Status of the Planning Working Group’s (PWG) Efforts

Slides:



Advertisements
Similar presentations
1 April 2010 TX SET Timeline Project Conceptualization 11 weeks Market Requirements 12 weeks ERCOT Requirements 12 weeks Conceptual Design 6 weeks Detail.
Advertisements

111 TAG Meeting June 8, 2015 Teleconference / Webinar FINAL.
Report on the NCTPC 2006 Collaborative Transmission Plan Mark Byrd, Manager – Transmission Planning Progress Energy Carolinas, Inc January 25, 2007.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
1 Transmission Advisory Group Meeting January 25, 2007 Raleigh, NC.
Sacramento Local Agency Formation Commission (LAFCo) UPDATE ON PROPOSED SMUD ANNEXATION Presented to Yolo LAFCo September 19, 2005.
Transmission Planning at the California ISO September 10, 2015.
Briefing to the Central Valley Flood Protection Board June 28, 2013 Status of State-Led Basin-Wide Feasibility Studies.
Base Plan Development Overview 2007 Transmission Summit July 31, 2007 New Orleans, Louisiana.
Generation Adequacy Task Force Update to WMS November 18, 2009.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
© Nano Time Limited – October 2008 Source Planning What –Analytical process that for creating procurement and supply strategies for key categories Wh y.
1 TAG Meeting May 9, 2008 NCEMC Office Raleigh, NC.
Coordinated Planning Concept (For Discussion Only) revised 11/30/04 07/01/04.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
Transmission Advisory Group NCTPC Process Update Rich Wodyka September 7, 2006.
2006 Preliminary Reliability Study Results Bryan Guy September 7, 2006.
DRAFT – FOR DISCUSSION PURPOSES ONLY © 2013 New York Independent System Operator, Inc. All Rights Reserved. EIPC Roll-Up Powerflow Model Zach Smith Director,
Proposed Market Solution for Bates RMR Exit Strategy Frontera Power Station.
Compare and Contrast Reliability Assumptions Bob Pierce May 12, 2006.
1 North Carolina Transmission Planning Collaborative Overview Clay Norris, Chair OSC October 5, 2005.
Reliability Must Run Workshop RMR Study Process May 24, 2016.
Report to RMS July 14, 2004.
Recommendation of Texas Test Plan Team to RMS
WIND And Solar ENERGY CONVERSION MODEL GUIDELINES Consultation update – September 2016 Presented by Marcelle Gannon.
Compare and Contrast Reliability Assumptions
August ICA Agenda Time Topic 8:00 – 8:15
IT Strategy Roadmap Template
Introductory Remarks and Meeting Goals
Transmission Planning Attachment K Public Input Meeting
Recommendation of Texas Test Plan Team to RMS
M&E Task Force Meeting
Save these dates! October 14, 15 and 16, 2010 ASU Student Union
August LNBA Agenda Time Topic 1:00 – 1:15
SEARUC Conference Little Rock, AR June 4, 2007
Business Practices Subcommittee Update
Department of Environmental Quality
Health Resources and Services Administration (HRSA)

Annex 5: Milestones Action Determine sticker label design / features
Status report / Activity Plan of OBD Task Force
Yearly Maintenance Process (for existing messages)
Portfolio Management Process & Customer Request Management
ESB Networks Market Release Meeting of the IGG, March 5th 2009
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Proposed Strategic Planning Process for FY 2013/14 thru FY 2015/16
PCS Day - Feedback 23th November 2016, Vienna.
Exit Capacity Substitution and Revision
TTA′s Transposing Plan Mar
Prof. dr. Giedrius Vanagas
US TBM Cost Activity Tom Mann December 12 – 14, 2005.
Potential Minor Release Drop 4 Timeline & Scope
Greater Kaweah GSA Board Meeting
PARCA Timeline.

Omnibus IV Contract Overview Elieen Emond Contract Specialist
ETS WG, 30 January-1 February 2006 Agenda Item
Drafting Group: Final Meeting Drafting Group: 1st Meeting
Q1 Q2 Q3 Q4 PRODUCT ROADMAP TITLE Roadmap Tagline MILESTONE MILESTONE
Second Independent Evaluation of UNAIDS
1.

IT Managed Services Transition Weekly Activity Report: May 28th, 2019
Sep Oct Nov Dec Jan Feb Mar Apr May
IT Managed Services Transition Weekly Activity Report: May 14th, 2019
DER Growth Scenarios and Load Forecasts Working Group
XRN 4954 – MiR Drop 5 - Status Update
XRN 4927 – MiR Drop 4 - Status Update
KPI and KVI Review Approach & Plan
Presentation transcript:

Status of the Planning Working Group’s (PWG) Efforts Andrew Fusco May 12, 2006

Agenda Purpose of the PWG 2006 NCTPC process PWG efforts to date Next steps DRAFT

Purpose of the PWG Coordinates the development of the transmission studies to support the NCTPC Establishes a base case model Performs Resource Supply Option studies – focused on reliability Performs Enhanced Access studies – focused on power supply economics Develops cost and schedule estimates DRAFT

NCTPC Process Flowchart PWG evaluates reliability problems and current transmission upgrade plans PWG develops and the OSC approves the reliability study scope PWG coordinates the study analysis, identifies reliability problems, develops solutions with estimates of costs and schedules Participants and TAG recommend scenarios and interfaces. The OSC selects interface and scenario studies for analysis PWG coordinates the study analysis, identifies access problems, develops solutions with estimates of costs and schedules Reliability Planning Enhanced Transmission Access Planning OSC selects reliability and enhanced access solutions; checks for improved reliability through enhanced access solutions OSC creates final draft Collaborative Plan Feedback and Iterative Studies Participants and TAG review the reliability study results Participants’ resource planning processes Participants and TAG review the enhanced access study results TAG feedback on final draft Collaborative Plan OSC approves final Collaborative Plan PWG develops and the OSC approves the enhanced access study scope NCTPC Process Flowchart DRAFT

2006 Overview Schedule DRAFT Reliability Planning Process Develop Reliability Study Scope Perform analysis, identify problems, and develop solutions Review Reliability Study Results Evaluate current reliability problems and transmission upgrade plans Enhanced Access Planning Process Propose and select enhanced access scenarios and interface Develop Enhanced Access Study Scope Perform analysis, identify problems, and develop solutions Review Enhanced Access Study Results Collaborative Plan Development OSC publishes DRAFT Plan TAG review and comment Combine Reliability and Enhanced Results TAG Meetings 1st Quarter 2nd Quarter 3rd Quarter 4th Quarter DRAFT

NCTPC Process Flowchart - REVISED PWG evaluates reliability problems and current transmission upgrade plans PWG develops and the OSC approves the reliability study scope PWG coordinates the study analysis, identifies reliability problems, develops solutions with estimates of costs and schedules Reliability Planning OSC selects reliability and enhanced access solutions; checks for improved reliability through enhanced access solutions OSC creates final draft Collaborative Plan Feedback and Iterative Studies Participants and TAG review the reliability study results Participants’ resource planning processes TAG feedback on final draft Collaborative Plan OSC approves final Collaborative Plan DRAFT

2006 Overview Schedule - REVISED Reliability Planning Process Develop Reliability Study Scope Perform analysis, identify problems, and develop solutions Review Reliability Study Results Evaluate current reliability problems and transmission upgrade plans Collaborative Plan Development Finalize Reliability Results OSC publishes DRAFT Plan TAG review and comment TAG Meetings 1st Quarter 2nd Quarter 3rd Quarter 4th Quarter DRAFT

PWG Efforts to Date First PWG meeting in September 2005 Sept – Dec: Compared reliability planning assumptions used by Duke and PEC Oct – Jan: Developed scope for 2006 reliability study DRAFT

PWG Efforts to Date Dec – Jan: Provided data for base case development Load and resource forecasts Dispatch order for resources Coordinated interchange Contingency and monitored line lists DRAFT

PWG Efforts to Date Jan – Feb: Developed merged detailed base case Feb – Mar: Developed potential alternative resource options for study Mar – Apr: Performed base case and some generator maintenance reliability screenings Apr: Reviewed initial reliability screenings DRAFT

Next Steps Complete studies for Resource Supply Options Identify reliability problems Develop solutions Develop technical solutions Develop cost and schedule estimates for solutions Recommend alternative resource options for study DRAFT