Laser Monitoring System On behalf of the Caltech group

Slides:



Advertisements
Similar presentations
September 21, 2005Virgo Status – ESF Workshop1 Status of Virgo B. Mours.
Advertisements

MEF - Machines & Experimental Facilities Technical Stop #4 29 th August - 2 nd September 2011 Summary Julie Coupard Schedule and Coordination LHC-TS4 -
Ondřej Svoboda for the ECAL group HADES collaboration meeting XXV, 19 – 23 November 2012 GSI.
David BAILLEUX US CMS on behalf of the Caltech group Laser Monitoring System - Electronics review 20 March Overview Overview Laser control Laser.
01/10/ PHOS Cooling status (1 Oct) Incident happened (ECV failure) 1 Oct at 5 Am cooling plant failure happened: ECV (electrical.
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
First results from the Biocams J. Brunner. Cameras on floor 1 and floor 5 together with an OM and an ADCP Floor 1 –80m above sea floor Floor 5 –270m above.
KEN, JERI FU JEN CATHOLIC UNIVERSITY 2008/DEC./11 1 Testing Status of P.P. & APD.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
This is an example text TIMELINE PROJECT PLANNING DecOctSepAugJulyJuneAprilMarchFebJanMayNov 12 Months Example text Go ahead and replace it with your own.
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
CMS LEWA LDE1/M500 CO 2 pumps N° N°
SR 518 Interchange Restoration Pre-Bid Meeting 4/28/16.
Possible Run 10 plan based on 25 Nov Revised Plan Run10, 25 cryo-weeks (my guesses after Jan 12) – Dec. 1, Begin cool down to 4.5K – Dec. 4, Cooldown to.
ELENA installation progress F. Butin / ELENA collaboration.
David BAILLEUX On behalf of the Caltech group Issues for the Laser Monitoring System M&O - US CMS ECAL IB meeting 19 March Chilled water supply.
Weekly Coordinator report July 30 th – August 6 th Murphys Law: If anything can go wrong, it will. Eric’s Observation: Catastrophies coming in sequentially,
CONS and HL-LHC day Analysis of needs from TE-EPC
Machine operation and daily maintenance management in SOLEIL
Circuits A circuit is a loop of wire with its ends connected to an energy source such as a cell* or a battery*.
Madagascar’s Tropical Climate
Long irradiation at the side
Update on HW commissioning
2011/ 07/06 Jacqueline Yan IPBSM
Baltimore.
Power measurement 2 August
Total Productive Maintenance and Quick Changeover
Number of visitors to the library.
RAASA Report 02 November 2018.
Summary of Week 16 G. Arduini, J. Wenninger
Opening Assignment 1. What page does Chapter 14 Sec 1 start?
Assembled by the Rubicon Forest Protection Group
RAASA Report 04 September 2017
RAASA Report 22 December 2016.
RAASA Report 20 December 2018.
Operation Progress and Upgrade in SSRF
FY 2019 Close Schedule Bi-Weekly Payroll governs close schedule
Technical Stop #4 29th August - 2nd September 2011
Fault Recovery Time for C100 Modules Spring ‘16
PBIS Update November 2005.
PBIS Update December 2005.
Applied Combinatorics, 4th ed. Alan Tucker
2300 (11PM) September 21 Blue line is meridian..
Advanced Research Electron Accelerator Laboratory
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
April May April May June July July June August Sept August
Chapter 3, Lesson 3, Temperature, Thermal Energy, and Heat
PBIS Update October 2005.
Model 7: Results and Sensitivity Analysis
On behalf of the Caltech Laser Group
T2K Run8 MUMON Summary.
R. Messner May 2004 Readiness Review
ABO CE No. 2 MR series & coating
PLANNING LOOKING AHEAD…. Long Term Goals (Assigned to…)
iSolar Lighting System - For areas lack of electricity
Births as per Civil Registration System,
Laser Monitoring System since installation at pt5
Scatterplots, Association and Correlation
JUNE 2010 CALENDAR PROJECT PLANNING 1 Month MONDAY TUESDAY WEDNESDAY
WELCOME.
PLAYMATES LEARNING CENTER CALENDAR
Summary Tuesday h23: Machine closed. Precycle started.
Operational Update 1.
2009 TIMELINE PROJECT PLANNING 12 Months Example text Jan Feb March
Agate: What Good is a Moose?
PBIS Update January 2006.
Ft. Benning Office Hours
Unit 3 My school calendar
Presentation transcript:

Laser Monitoring System On behalf of the Caltech group Plots from laser monitoring  Number of interventions  Slow – Matacq correlation APRIL – 6 DEC 2010 David BAILLEUX On behalf of the Caltech group

Not the same scale as the Light Checker RED and BLUE laser history Laser maintenance usually done during the TC, technical stop of CMS so invisible interruption (for RED laser). When laser is ONLINE , data taking, laser values are inside the limits all the time else there is intervention ! (few minutes or few hours) Not the same scale as the Light Checker (#limits) data not uploaded end of May but Laser OK. April May June July August Sept Oct Nov Laser 2 Laser 1 L.2 Laser 1 Laser 2

RED and BLUE laser history Current evolution show any laser interventions of adjustments: when it’s get high something wrong; when restart from low current, working point, mean tuning; when current goes to decrease it’s not so well, current should increased to compensate lamp aging. But this is theoretical because feedback is set on TIS timing now, not on the YLF energy Blue laser intervention Red laser intervention April May June July August Sept Oct Nov Maintenance Laser 2 Laser 1 L.2 Laser 1 Laser 2 Services

Statistics of interventions Not take into account small tuning of laser optics of delay adjustments. Months Usual maintenance or services ( laser failures) Number of switching time with spare laser April 3 1 May June 2 July August Sept Oct Nov Replacement parts Since April Nb. of items Lamp 12 Flow tube 3 YLF Crystal 1 Solenoid valve (cooling) ICS box (RS232/GPIB) Blue HV Pulser

Statistics of interventions Interruption RED laser: Monday 15 Nov so mostly failed weekend . : 2 days 8 Oct : power decrease. New lamp: 1/2 day Monday 20 Sept: YLF died, weekend : 3 days 23 August, new lamp : ½ day

Normalization with Matacq data. Plot: 29Oct2010. SLOW monitoring Matacq Over 24hrs Power: x733 and x 4500 factor But internal attenuation : red = 7%, blue=40% Thus consistent. RMS blue NRJ: 4%  2.8% RMS red NRJ: 2%  2%

SLOW monitoring Matacq Over 24hrs Over 24hrs FWHM higher on Matacq because of setup (longer BNC cable..)

SLOW monitoring Matacq Limits on Matacq are: Over 24hrs Limits on Matacq are: 1440 ns < 1465ns < 1490 ns Limits on slow monitoring should be : 11730 ns < 11755ns < 11780 ns

Fast Acqiris plot for critical period Sept Oct Sept Oct 20 Sept: RED laser services. 22 Sept: No hand-shake mode  switching time reduce 8sec to 4sec 5 Oct : laser1 to Laser2 8 Oct: Laser3 change the lamp (power decrease) 20-27 Oct: Laser2 services. Still online.