… 28th November 2016, 3th Workshop of the Spanish Traineeship Program FTEC 2015 Medical RFQ eric.montesinos@cern.ch , CERN-BE-RF-PM frederic.killing@cern.ch, CERN-BE-RF-PM josue.rodriguez.diez@cern.ch, CERN-BE-RF-PM

Future Improving and Commissioning of Medical RFQ Test Bench Documentation of Medical RFQ Test Bench Optional Tasks Electrosys System @800 MHz, Philips & Siemens @200 MHz Crab Cavity and MB-IOT Test Bench 28th November 2016, 3th Workshop of the Spanish Traineeship Program FTEC 2015 Medical RFQ eric.montesinos@cern.ch , CERN-BE-RF-PM frederic.killing@cern.ch, CERN-BE-RF-PM josue.rodriguez.diez@cern.ch, CERN-BE-RF-PM

Construction and Commissioning of Electronic Test Benches Medical RFQ 28th November 2016, 3th Workshop of the Spanish Traineeship Program FTEC 2015 28th November 2016, 3th Workshop of the Spanish Traineeship Program FTEC 2015 Medical RFQ eric.montesinos@cern.ch , CERN-BE-RF-PM frederic.killing@cern.ch, CERN-BE-RF-PM josue.rodriguez.diez@cern.ch, CERN-BE-RF-PM