ILC Interaction Region and Machine Detector Interface

Slides:



Advertisements
Similar presentations
SiD Surface assembly Marco Oriunno (SLAC) MDI-CFS Meeting Sep. 4-6, 2014, Ichinoseki (Japan)
Advertisements

Global Design Effort Goals and Introduction Andrei Seryi, SLAC, September 17, 2007.
Global Design Effort Beam Delivery System & Machine Detector Interface Andrei Seryi, SLAC Annual DOE HEP Program Review June 11-14, 2007.
Summary of wg2a (BDS and IR) Deepa Angal-Kalinin, Shigeru Kuroda, Andrei Seryi October 21, 2005.
Global Design Effort Detector concept # Plenary introductory talk IRENG07 Name September 17, 2007.
Experimental hall in Japanese mountain site Y. Sugimoto ILD MDI/Integration 1.
Push Pull Considerations
Global Design Effort Detector concept Plenary introductory talk IRENG07 Kurt Krempetz September 17, 2007.
Beam Delivery System Review of RDR(draft) 1.Overview 2.Beam parameters 3.System description 3.1 diagnostic, tune-up dump, machine protection MPS.
BDS Design Studies John Amann ILC Mechanical Engineering 10/24/06.
November 07, 2006 Global Design Effort 1 Beam Delivery System updates BDS Area leaders Deepa Angal-Kalinin, Hitoshi Yamamoto, Andrei Seryi Valencia GDE.
1 ILD/CMS Engineering Meeting M. Joré – ILD integration philosophy Integration philosophy of ILD Matthieu Joré – January 21st Integration of the subdetectors.
Experimental hall in Japanese mountain site Y. Sugimoto 1.
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
October 13, 2006 Global Design Effort 1 International Linear Collider Machine Detector Interface Materials for discussion at Engineering Forum: experiences.
February 4, 2007 Global Design Effort 1. February 4, 07 Global Design Effort IR&MDI: 2 Contents Will describe design of Beam Delivery System, focusing.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
Beam Commissioning Marco Oriunno (SLAC), May 14, 2014 ALCW 2014, Fermilab Engineering Issues.
Thanks to Andrei for slides October 26, 一般報告 Hitoshi Yamamoto, Oct 26, 2006.
Philip Burrows SiD Meeting, Paris 11/02/081 Machine Detector Interface Issues Philip Burrows John Adams Institute Oxford University Thanks to: Tom Markiewicz.
September 18, 2007H. J. Krebs1 SiD Collaboration One Piece End Door Design Concept plus Forward Equipment Interfaces H. James Krebs SLAC September 18,
Si D in 14mrad/14mrad/z=0 ILC T. Markiewicz/SLAC SiD Advisory Group 14 August 2006.
Global Design Effort Critical Interaction Region Issues, Report from the IR engineering workshop Andrei Seryi, SLAC October 24, 2007.
Global Design Effort ILC Crab Cavity Overview and requirements Andrei Seryi SLAC on behalf of ILC Beam Delivery and Crab-Cavity design teams Joint BNL/US-LARP/CARE-HHH.
October 20, 2006 Global Design Effort 1 ILC Interaction regions : The GDE perspective Talk based on several talks presented by BDS area leaders Andrei.
17 th November, 2008 LCWS08/ILC08 1 BDS optics and minimal machine study Deepa Angal-Kalinin ASTeC & The Cockcroft Institute Daresbury Laboratory.
Date Event Global Design Effort 1 Platform Moved on Hillman Rollers, Deformations John W. Amann ILC – Mechanical Engineering 9/12/07 IREng07.
February 05, 2007 Global Design Effort 1 Beam Delivery System R&D S4 Task Force Chris Damerell, Hitoshi Hayano, Marc Ross Deepa Angal-Kalinin, Andrei Seryi,
BDS: 1 October 13, 2007 BDS KOM EDR planning discussion Andrei Seryi October 13, 2007.
Global Design Effort CLIC-ILC BDS & MDI work Materials for discussion Daniel Schulte, Rogelio Tomas and Emmanuel Tsesmelis for CLIC team Andrei Seryi for.
GLD experimental hall and detector assembly Y.Sugimoto KEK 27 Sep
SiD Collaboration Meeting Highlights Tom Markiewicz/SLAC ILC BDS Meeting 08 May 2007.
An Hybrid QD0 for SID ? Marco Oriunno (SLAC), Nov. 14, 2013 LCWS13, TOKYO.
Philip Burrows MDI Panel Meeting 15/08/06 Philip Burrows John Adams Institute Oxford University SiD and IR/MDI Issues.
FD Movers and Alignment Methods Superconducting Magnet Division, BNL IRENG07 Workshop: September 19, 2007.
SiD MDI Issues Tom Markiewicz/SLAC Beijing ACFA/GDE Meeting 05 February 2007.
IWLC10, 18 th -22 nd October10, CERN/CICG 1 Global Design Effort Updates to ILC RDR Beam Delivery System Deepa Angal-Kalinin & James Jones ASTeC, STFC.
BDS/MDI Deepa Angal-Kalinin Andrei Seryi AD&I Meeting, DESY, May 29, 2009.
MEA Machine and Experiment Assembly Norbert Meyners, MEA 12. July 2007ILC IRENG07 WG-A1 LDC Engineering Design (Status) Introduction General Design Detector.
Philip Burrows SiD Monthly Phone Meeting, 4/10/071 IR Issues from IRENG07 Philip Burrows John Adams Institute Oxford University.
12 July 2007IRENG07 WG-A M. Breidenbach1 SiD Concept SiD is relatively modest in scale compared to the LHC detectors, and comparable to SLD: Tracker Radius.
Implication of gamma-gamma on 14mr tunnels discussion (questions for discussion with WG-C and WG-A) Valery Telnov Budker INP IRENG07, Sept.19, 2007, SLAC.
Octobre LAL Orsay Report from the IRENG07 workshop at SLAC W. Lohmann, DESY from Septembre 17 – 21, ~ 100 participants - plenary and parallel sessions.
Baseline BDS Design Updates Glen White, SLAC Sept. 4, 2014 Ichinoseki, MDI/CFS Meeting.
Design challenges for head-on scheme Deepa Angal-Kalinin Orsay, 19 th October 2006.
Experimental Hall in Mountain Regions
SiD Collaboration Meeting SLAC, December 2011
Yasuhiro Sugimoto 2012/2/1 ILD integration meeting
Experimental hall design in Japanese site
Present status of the flux return yoke design
Extract from: Minimal BDS and other thoughts
BDIR/MDI Summary ECFA Final Plenary
Update of experimental hall in Japanese mountain site
Beam Delivery update Andrei Seryi December 12, 2005
Design Concept Update – Platform Moved on Hillman Rollers
Accelerator and detector requirements specification and optimisation on example of interaction Region BDS Design Team 11-13th October 2007 BDS KOM, SLAC.
Detector hall in mountain regions
Changes to SiD since the DBD
CLIC-ILC BDS & MDI work.
ILC BDS Emittance Diagnostics: Design and Requirements
Radiation Physics requirements for the IR
Updates on IR and FF for super-B factory
SiD IR Layout M. Breidenbach, P. Burrows, T. Markiewicz
Beam Delivery System Schedule at ILC2010
Detector hall in mountain regions
Extract from today’s talk given to DCB
A 12-min Introduction to The ILC Machine Detector Interface and SiD
Push-pull cryo configuration C
IR Beam Transport Status
Some of the Points Raised During my JLAB Visit
Presentation transcript:

ILC Interaction Region and Machine Detector Interface Andrei Seryi, SLAC representing BDS Area leaders Deepa Angal-Kalinin, Andrei Seryi, Hitoshi Yamamoto MDI panel and BDS team February 4, 2007 Global Design Effort

Contents Will describe design of Beam Delivery System, focusing in particular on Machine Detector Interface aspects IR hall and surface buildings Detector assembly Machine background Design of IR and detector IR arrangements for two detectors February 4, 07 Global Design Effort

BDS layout February 4, 07 Global Design Effort

IR hall region February 4, 07 Global Design Effort

BDS beam-line layout Polarimeter BSY Sacrificial collimators b-collim. service tunnel E-collimator Diagnostics FF 14mr IR Tune-up dump 5m E-spectrometer Muon wall Extraction -2.2km February 4, 07 Global Design Effort

BDS optics linac IR Upstream polarimeter; b & E –collimation ; Energy spectrometers are of particular MDI interest February 4, 07 Global Design Effort

BDS parameters February 4, 07 Global Design Effort

On-surface assembly of ILC detectors CMS approach CMS assembly approach: Assembled on the surface in parallel with underground work Allows pre-commissioning before lowering Lowering using dedicated heavy lifting equipment Potential for big time saving Reduces size of required underground hall February 4, 07 Global Design Effort

ILC Underground schedule Earlier version of layout February 4, 07 Global Design Effort

On-surface assembly of ILC detectors Adopted CMS on-surface assembly approach for ILC detector This allows saving more than two years and fitting into the goal of “7years until first beam” and “8years until physics run” CMS assembly and lowering the detectors parts in the hall is presently ongoing, according to the plan Information and images on next pages are courtesy of CERN colleagues Alain Herve, Martin Gastal, et al. February 4, 07 Global Design Effort

CMS Assembly February 4, 07 Global Design Effort

CMS Assembly February 4, 07 Global Design Effort

CMS Assembly February 4, 07 Global Design Effort

CMS Assembly February 4, 07 Global Design Effort

CMS Assembly February 4, 07 Global Design Effort

CMS Assembly February 4, 07 Global Design Effort

CMS Assembly February 4, 07 Global Design Effort

CMS Assembly February 4, 07 Global Design Effort

CMS Assembly February 1. Lowering down a 1200 ton barrel ring. Photo and info courtesy Alain Herve February 4, 07 Global Design Effort

CMS Assembly Lowering down a 1200 ton barrel ring CMS is at half process. Next -- lowering 2kt central barrel by the end of February. Alain Herve February 4, 07 Global Design Effort

Optimization of IR hall and assembly procedure For RDR, discussing possible variations of assembly procedure pure and modified CMS assembly (configs. A and B in the table on next slide) Difference being how large pieces are assembled on surface Present RDR does not intend to finalize all the details for the schedule, hall sizes, capacity of cranes, etc. Optimization will be done in details by BDS, CF&S and Detector concept groups in EDR phase February 4, 07 Global Design Effort

Table of IR assumptions continued … February 4, 07 Global Design Effort

… continued … February 4, 07 Global Design Effort

Included in IR hall and surface buildings: detectors hall of 120x25x39m service cavern 40x15x10m finished civil engineering works, plus movable concrete shielding wall in two parts (on air pads) steel platforms with staircases and all fittings two 1.6t elevators between steel platforms plus two 2.8t in shafts, steel plates on the floor of the Hall one 400t and two 20t overhead cranes in Hall etc… Included in surface assembly building: two assembly buildings 100x25x25m 400t and 20t overhead cranes This choice can suite some detectors better than other (one size does not fit all) and may cause some concerns Further adjustments of IR hall and surface buildings will be done, in close connection with detector colleagues, during EDR phase February 4, 07 Global Design Effort

IR surface area February 4, 07 Global Design Effort

Next slides Will discuss Machine background IR design muons Synchrotron Radiation Beam-gas Extraction line losses IR design Detector Integrated Dipole (DID) Antisolenoids February 4, 07 Global Design Effort

BDS layout & possible sources of muons SP2 SP4 MPS coll skew correction / emittance diagnostic septa betatron collimation polarimeter fast kickers fast sweepers tuneup dump BDS layout & possible sources of muons beta match final focus polarimeter energy collimation SPEX IP primary dump energy spectrometer clean-up collimators fast sweepers muon wall final doublet energy spectrometer February 4, 07 Global Design Effort

Muon reduction Muon flux in BDS & IR with and without 5m muon wall N.Mokhov et al., FNAL Muon flux in BDS & IR with and without 5m muon wall Allows reducing flux in TPC to a few m per ~100 bunches 5m wall February 4, 07 Global Design Effort

Muon walls Purpose: Personnel Protection: Limit dose rates in IR when beam sent to the tune-up beam dump Physics: Reduce the muon background in the detectors 5m muon wall installed initially If muon background measured too high, the 5m wall can be lengthened to 18m and additional 9m wall installed (Local toroids could be used also) February 4, 07 Global Design Effort

Beam gas & SR in IR Beam gas SR in IR is minimized by controlling the pressure near IP within 1nTorr level, 10nTorr in 200-800m from IP and ~50nTorr in the rest of the system SR in IR due to upstream collimation is contained within a defined cone which is extracted away Example of SR rays from beam halo in IR apertures F.Jackson, et al February 4, 07 Global Design Effort

Extraction Lines nominal parameters (500 GeV CM) Y.Nosochkov, et al optional high L parameters (500 GeV CM) Losses for the nominal case are negligible (~1W for 200m from IP) Even for High L parameters is within acceptable levels Small losses in extraction and separation from dump are important to keep the back-shine low February 4, 07 Global Design Effort

Anti-DID coils -5 -3 -1 1 3 5m Two overlapping Detector Integrated Dipole coils create field flattened in the IR region B.Parker, et al, BNL Application of anti-DID to guide pairs to the exit hole February 4, 07 Global Design Effort

Antisolenoids SiD with L*=4.5m LDC with L*=4.5m Antisolenoids for local compensation of beam coupling Depend on all parameters (L*, field, sizes, etc) and is a delicate MDI issue QD0 Example of optimal field for local compensation of coupling (SiD, L*=3.5m) B.Parker, BNL February 4, 07 Global Design Effort

Arrangements for two detectors IR design Shielding Moving the detectors Services Opening Connections etc February 4, 07 Global Design Effort

Warm space for vacuum valves for disconnect IR conceptual design Detector Move with detector Stay fixed Warm space for vacuum valves for disconnect B.Parker, et al, BNL February 4, 07 Global Design Effort

IR magnet design Shield ON Shield OFF Actively shielded QD0 Intensity of color represent value of magnetic field. Active shielding demonstration February 4, 07 Global Design Effort

Generic Detector - IR Details Steel Yoke (no yoke for 4th) Antisolenoid Solenoid BeamCal ECal HCal Low Z Mask TPC or Si Tracker FD Cryostats Detectors Working progress John Amann, et al LumiCal Vertex Detector IP Chamber February 4, 07 Global Design Effort

Generic IR layout Vertex Detector Mask Beam Cal QD0 Space for Feedback Kicker IP Chamber OC0 LumiCal Detectors SD0 FD Cryostat Group 1 Valves for Push Pull QF1 QDEX1 SF1 Warm Beam Pipes OC1 FD Cryostat Group 2 QFEX2 February 4, 07 Global Design Effort

IR forward region and chambers Watch in study & design: integration; support; assembly; wake-fields and EMI; location of BPMs; vacuum & pumping; cold-warm transitions; etc. February 4, 07 Global Design Effort

Shielding the IR hall Self-shielding of GLD 250mSv/h Self-shielding of GLD Shielding the “4th“ with walls February 4, 07 Global Design Effort

Working progress on IR design… Mobile Shield Wall Illustration of ongoing work… Designs are tentative & evolving Structural Rib 3m Thickness Overlapping Rib Mobile Platform 20m x 30m Electronics/Cryo Shack 1m Shielded 25m Height 9m Base John Amann February 4, 07 Global Design Effort

Beamline shielding Pac Man Open Illustration of ongoing work… Designs are tentative & evolving Recessed Niche Pac Man Closed John Amann Beam Line Support Here February 4, 07 Global Design Effort

Beamline shielding Looking into experience of existing machines… CMS shield opened Looking into experience of existing machines… pacman opened SLD pacman closed pacman opened door tunnel pacman closed February 4, 07 Global Design Effort

Air-pads at CMS Single air-pad capacity ~385tons Air-pads equipped with hydraulic jack for height adjustment & service Lift is ~8mm for 385t units Steel plates (~4cm) on the floor (compressed air 50bars) Inclination of ~1% of LHC hall floor is not a problem Last 10cm of motion on grease pads [Alain Herve, et al.] Photo from the talk by Y.Sugimoto, http://ilcphys.kek.jp/meeting/lcdds/archives/2006-10-03/ 14kton ILC detector would require ~36 such air-pads February 4, 07 Global Design Effort

Displacement, modeling Idealized models Short range deformation (~0.1mm) is very similar in both models. Long range (1/r) deformation (~0.3mm) is not seen in ANSYS because too thin slab in the model More details (3d shape of the hall, steel plates on the floor, etc.) to be included. Long term settlement, inelastic motion, etc., are to be considered. Parameters: M=14000 ton; R=0.75m (radius of air-pad); E=3e9 kg/m^2, n=0.15 (as for concrete); Number of air-pads=36 Analytic model, half-space ANSYS model J.Amann, http://ilcagenda.cern.ch/conferenceDisplay.py?confId=1225 February 4, 07 Global Design Effort

Hilman rollers is also a possibility For pre-determined path of motion for detector exchange, Hilman rollers may be suitable Standard capacity to 1kton While not standard items, the 5kton capacity rollers have been manufactured Durability is important and to be studied Contact Roll Roller Chain Links 5000 ton module will have 51 contact rolls in 3 rows of 17 February 4, 07 Global Design Effort

Screw type drive system Other considerations Hydraulic Jacks/Shims Hydraulic jacks for adjustment Drive systems Guiding mechanism Alignment, etc Screw type drive system February 4, 07 Global Design Effort

Detector support Detector may have a supporting platform size of IR hall increased to allow for this February 4, 07 Global Design Effort

Concept of IR hall with two detectors B The concept is evolving and details being worked out may be accessible during run detector A accessible during run Platform for electronic and services (~10*8*8m). Shielded (~0.5m of concrete) from five sides. Moves with detector. Also provide vibration isolation. February 4, 07 Global Design Effort

Concept of detector connections fixed connections long flexible connections detector detector service platform or mounted on detector high V AC high P room T He supply & return chilled water for electronics low V DC for electronics 4K LHe for solenoids 2K LHe for FD high I DC for solenoids high I DC for FD gas for TPC fiber data I/O electronics I/O low V PS high I PS electronic racks 4K cryo-system 2K cryo-system gas system sub-detectors solenoid antisolenoid FD move together February 4, 07 Global Design Effort

Concept of cryo configuration Need to be optimized for fast switch of detectors in push-pull and fast opening on beamline QD0 part QF1 part This scheme may require lengthening L* to 4.5m and increase of the inner FD drift Opening of detectors on the beamline (for quick fixes) may need to be limited to a smaller opening (MDI negotiation issue!) than what could be done in off-beamline position door central part February 4, 07 Global Design Effort

Finishing up… Machine Detector Interface issues which require careful balance of very different constrains from Detectors and Machine IR design, FD, support, connections, alignment Detector design, opening, movements Backgrounds, machine and beam related Conventional facilities Stability Services Radiation safety etc February 4, 07 Global Design Effort

Summary Interaction Region is a machine area where balance of design constraint from many groups is especially important The Beam Delivery Design group is looking forward to work on IR design together with Detector colleagues in the EDR phase of ILC February 4, 07 Global Design Effort

Thanks BDS design team MDI panel Detector colleagues Push-Pull evaluation task-force Colleagues from LHC, CERN All colleagues involved in BDS & MDI work February 4, 07 Global Design Effort