Analysis of capacity on double-track railway lines

Slides:



Advertisements
Similar presentations
Design and performance analysis of the Real-Time HCCA
Advertisements

Capacity Studies on Transportation Network Presented by Rakesh Ambre ( ) Under Guidance Of Prof. Narayan Rangaraj.
RELATION BETWEEN DEMAND AFTER TRAIN PATHS AND CAPACITY OF RAILWAY TRANSPORT INFRASTRUCTURE Ing. Josef Bulíček, Ph.D. Ing. Lukáš Fiala University of Pardubice,
L’Infra, une activité au cœur de la SNCF INFRASTRUCTURE French Highspeed on South East TGV line: 25 years of evolution Jean-Paul BALENSI Vice-president.
Meeting AECOM, AM SOP-T, CFR, JASPERS
1 February 2009 Analysis of capacity on double-track railway lines Olov Lindfeldt February 2008.
Computational Modelling of Road Traffic SS Computational Project by David Clarke Supervisor Mauro Ferreira - Merging Two Roads into One As economies grow.
Speed, Velocity, and Acceleration
Quadratic Programming Model for Optimizing Demand-responsive Transit Timetables Huimin Niu Professor and Dean of Traffic and Transportation School Lanzhou.
Platzhalter für Bild, Bild auf Titelfolie hinter das Logo einsetzen Ann Melissa Campbell, Jan Fabian Ehmke 2013 Service Management and Science Forum Decision.
Applications of Evolutionary Algorithms Michael J. Watts
Computational Experiments Algorithm run on a Pentium IV 2.4 GHz Instances from “Rete Ferroviaria Italiana” For each station: - minimum interval between.
Anders Peterson Fahimeh Khoshniyat Dept. of Science and Technology Linköping University, Norrköping, Sweden 6 th May 2014 Effects of Travel Time Dependent.
Trucks on Motorways in the Netherlands A survey of the role of trucks in traffic flow AVV Transport Research Centre Ministry of Transport Onno Tool
Boltzmann Machine (BM) (§6.4) Hopfield model + hidden nodes + simulated annealing BM Architecture –a set of visible nodes: nodes can be accessed from outside.
Kostas Kolomvatsos, Kakia Panagidi, Stathes Hadjiefthymiades Pervasive Computing Research Group ( Department of Informatics and.
Railway Operations: Issues and Objectives Capacity management Infrastructure planning Timetable preparation Management of day-to-day movement of trains.
Materials developed by K. Watkins, J. LaMondia and C. Brakewood Timetabling Components Unit 5: Staff & Fleet Scheduling.
HŽ Passenger Transport – overviewBUCHAREST HŽ PASSENGER TRANSPORT.
Hamed Pouryousef ; Pasi Lautala, Ph.D, P.E. Hamed Pouryousef ; Pasi Lautala, Ph.D, P.E. Michigan Tech. University Michigan Tech. University PhD Candidate.
Berlin, December 11 th 2012 Faculty of Mechanical Engineering · Chair of Logistics Engineering Network Optimization prior to Dynamic Simulation of AMHS.
Q/.r NSRZKLA4-P1 Timetable planning Leo Kroon Sept 9, 2003.
A stochastic scheduling algorithm for precedence constrained tasks on Grid Future Generation Computer Systems (2011) Xiaoyong Tang, Kenli Li, Guiping Liao,
Initial proposals for the promotion of eco-mobility in the Austro-Hungarian border region EMAH project Álmos VIRÁG, project leader.
WLTP-DHC Analysis of in-use driving behaviour data, influence of different parameters By Heinz Steven
Kanok Boriboonsomsin, Guoyuan Wu, Peng Hao, and Matthew Barth
in Croatian Track access charging system
Lars Abrahamsson Department of Electric Power Systems (EPS)
Simulation of mixed traffic on a railway section
High Speed Rail Some Development Principles
Public Conference December
RAILWAY INDUSTRY TRAIN PLANNING LEVEL 2 TRAINING
Authors: Jiang Xie, Ian F. Akyildiz
IRSC 2005 Cape Town - South Africa 9 – 14 october 2005
Management of Earthquake Risk using Condition Indicators Determination of vulnerability functions Jens Ulfkjaer.
Safety of Train Traffic in Time of Strike
Lorenzo Ros Mª Victoria de la Fuente Norina Szander
Track circuit reliability assessment for preventing railway accidents
SOUTHERN TAIWAN UNIVERSITY ELECTRICAL ENGINEERING DEPARTMENT
Visit for more Learning Resources
Traffic Simulator Calibration
Light rail projects in Denmark
Macroscopic Speed Characteristics
MINING HISTORICAL DELAY DATA IN RAILWAYS
Speed, Distance, Time Calculations
Optimizing depot locations based on a public transportation timetable
1 Department of Engineering, 2 Department of Mathematics,
CLEAR Graz Stefan Hausberger, Nikolaus Furian
Rail transport statistics developments Agenda Item 4.1
1 Department of Engineering, 2 Department of Mathematics,
Transit Signal Priority: The Importance of AVL Data
1 Department of Engineering, 2 Department of Mathematics,
Analysis of the WLTP EU in-use database with respect to RDE-like trips, update of the presentation from by H. Steven , modified
Analysis of the WLTP EU in-use database with respect to RDE-like trips, update and summary of previous presentations by H. Steven
Analysis of the WLTP EU in-use database with respect to RDE-like trips, update of the presentation from by H. Steven
Analysis of the WLTP EU in-use database with respect to RDE-like trips, update of the presentation from by H. Steven , modified
A car is decelerated to 20 m/s in 6 seconds
Boltzmann Machine (BM) (§6.4)
Speed, Distance, Time Calculations
Safety Distance to the front
Speed, Distance, Time Calculations
WLTP Comparison of WLTP unified database distributions and WLTC rev2 distributions Heinz Steven
Speed, Distance, Time Calculations
All pupils can recall information on real life graphs
Speed, Distance, Time Calculations
Towards Suistanable Development - TSD 2018
A section-based queueing-theoretical traffic model for congestion and travel time analysis in networks Sandro Huber
SIGHT DISTANCE Spring 2019.
Railway timetabling tools with automatic solutions
Speed, Distance, Time Calculations
Presentation transcript:

Analysis of capacity on double-track railway lines Olov Lindfeldt February 2008

Disposition Introduction – freight capacity question TVEM (model) Infrastructure modeling Application - Three-pattern case Conclusions

Freight capacity question What is the capacity for freight traffic on existing lines if high speed lines are constructed? It depends on the timetable! Ways to find the timetable for 2050: Assume one Make more general assumptions an generate a large number of timetables Develop an algorithm that generates timetables and evaluate freight capacity as a distribution… Disregard disturbances (delays)

Freight capacity question What is the capacity for freight traffic on existing lines if high speed lines are constructed? It depends on the timetable! Ways to find the timetable for 2050: Assume one Make more general assumptions an generate a large number of timetables Develop an algorithm that generates timetables and evaluate freight capacity as a distribution… Disregard disturbances (delays)

Freight capacity question What is the capacity for freight traffic on existing lines if high speed lines are constructed? It depends on the timetable! Ways to find the timetable for 2050: Assume one Make more general assumptions and generate a large number of timetables Develop an algorithm that generates timetables and evaluate freight capacity as a distribution… Disregard disturbances (delays)

Freight capacity question What is the capacity for freight traffic on existing lines if high speed lines are constructed? It depends on the timetable! Ways to find the timetable for 2050: Assume one Make more general assumptions and generate a large number of timetables Develop an algorithm that generates timetables and evaluate freight capacity as a distribution… Disregard disturbances (delays)

Research view Aim How do the infrastructure and the timetable affect capacity? Method Combinatorial analysis of infrastructure designs and timetable structures.  TVEM: Timetable Variant Evaluation Model

TVEM: Assumptions Passenger traffic operated with a periodic timetable Train patterns All patterns are scheduled according to a priority order. A train with higher priority is never given scheduled delay for a train with lower priority.

TVEM: Structure

TVEM: Variables Run times between overtaking stations (infrastructure + vehicle) Deceleration and acceleration supplements (for overtaking situations) Regular stops Track dispositions at stations Frequency of service Scheduling order

TVEM: Calculation scheme Periodic timetable  train patterns Scheduling order for train patterns Time step: 1 minute Last pattern: as many freight trains as possible

Infrastructure modelling (1/2) Real distribution for inter-station distance. Fitted Weibull distribution (M-L). Mean: 22,7 km Std: 109 km2.

Infrastructure modelling (2/2) Effect of additional overtaking stations? Halve the greatest distance repeatedly.  relationship between parameters

Application: Three-pattern case High-speed, regional and freight trains Mean number of trains (capacity): Two speed combinations - 160/115 km/h (dotted) - 210/160 km/h (solid) Two infrastructure layouts. Inter-station distance: - mean 22 km (lower) - mean 17 km (upper)

Conclusions Combinatorial / deterministic approach  TVEM Infrastructure treated as a variable. Modeled stochastically (replications) Regular passenger timetable  train pattern  combinatorial timetable analysis Evaluation: mean capacity, variance caused by: Infrastructure Timetable

Thank You for the attention! Number of freight trains/h