Monday Recover after trip of RB.A81  Cause of the trip not clear. MP3? 09:00-13:00 Re-inject and Injection verification. In parallel investigations on.

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
Goal of the week: Stable beams with trains of 200 & 248 bunches 1 OP summary of week 40 R. Bailey, J. Uythoven & J. Wenninger.
06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
Wednesday 8.9 External crossing angles:
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Machine Coordinators: G. Arduini, J. Wenninger
Friday 15th June 01:11 Injection.
Wednesday September 14th
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Tue :25 Beams dumped due to RF vacuum interlock
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
LHC Morning Meeting - G. Arduini
LHC Morning Meeting - G. Arduini
Saturday 1.3 e32 Overnight Morning
Summary of Week 11: 14 – 21 March
Summary of week 44 Aims of week 44 J. Wenninger & J. Uythoven
Tuesday 08:30 Fill 2700 dumped by QPS on RCBXH2.L1
Tuesday Fill 1494 dumped by operations at (~ 0.25 ub-1 in ~6.5 h): LSS6 BPM interlock test 13:00 Fill 1495 dumped by RF dump (cavity quench) 14:00-17:30.
Summary of Week 13 G. Arduini, B. Holzer
LHC commissioning Week 38
Summary of Week 16 G. Arduini, J. Wenninger
Lost at 12:05 to power converter (RTQX2.R1) problem
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
Wire almost entirely through beam before BLM triggers dump
Tuesday 9th November 10:02 Fill beams dumped
Friday 16/3 08:30 – 10:15 Access for QPS and EPC (BI in point 4)
Summary Thursday h21: Stable beams fill #1303.
Sunday/Monday & :30 Stable beams. Fill #1851.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Monday – Morning Fill 3265 stable beams since 1:31
Monday 24 October hours of 25ns MD
Thu 6/4 End of fill #2470. ~1 pb-1 in 4 hours. Dumped by CMS BCM.
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Tuesday 17/5 10: TeV - colliding. Start roman pot alignment ...
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Saturday Nov Stop proton operation. Switch back to ions
Programme for Friday 9 July
Friday 8/10/10 - Morning Planned to keep fill until the afternoon
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
07/08/2010 Fill #1264 dump at 02:14:38.
Wednesday h10: Programmed dump. 07h54: Injection. 200b.
Saturday :42 stable beams fill 3541
Monday Fill 1803 into stable beams at 9:30. Dump at 19:45.
LHC Morning Meeting - G. Arduini
LHC - Week 38 Technical stop: Katy Foraz
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Summary Tuesday h23: Machine closed. Precycle started.
Wednesday 23/2 Thanks CRYO!!!.
Wednesday 6th April Injection of 50 ns up to 108 bunches (3 x 36).
Coordination: Eva Barbara Holzer, Mike Lamont
Wednesday h18: 228b fill lost just before start of ramp.
Another Immortal Fill….
Tuesday 24/5 Fill # :00 Stable beam fill # bunches
Thursday Morning/Afternoon
Monday 14th May 00:03UFO at BLMQI.06R8.B2E10_MQML. Beam dump Re-steering required for TI2 03:28 STABLE BEAMS # e11 ppb, 4.11e33 cm-2s-1 13:36.
Tuesday End of fill 1393 Movement of suspicious Roman pots OK
Wed 12/10 09:30 – 10:30 Ramp down of ALICE solenoid to 50% nominal field on request of ALICE. Increase of the vacuum (e-cloud in this area that has not.
Wednesday 6.10 Morning: Quench test at 450 GeV
Tuesday
Thursday 10:00 Fill 1986 in stable beams.
HI2011 Commissioning Status
Monday 152 bunch operation summary
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

Monday Recover after trip of RB.A81  Cause of the trip not clear. MP3? 09:00-13:00 Re-inject and Injection verification. In parallel investigations on the injection pulse inhibit occurred on Sunday 13:00-15:00 Pre-cycle of S12 after power cycle of nQPS crate B10L2 needs to be power cycled to re-establish local communication. 15:00-17:00 Work in the injectors to adjust intensity, transverse, longitudinal parameters. RE-optimization of the scraping in the SPS to reduce losses (20% of beam lost) 17:00 Beams dumped during injection of last but one 24 bunch train of B1 (losses on TCTH.4L2.B1) 17:00-19:00 Reduction of the transverse blow-up in PS and SPS 21:20 Stable beams #1408  Finally some physics!! 07:00 End of physics #1408 (~2.4-2.5 pb-1 in 9.6 h) for vernier scans 07:30 Beam dump 08:30 Access

Injection TI8 resteered in H and V to optimise losses and injection oscillations - corrected back to the reference and the injection looked good - IQC all green for 24b, oscillations below 0.5 mm TI2 looks fine in steering - the -1.25 mm bump is left in through the MSI. Large oscillations in V as a result. Checked effects of moving in some TI2 screens, on losses in MSI, with TCDIs out Confirm the request to check locally the alignment of the MSI, especially in the region of transition between MSIB and MSIA. B. Goddard, M. Meddahi

Injection kicker pulse inhibit Drift of LHC timing wrt SPS timing due to GPS time reference. LHC RF prepulse generation is based on SPS timing, but MKI resonant charging start is based on LHC timing. Timing drift introduced a delay of roughly 200us on LHC injection forewarning (-1000ms) wrt RF injection prepulse. Problem disappeared after re-synchronization of the machines on Monday at 3 AM Sat 09/10 Sun 10/10 Ph. Baudrenghien, E. Carlier, J. Kozsar, N. Magnin

Injection kicker pulse inhibit Actions: Verification by expert of the status of the synchronization before injection (done for the past fill) Replacement of the GPS timing receiver  this morning Other actions under study: pulse (instead of the LHC timing) to start charging the PFN, making the scheme more robust  we should go for that extraction inhibit when injection pulse is inhibited

Stable beams #1408 Initial emittances from luminosity ~2.5 um

Vacuum Stable beams #1408 Switched OFF/ON solenoids at ~23:00?

Quasi-UFO event In 27.R7 ~10 mins after the start of physics 21:33:31 - Warning on: BLMQI.27R7.B2I30_MQ, integration time: 640 us, losses = 9.250231E-02, threshold = 2.192476E-01, ratio = 42% 21:33:31 - Warning on: BLMQI.27R7.B2I30_MQ, integration time: 2560 us, losses = 2.536262E-02, threshold = 5.481189E-02, ratio = 46% 21:33:31 - Warning on: BLMQI.27R7.B2I20_MQ, integration time: 640 us, losses = 9.020587E-02, threshold = 2.192476E-01, ratio = 41% 21:33:31 - Warning on: BLMQI.27R7.B2I20_MQ, integration time: 2560 us, losses = 2.487477E-02, threshold = 5.481189E-02, ratio = 45% 21:33:31 - Warning on: BLMQI.27R7.B2I10_MQ, integration time: 320 us, losses = 3.716156E-01, threshold = 6.445071E-01, ratio = 58% 21:33:31 - Warning on: BLMQI.27R7.B2I10_MQ, integration time: 640 us, losses = 2.699785E-01, threshold = 3.222535E-01, ratio = 84% 21:33:31 - Warning on: BLMQI.27R7.B2I10_MQ, integration time: 2560 us, losses = 7.329793E-02, threshold = 8.056338E-02, ratio = 91% THAT WAS CLOSE!

Today Access from 08:30 to 12:00-13:00: PM: Access in IP2 for Injection area investigations (radiation survey, alignment, X-ray) UJ33 for the installation of a magnetic probe at 09:00 Cryogenics in PM85 (no RP, no MAD required) UPS in UX45 In parallel: change of GPS repeater PM: Recovery and injection verification (B1) Abort gap cleaning at injection (4 hours) Night: Physics fill with 248 bunches Wednesday AM: VdM scan

Outstanding requests for studies Periodic loss maps (not really MD) Betatron loss map done week 40. Orbit shift versus TCT check: collide 1 bunch and check the TCT center change as compared to predicted orbit change. BI PLL studies during ramp Commission BGI in preparation to ions – switch on at injection Other BI studies – list to be updated Test of 'dynamic' references for the OFB (varying Xing.separation bump): injection, then test of ramp + first part of squeeze. BT Abort Gap Cleaning – on at injection for physics Injection Studies 32 Bunches when required (344 bunches) Setting-up of the SPS with tighter batch spacing (225 ns)

Scheduled lift maintenance Some preventive maintenance has been requested on the LHC lifts, and agreed according to the following planning: Tuesday 5 October:             PM15 from 8h to 12h00; PM25 from 13h30 to 17h30 Wednesday 6 October:       PX24 from 8h to 12h00; PZ33 from 13h30 to 17h30 Thursday 7 October: PM85 from 8h to 12h00; PZ85 from 13h30 to 17h30 Tuesday 12 October :          PM56 from 8h to 12h00; PM65 from 13h30 to 17h30 Wednesday 13 October:     PZ65 from 8h to 12h00; PM76 from 13h30 to 17h30 Thursday 14 October:          PM45 from 8h to 12h00; PZ45 from 13h30 to 17h30 PM56 PZ85 La maintenance du PM56 aura lieu le jeudi 7 de 13h30 à 17h30, celle du PZ 85 le mardi 12 de 8h à 12h.

Access Requests TI : demineralized water alarm UA83  Technical stop COD: RCBH15.L6B1 RCBXH3.R1 temperature reading issue?