NPRR829 Incorporate Real-Time Telemetered Net Generation for Non-Modeled Generation into the Real-Time Liability Estimate ERCOT PRS Meeting May 11, 2017.

Slides:



Advertisements
Similar presentations
1 Revisions to M2 and RT Final Component of UFTA CWG/MCWG ERCOT Public January 22, 2014.
Advertisements

NPRR 206 DAM Credit Requirements Reduction: E Values and Percentiles Luminant Proposal.
Credit Updates Vanessa Spells Credit Work Group ERCOT Public
Seasonal Adjustment Factor Discussion Technical Advisory Committee
NPRR Proposed Changes TPTF Meeting 26 Aug 2008.
MCWG Update to WMS Loretta Martin LCRA, Chair Josephine Wan AE, Vice Chair 03/05/
Next Steps to Reduce the RTM Settlement Timeline August 29, 2013 COPS Workshop Update to TAC Harika Basaran COPS Chair September 5, 2013.
September 2012 Proposed CRR Auction Credit Changes: Summary of Draft NPRR.
Grabbing Balancing Up Load (BUL) by the Horns December 2006.
Market Credit Working Group update to the Wholesale Market Subcommittee 06/03/
MCWG Update to WMS 5/11/ Exposure / Collateral Update Nodal Total Potential Exposure reported by ERCOT as of 4/30/11 remains less than Zonal Estimated.
Nodal Settlement Delta Calculations and Statements – 7/11/06 Workshop  Objective: Describe design concepts of nodal settlement delta calculations and.
Nodal Program Update and SEWG Update COPS 1/11/2011 Jim Galvin.
Mandy Bauld ERCOT October 9, 2012 RTM SETTLEMENT TIMELINE.
Nodal Credit Monitoring and Management – Business Requirements ERCOT CREDIT Department October 11, 2006.
1 Draft NPRR – Revisions to Certain Price Components of EAL CWG/MCWG ERCOT Public January 22, 2014.
MCWG Update to WMS 08/14/2013. MCWG Update to WMS General Update -July 31 st Joint MCWG/CWG Meeting Review NPRRs All operational except – NPRR 552 – Additional.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations May 8, 2012 – COPS Meeting May 9, 2012 – WMS.
Transmission Congestion Rights – Credit Perspective April 17, 2014.
DAM Overview: Processes & Tools in the DAM Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) April 2, 2008.
Credit Updates Vanessa Spells Credit Work Group ERCOT Public February 18, 2015.
Commercial Operations Subcommittee Update to TAC September 7, 2012 Harika Basaran, COPS Chair 2012 Jim Lee, COPS Vice Chair 2012.
1 Next Steps to Reduce the RTM Settlement Timeline COPS Workshop August 29, 2013 Mandy Bauld ERCOT Director, Settlement & Retail Operations (512)
January 7, 2011 Review Nodal Exposure / Collateral as of end of December, 2010 Cheryl Yager.
MCWG Update to WMS 11/13/2013. MCWG Update to WMS General Update - October 30 th Joint MCWG/CWG Meeting Review September 25 Meeting Minutes - Approved.
The credit exposure impact of higher system-wide offer caps was estimated using an internal ERCOT model under four scenarios: 1.(Base Case) “Normal” summer.
M2:Shortened RTM Settlement Timeline Vanessa Spells CWG/MCWG Meeting April 24, 2013.
Credit Updates Vanessa Spells Credit Work Group ERCOT Public December 16, 2015.
1 Nodal Credit Update at WMS June 16, 2010.
November 27, 2012 NPRR322, Real-Time PTP Option Modeling Implementation Overview.
Total Potential Exposure (TPE) Overview Credit Work Group May 28, 2008 Cheryl Yager.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
1 Nodal Day Ahead Invoice Taskforce Update COPS, May 8, 2007.
MCWG Update to WMS 2/9/2010. Agenda Items Exposure / Collateral Status Update 1/26 MCWG/CWG Joint Meeting – Potential NPRR to enable expiring CRRs to.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations June 27, 2012 – ETWG Meeting.
DAM and Nodal Collateral Requirements Concerns and Solutions December 7, 2009.
Nodal Credit Monitoring and Management – Business Requirements ERCOT CREDIT Department September 28, 2006.
Day-Ahead Market Discussion/Clarification TPTF April 24, 2006.
1 NPRR638 (Seasonality) Back-Cast Results CWG/MCWG Suresh Pabbisetty, ERP, CQF, CSQA. ERCOT Public October 3, 2014.
Project Funding Review February 7, Background ERCOT has a $15M project budget in 2013 (same as 2012) –To allow for new additions to the.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Update on TPTF Comments on MMS Clarification Notes May 21,
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes November 12, 2008 VCWG Meeting.
Money Transfer Due to Real-Time Irresolvable Constraint Resmi Surendran ERCOT.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations November 2, 2012 – RCWG Meeting.
Credit Updates Vanessa Spells Credit Work Group ERCOT Public May 18, 2016.
Day Ahead Market QSE’s Credit Requirements Concerns and Solutions August 14, 2008.
Initial Estimated Liability (IEL)
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Settlement Statements and Calendar Business Requirements Settlements.
Commercial Operations Subcommittee (COPS) Update to TAC 4/28/2016
Nodal RTM Settlement Timeline Snapshot Timing for Load and Gen Data (Follow-Up) Mandy Bauld COPS November 10, 2009.
CRR Deration and NPRR821 WMS 09/06/2017.
Credit Reports Vanessa Spells COPS Meeting ERCOT Public
CMM Tech Refresh Project Update
Principal Load Profiling and Modeling
Nodal Program Update to Cops
2017 Seasonal Adjustment Factors
Protocol Revision Subcommittee
Exceptional Fuel Costs in LMP
DALE MCWG / CWG 3/10/2010.
Market Continuity Update to TAC Joel Mickey
Credit Updates Vanessa Spells Credit Work Group ERCOT Public
NPRRs 815NPRR Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service.  This Nodal Protocol Revision Request (NPRR) revises.
Ancillary Service Trades and Ancillary Service Settlement
Real-Time Co-optimization of Energy & Ancillary Services
TAC Report to the ERCOT Board
CMM Tech Refresh Project
Reflecting Losses in DR within ERCOT August 22, 2012
Energy Storage Settlements Consistent with PUCT Project & NPRR461
TSC Modifications Panel Meeting
Mod_38_18 Limitation of Capacity Market Difference Payments to Loss Adjusted Metered Quantity. 12th December 2018.
Presentation transcript:

NPRR829 Incorporate Real-Time Telemetered Net Generation for Non-Modeled Generation into the Real-Time Liability Estimate ERCOT PRS Meeting May 11, 2017 Enchanted Rock Ltd

NPRR Business Case Currently it is difficult for non-modeled generation to hedge in the DA market due to potential superfluous collateral calls during high priced RT market events. Using telemetered data from non-modeled generation will allow ERCOT to more accurately calculate QSE collateral requirements. This NPPR will increase DA market liquidity due to increased participation of non-modeled generation in the DA market. Implementing this NPRR has the potential to allow ERCOT to gain near real- time transparency into non-modeled generation which could increase their ability in analyzing real-time system conditions. Furthermore, ERCOT will better understand the true position of the QSE by operating day and will also better understand their cash flow.

IDR Meter Challenge IDR Meters are read once a month. As a result: Payments for energy aren’t received until the Final Statement 55 days after the operating day A large part of calculating collateral calls stems from Invoice timing ERCOT therefore does not know the true position of a QSE for a given operating day until the IDR Meter Data is submitted to them from the TDSP (once a month) NPRR753 is related to this NPRR If the TDSP’s were to incorporate the AMS daily-read system for IDR’s, the process would have the potential to reduce or minimize collateral requirements

Day-Ahead Market Example QSE offers 2 MW On-Peak (HE0700-HE2200) in DAM Awarded - $40/MWH Energy Price in all 16 hours DA On-Peak Average $40/MWH, ($40 x 16hrs) / 16hrs 32 Total MWH’s offered in (2MW x 16hrs) Real Time Prices Spikes to $1000/MWH for 4 Hours QSE Strike Price ($100) – means non-modeled gen will run whenever SPP above $100 Balance On-Peak hours average $40/MWH Overall RT On-Peak Average $280/MWH, (($1000 x 4hrs) + ($40 x 12hrs)) / 16hrs Collateral Call QSE owes ($40 - $280) * 32 = -$7,680 This collateral call would come in 7 days and would be the average of the previous 14 days Real Time Energy Revenue QSE generates: 2 MW * 4 hours * $1000 = $8,000 Money wouldn’t be paid until final statement – 55 days later True Position for the day is therefore positive $320 Telemetry would be used to show this and thus reduce collateral call

NPRR Revision Description This NPRR provides a mechanism for a QSE with Non-Modeled generation to inform ERCOT in a timely manner the net generation to the ERCOT grid from their Non-Modeled generators so that the output can be considered in the credit calculation. Per the previous example, the QSE would supply data to ERCOT so they could subtract the $8000 from the $7,680 and eliminate or decrease any sort of collateral call

NPRR Language Change Operational Data Requirements 6.5.5.2.(12) A QSE representing Non-Modeled generation may provide Real-Time telemetry of the net generation of those Non-Modeled generators for the purpose of having that net generation included in the Real-Time Liability Estimate.

NPRR Language Change Real-Time Liability Estimate 16.11.4.3.2 (1) ERCOT shall estimate RTL for an Operating Day as the sum of estimates for the following RTM Settlement charges and payments: (b) Section 6.6.3.2, Real-Time Energy Imbalance Payment or Charge at a Load Zone, using 14 day or seven day old LRS for Load estimate and actual metered generation or net telemetry as the generation estimate;

Collateral Calculation TPEA = Max [0, MCE, Max [0,EAL]] + PUL EAL = Estimated Aggregate Liability based on estimates and invoiced activity MCE = Minimum Current Exposure based on invoiced activity Total Potential Exposure Any (TPEA) reflects exposure related to Real-Time and Day Ahead Market (DAM) activity Currently the credit calculation doesn’t account for Non-Modeled Generation in the Real Time estimates or in the Initial settlements invoices. The Non- Modeled Generation is captured in the credit calculation once it is invoiced in the Final settlement invoices. By adding Telemetry, the EAL and MCE components will take into consideration the generation that offsets the load in a more timely manner.

Collateral Calculation Several of the Real-Time estimated and invoiced components of the credit calculation will be impacted by the proposed change A component will be needed to capture Non-Modeled generation in the credit calculation: TWTGnmg - (Time-Weighted Telemetered Generation) ERTMGVOLQDTOTLZ - (Estimated Real-Time Metered Generation Volume QSE Daily Total for all Load Zone DG net generation)