Injection system design for high-energy circular collider FCC-hh

Slides:



Advertisements
Similar presentations
CEPC BoosterDesign CEPC Booster Design FCC Week 2015, March, 2015 Marriot Georgetown Hotel Huiping Geng Presented for Chuang Zhang.
Advertisements

Damping ring K. Ohmi LC Layout Single tunnel Circumference 6.7 km Energy 5 GeV 2 km 35 km.
FCC-hh Injection and Extraction
ALPHA Storage Ring Indiana University Xiaoying Pang.
B.Goddard 08/11/04 HHH 2004 Workshop, CERN Beam Dump Brennan GODDARD CERN AB/BT The existing LHC beam dump is described, together with the relevant design.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
KICKER LNF David Alesini LNF fast kickers study group* * D. Alesini, F. Marcellini P. Raimondi, S. Guiducci.
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
REQUIREMENTS FOR FCC DILUTION KICKERS AND BEAM DUMP LINE GEOMETRY F. Burkart, W. Bartmann, M. Fraser, B. Goddard, T. Kramer FCC dump meeting 18 th June.
1 st September 2005LHC-LUMI 05 - G.Arduini – CERN/AB Optical requirements for the magnetic lattice of the high energy injectors (SSPS in the SPS tunnel)
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
EMMA injection & extraction Takeichiro Yokoi(Oxford University)
BEAM TRANSFER CHANNELS, BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS OF NICA ACCELERATOR COMPLEX Tuzikov A., JINR, Dubna, Russia.
Design of the Turnaround Loops for the Drive Beam Decelerators R. Apsimon, J. Esberg CERN, Switzerland.
Damping Ring Parameters and Interface to Sources S. Guiducci BTR, LNF 7 July 2011.
Injection Energy Review D. Schulte. Introduction Will review the injection energy So could answer the following questions: Which injection energy can.
NSLS-II Transfer Lines BUDKER INSTITUTE OF NUCLEAR PHYSICS NOVOSIBIRSK.
Plan for Beam Extraction using strip-line kicker with pulse bump orbit Present extraction kicker system Strip-line kicker system for ILC Beam extraction.
FCC DUMP SYSTEM W. Bartmann, B. Goddard, R. Ostojic FCC Dump Meeting, 14 th Jan
LHC beam dump, injection system and other kickers B.Goddard, with input from L.Ducimetière, W.Bartmann, V.Mertens, J.Borburgh, M.Barnes, C.Bracco, V.Senaj,
Lattice design for FCC-ee Bastian Haerer (CERN BE-ABP-LAT, Karlsruhe Institute of Technology (KIT)) 1 8 th Gentner Day, 28 October 2015.
Damping Ring Specifications S. Guiducci ALCPG11, 20 March 2011.
Accumulator & Compressor Rings with Flexible Momentum Compaction arccells MAP 2014 Spring Meeting, Fermilab, May 27-31, 2014 Y. Alexahin (FNAL APC)
Crossing Schemes Considerations and Beam-Beam Work plan T. Pieloni, J. Barranco, X. Buffat, W. Herr.
HF2014 Workshop, Beijing, China 9-12 October 2014 Challenges and Status of the FCC-ee lattice design Bastian Haerer Challenges.
Beam transfer considerations for LAGUNA Angelina Parfenova, W. Bartmann, L. Ducimetiere, B. Goddard, V.Kain, M.A. Kowalska, M. Meddahi, B. Puccio, F. Velotti.
Layout and Arcs lattice design A. Chancé, B. Dalena, J. Payet, CEA R. Alemany, B. Holzer, D. Schulte CERN.
CLIC Frequency Multiplication System aka Combiner Rings Piotr Skowronski Caterina Biscari Javier Barranco 21 Oct IWLC 2010.
Injection scheme for ultimate storage ring with double RF system Bocheng Jiang SSRF AP group SINAP. CAS LOWεRING 2014.
Operation Status of the RF Systems and Taiwan Photon Source
First evaluation of Dynamic Aperture at injection for FCC-hh
Baseline Injection/Extraction Configuration Aimin Xiao and Louis Emery, September 12th 2006.
PS2 WG Injection and extraction systems Basics and assumptions
Operating IP8 at high luminosity in the HL-LHC era
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
Beam Instability in High Energy Hadron Accelerators and its Challenge for SPPC Liu Yu Dong.
LINAC4 ADVISORY COMMITTEE
A.Lachaize CNRS/IN2P3 IPN Orsay
Surviving an Asynchronous Beam Dump?
Introduction: FCC beam dumping system
Septa requirements and suitable septa topologies for FCC
Case Study - Group 2 FCC-ee Top-Up Injection
Large Booster and Collider Ring
FCC hh dump kicker - switch topologies and impact on beam
FCC Kicker Systems M.J. Barnes, T. Kramer CERN TE-ABT
Junji Urakawa (KEK) for ATF International Collaboration
Laboratoire de L’Accélérateur Linéaire
FCC-hh injection group 7
CEPC-SppC Accelerator CDR Copmpletion at the end of 2017
Design a top‐up injection System for a light source
Progress of SPPC lattice design
2017 CAS Erice case study: Design of a beam dumping system for FCC
Cui Xiaohao, Bian Tianjian, Zhang Chuang 2017/11/07
Design Study of the CEPC Booster
LHC (SSC) Byung Yunn CASA.
CEPC-SPPC Beihang Symposium
Negative Momentum Compaction lattice options for PS2
Simulation of Multiturn Injection into SIS-18
GROUP 12 CAS – Erice - March 2017 Andrea DE FRANCO
Proposal for a CESR Damping Ring Test Facility
Kicker and RF systems for Damping Rings
Kicker specifications for Damping Rings
Injection design of CEPC
Negative Momentum Compaction lattice options for PS2
Specifications for the XFEL Beam Switchyard Kickers
JLEIC ion fullsize booster (2256m) space charge limit (Δν=0
Technical challenges for forming the double intensity section of JLEIC ion beam Jiquan Guo.
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
JLEIC Ion Beam Formation options for 200 GeV
Presentation transcript:

Injection system design for high-energy circular collider FCC-hh Group 8 Agnieszka Chmielinska (CERN) Gian Piero Di Giovanni (CERN) Keith Furutani (Mayo Clinic Rochester) Zahra Rezaei (Laboratoire de l'Accélérateur Linéaire) Bo Wu (Chinese Academy of Sciences) CAS, Erice, 18/03/2017 Case study C

Injection system design HEB FCC Inner orbit injection Outer orbit injection 3.3 TeV 26.6 km 100 km Injection system design FQ DQ Horizontal plane Septum Kicker TDI absorber jaws Cryostats maximum 500 mm 1. Circulating beam Maximum 700 m CAS, Erice, 18/03/2017 Case study C

Lattice design MADX Lcell = 405 m βx= 611.1 m βx=60.9m Δμx=90⁰ Kicker Septum QF QD MADX The beta function in horizontal direction was set to be 1000 m at the entracne and at the end of the cell. To fulfill that we were varing quadrupols srength. We chose to put the septum closeer to defocusing quadrupole, to minnimize the deflection angle of the kicker. Knowing the position of the septum, we found position of the kicker to have phace advance of 90 degrees. CAS, Erice, 18/03/2017 Case study C

Injection system layout 𝐻/2=10 𝜎 𝑥 + 𝑥 𝐶𝑂𝐷 2mm + 𝑥 𝑎𝑙𝑖𝑔𝑛 1mm +15.15mm=22mm FQ Circulating beam DQ Horizontal plane 550 mm 200 m 180 m 153 m Septum Kicker 19.43 mm 15.15 mm Element FQ Septum DQ Kicker βx (m) 1000.3 60.9 46.0 611.1 X (±10σx) (mm) 15.81 3.90 3.39 12.36 θdeflection (mrad) - 2.864 0.095 0.101 Leff (m) 1.5 21 32 Magnetic Field 34 T/m 1.5 T -42 T/m 0.05 T Beam size = 10 sigma = ten times the beam size Epsilion=(epsilonN/beta y) Sigma=sqrt(beta epsilon) COD – closed orbit distortion CAS, Erice, 18/03/2017 Case study C

Kicker magnet 𝐿 𝑚/𝑚 ≅ 𝑢 0 𝑁 2 𝐻 𝑎𝑝 𝑉 𝑎𝑝 𝐿 𝑚/𝑚 ≅ 𝑢 0 𝑁 2 𝐻 𝑎𝑝 𝑉 𝑎𝑝 Assuming 𝐻 𝑎𝑝 = 𝑉 𝑎𝑝 : 𝐿 𝑚/𝑚 =1.26E-06 H/m 𝜏= 𝐿 𝑍 0 Assuming 𝑍 0 =𝟓 𝛀,𝜏=𝟎.𝟐 𝛍𝐬: 𝐿 𝑢𝑛𝑖𝑡 =𝟎.𝟖 𝐦 What should be the length of the entire magnet? Including beam screen! 1 Assuming: 𝐿 𝑒𝑓𝑓 =𝟑𝟐 𝐦 40 magnets necessary. 𝐼 =𝟐 𝐤𝐀 𝑉=𝟏𝟎 𝐤𝐕 CAS, Erice, 18/03/2017 Case study C

Bunches/Rise Time/Filling Pattern (I) Maximum beam energy that can be transferred: 5 MJ Maximum number of transferred bunches: 𝑁 𝑏 = 𝐸 𝑡𝑟𝑎𝑛𝑠 𝐼𝑛𝑡𝑒𝑛𝑠𝑖𝑡𝑦 ∙ 𝐸 𝑖𝑛𝑗 = 5 𝑥 10 6 𝐽 10 11 𝑝𝑟𝑜𝑡𝑜𝑛𝑠 ∙3.3 𝑥10 12 𝑒𝑉 ∙1.602 𝑥 10 −19 𝑒𝑉/𝐽 ~94 Planned to inject: 90 bunches Flat-top time: tflattop = 90 bunches * 25x10-9 s = 2.25 ms For 100 Km collider and 25 ns buckets the ideal number of bunches is about 13342 Assuming 80% filling factor we plan to inject 10674 bunches. The desired rise time is about 280 ns: Number of empty bunches = 2668 Planned injections is 10674/90 ~ 118 injections Assuming rise time and fall time to be identical and neglecting the abort gap This implies 12 bunches needed for rise/fall time so the injection scheme would be 12b + 90b + 12b … Number of injections is finally 117.

Bunches/Rise Time/Filling Pattern (II) With 117 injections and assuming 3 mins to get the HEB filled and energy ramped → Assuming only 90 bunches in HEB at the time, it would take ~6 hrs to fill the FCC with one beam. How could this be speeded up? → Fill the HEB with multiple trains HEB can ideally accommodate 3562 bunches → At most 31 trains in 12b + 90b + 12b… In this configuration one can fill up the HEB and then inject in FCC (4 times). → Another approach could be by reducing the injection energy and allowing more bunches in each train to be transferred. For instance we were provided with the option of 6.9 km ring at Einj=1.3 TeV: Number of bunches that can be transferred is 240 (factor ~3 in time reduction). Assuming the same 80% filling factor: trise = 758 ns and tflattop = 6.0 ms. Number of injections would be 44. Injection scheme would be 30b+ 240b +30b… For the same parameters, the effective length of the magnet would be 12.5 m … For higher rise time, the one module would be 3 m long.

Hardware considerations Flat top ripple: max. 1 % (minimized by optimizing electrical circuit of the magnet) Post injection ripple: must be reduced to not perturbate circulating beam Failure scenarios: → flashover (2.5 % deflection error) → wrong injected beam (TDI absorber) Powering: independent for each kicker magnet Important aspects: → screening of the ferrite to reduce heating and beam coupling impedance → beam screen made of low SEY material to reduce the electron cloud → high quality vacuum inside the kicker magnet CAS, Erice, 18/03/2017 Case study C

Thank you for your attention.