Planning Geomagnetic Disturbance Task Force (PGDTF) Update to the ROS

Slides:



Advertisements
Similar presentations
STATUS OF BULK ELECTRIC SYSTEM DEFINITION PROJECT
Advertisements

NERC New Approved Standards
Presented to PGDTF February 11, 2015
PER
1 PER-005 Update Impact on Operators System Operator Conference April and May 1-3, 2012 Columbia, SC Margaret Stambach Manager, Training Services.
Recent NERC Standards Activities RSC – Jan. 5, 2011 NSRS Update Date Meeting Title (optional)
Why TADS Is Needed No systematic transmission outage data collection effort exists for all of North America Energy Information Administration data (Schedule.
2009 Performance Assessment Member Representatives Committee Meeting October 28, 2008.
CIP Version 5 Update OC Meeting November 7, 2013.
Physical Security CIP NERC Standing Committees December 9-10, 2014.
Reliability Standards Update
WECC Standards Update Steve Rueckert – Director of Standards W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Critical Infrastructure Protection Update Christine Hasha CIP Compliance Lead Advisor, ERCOT TAC March 27, 2014.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
Lisa Wood, CISA, CBRM, CBRA Compliance Auditor, Cyber Security
Standards Update Project Geomagnetic Disturbance Mitigation Kenneth A. Donohoo, Oncor Electric Delivery Co LLC Chairperson, GMD Task Force Presentation.
Compliance Performance Measure Proposals and Preliminary Trends Greg Pierce – Chair, Performance Measures Task Force Compliance and Certification Committee.
1. 2 NERC Bulk Electric System (BES) Definition (NERC Glossary of Terms Used in Reliability Standards) FERC Order 693 FRCC Handbook Review Task Force.
July 2008 CPS2 Waiver SDT Technical Workshop for Draft BAL-001-TRE-01 Judith A. James Reliability Standards Manager TRE.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
Project System Protection Coordination Requirement revisions to PRC (ii) Texas Reliability Entity NERC Standards Reliability Subcommittee.
Project (COM-001-3) Interpersonal Communications Capabilities Michael Cruz-Montes, CenterPoint Energy Senior Consultant, Policy & Compliance, SDT.
NERC Project S ystem Protection Coordination - PRC-027​ Presentation to the NSRS Conference Call August 17, 2015 Sam Francis Oncor Electric Delivery.
Employee Privacy at Risk? APPA Business & Financial Conference Austin, TX September 25, 2007 Scott Mix, CISSP Manager of Situation Awareness and Infrastructure.
Standards Review Subcommittee Update August 17, 2010.
Texas Regional Entity Report Mark Henry June 6, 2008.
October 29, 2012 RARF Workshop 2 Introduction to ERCOT Modeling Process Jay Teixeira Manager, Model Administration.
Material for 10/23/2015 PGDTF Meeting Michael Juricek.
PGDTF Update to ROS November 5, 2015 Michael Juricek PGDTF Chairman 111/5/2015 ROS Meeting.
Transition Plan Network Operations Model Change Requests 5/26/2010.
1 Compliance Update June Control Performance Highlights  NERC CPS1 Performance April Performance  April performance comparison April 2007:
Compliance Update July Control Performance Highlights  NERC CPS1 Performance ERCOT’s May score was 146.1; June’s score was May has typically.
Data Requirements For Calculating Geomagnetically Induced Currents ROS Meeting March 3, 2016 Michael Juricek PGDTF Chairman 1.
Data Requirements For Calculating Geomagnetically Induced Currents PGDTF Meeting March 21, 2016 Michael Juricek PGDTF Chairman 1.
ME 3.0 to ME 5.0 ME3.0 review scheduled during the Joint NDSWG/NATF meeting in July. There were approximately 180 comments on the ME3.0 paper. Deadline.
Reliability Standard TPL Transmission System Planned Performance for Geomagnetic Disturbance Events September 28, 2016 TPL Standard Status.
Planning Geomagnetic Disturbance Task Force (PGDTF) Update to the ROS
ERCOT Bylaws Changes for Regional Entity
RASRS Report to Operating Committee March 21, 2017
GIC System Model Workshop
Planning Geomagnetic Disturbance Task Force (PGDTF) Meeting Material
NOGRR-169 OWG discussion Bill Blevins June 28, 2017.
Updated ERO Enterprise Guide for Internal Controls
GMD Research FERC Order No. 830 Research Work Plan Mark Olson, NERC
WECC Regional Standards Update
GIC Analysis using PSS®E
Path Operator Implementation Task Force
Phil O’Donnell, Manager Operations and Planning Audits
July 13, 2016 Department of Environmental Quality Proposed Amendments to UST Rules 15A NCAC 02N and 02O Ruth Strauss.
Merrill Brimhall – Engineer, Staff
September 8, 2016 Department of Environmental Quality Proposed Amendments to UST Rules 15A NCAC 02N and 02O Ruth Strauss.
Compliance Performance Measure Proposals and Preliminary Trends
GMD Data Request NERC Rules of Procedure Section 1600
Rates & Regulatory Updates
Presenter: Peter Heidrich, FRCC – BES Drafting Team Chair
NERC Critical Infrastructure Protection Advisory Group (CIP AG)
Workshop Session 1: Overview
Reliability Standards Development Plan
345 kV Bailey-Jones Creek Project Anticipated Project Schedule
Workshop Session 1: Overview
NERC Reliability Standards Development Plan
Larry Bugh ECAR Standard Drafting Team Chair June 1, 2005
North America Energy Standards Board
Phil O’Donnell, Manager Operations and Planning Audits
Project WECC-0100 Update Reliability Subcommittee
GMD Research FERC Order No. 830 Research Work Plan Mark Olson, NERC
TPL Voltage Guideline Presented to TSS Baj Agrawal Arizona Public Service Co. 8/21/2017.
NERC Reliability Standards Development Plan
Standards Development Process
345 kV Bailey-Jones Creek Project Anticipated Project Schedule
Presentation transcript:

Planning Geomagnetic Disturbance Task Force (PGDTF) Update to the ROS October 6, 2016 Michael Juricek PGDTF Chairman 10/6/2016 ROS Meeting

Michael Juricek - 10/6/2016 ROS Meeting TPL-007-1 Standard Status Update On January 21, 2015, NERC filed a petition seeking FERC approval of Proposed Reliability Standard TPL-007-1, Transmission System Planned Performance for Geomagnetic Disturbance Events. On February 26, 2015, Foundation for Resilient Societies, Inc. Initiated a Level 2 Appeal which NERC is Processing. On May 14, 2015, FERC Issued NOPR Proposing to Approve NERC TPL-007-1 and Directing NERC as Follows. Modify the Benchmark GMD Event Definition and Transformer Thermal Impact Study Requirements. Require Installation of Monitoring Equipment. Establish Specific Deadlines for the Development of Corrective Action Plans and the Completion of Plan Activities. On July 27, 2015, NERC provided comments in response to the FERC NOPR. Michael Juricek - 10/6/2016 ROS Meeting

Michael Juricek - 10/6/2016 ROS Meeting TPL-007-1 Standard Status Update On March 1, 2016, a FERC technical conference was convened to discuss the issues in the NOPR. NERC filed supplemental information on August 17, 2015, April 28, 2016 and June 28, 2016. On September 22, 2016, FERC issued Order No. 830 approving Reliability Standard TPL-007-1 (Transmission System Planned Performance for Geomagnetic Disturbance Events). TPL-007-1 establishes requirements for certain registered entities to assess the vulnerability of their transmission systems to GMDs, which occur when the sun ejects charged particles that interact with and cause changes in the earth’s magnetic fields. Applicable entities that do not meet certain performance requirements, based on the results of their vulnerability assessments, must develop a plan to achieve the performance requirements. Michael Juricek - 10/6/2016 ROS Meeting

Michael Juricek - 10/6/2016 ROS Meeting TPL-007-1 Standard Status Update In addition, the Commission directs NERC to develop modifications to Reliability Standard TPL-007-1. To modify the benchmark GMD event definition set forth in Attachment 1 of Reliability Standard TPL-007-1, as it pertains to the required GMD Vulnerability Assessments and transformer thermal impact assessments, so that the definition is not based solely on spatially-averaged data; To require the collection of necessary GIC monitoring and magnetometer data and to make such data publicly available; and To include a one-year deadline for the development of corrective action plans; two-year deadline to complete mitigation actions involving non-hardware mitigation and four-year deadline to complete mitigation actions involving hardware mitigation. FERC also directs NERC to submit the revisions within 18 months of the effective date the Final Rule. Additionally, the Commission also directs NERC to submit a work plan and (GMD research work plan) within 6 months of the effective date of the Final Rule, and subsequently, one or more informational filings that address specific GMD-related research areas. Michael Juricek - 10/6/2016 ROS Meeting

Michael Juricek - 10/6/2016 ROS Meeting Implementation Plan Date of 01/2017 Approval 60 days after Publication in the Federal Register 18 Months 07/2018 R2 System Models 48 Months 01/2021 R6 Thermal Assessment 6 Months 07/2017 R1 Identify Responsibilities 24 Months 01/2019 R5 GIC Flow Information 60 Months 01/2022 R3, R4, and R7 Performance Criteria GMD Assessment Corrective Action Plan   Michael Juricek - 10/6/2016 ROS Meeting

Michael Juricek - 10/6/2016 ROS Meeting TPL-007-1 Summary R1 requires to identify the individual and joint responsibilities of the Planning Coordinator (ERCOT) and Transmission Planners in ERCOT’s area for maintaining models and performing the study or studies needed to complete GMD Vulnerability Assessment. R2 requires to maintain System models and GIC System (DC) models of the responsible entity’s planning area for performing the studies needed to complete GMD Vulnerability Assessment Guidance for developing the GIC System model is provided in the GIC Application Guide developed by the NERC GMD Task Force and available at: http://www.nerc.com/comm/PC/Geomagnetic%20Disturbance%20Task%20Force%20GMDTF%202013/GIC%20Application%20Guide%202013_approved.pdf R3 requires to have criteria for acceptable System steady state voltage performance for its System during the benchmark GMD event described in Attachment 1. Applicability: ERCOT and Transmission Planners Responsible for R1, R2 and R3 Michael Juricek - 10/6/2016 ROS Meeting

Applicability: ERCOT Responsible for R4 and R5 TPL-007-1 Summary R4 requires a GMD Vulnerability Assessment of the system to determine its ability to withstand a Benchmark GMD Event without causing voltage collapse Assessment performed once every five years R5 requires to provide GIC flow information to be used for the transformer thermal impact assessment specified in R6 to each TO and GO that owns an applicable BES power transformer in the planning area. Additional guidance is available in the Transformer Thermal Impact Assessment white paper: http://www.nerc.com/pa/Stand/Pages/Project- 2013-03-Geomagnetic-Disturbance-Mitigation.aspx Applicability: ERCOT Responsible for R4 and R5 With Support from Transmission Planners Michael Juricek - 10/6/2016 ROS Meeting

Michael Juricek - 10/6/2016 ROS Meeting TPL-007-1 Summary R6 requires a Transformer Thermal Impact Assessment to ensure high-side, wye grounded BES transformers connected at 200kV or higher will not overheat based on the benchmark event Applies to transformers where effective GIC identified in GIC studies 75 A per phase or greater (not 75 A continuous). Effective 75 A per phase is a conservative screening criterion Approaches for conducting the assessment are presented in the Transformer Thermal Impact Assessment white paper posted on the project page http://www.nerc.com/pa/Stand/Pages/Project-2013-03-Geomagnetic-Disturbance-Mitigation.aspx Performed once every five years with GMD Vulnerability Assessment Applicability: Generator Owners and Transmission Owners Responsible for R6 Michael Juricek - 10/6/2016 ROS Meeting

Michael Juricek - 10/6/2016 ROS Meeting TPL-007-1 Summary R7 requires to develop a Corrective Action Plan addressing how the performance requirements will be met if through the GMD Vulnerability Assessment responsible entity determined that System does not meet the performance requirements of Table 1. Assessment performed once every five years with GMD Vulnerability Assessment Corrective Action Plans as defined in the NERC Glossary of Terms: A list of actions and an associated timetable for implementation to remedy a specific problem. Applicability: ERCOT and Transmission Planners Responsible for R7 Michael Juricek - 10/6/2016 ROS Meeting

Michael Juricek - 10/6/2016 ROS Meeting Existing Guidance for Performing GMD Analysis The NERC GMD TF has developed general guidelines for performing GMD Vulnerability Assessments that are described in TPL-007-1 : NERC Geomagnetic Disturbance Planning Guide NERC GIC Application Guide NERC Transformer Thermal Impact Assessment White Paper Michael Juricek - 10/6/2016 ROS Meeting

Michael Juricek – 10/6/2016 ROS Meeting September 28, 2016 Meeting Discussed FERC’s Order Discussed Data Requirements for GIC System Model. Reviewed List of Questions for GIC Software Vendor. Discussed Target Date for TSPs’ Data for GIC System Model. Discussed Next Activities. Michael Juricek – 10/6/2016 ROS Meeting

Next Activities for PGDTF Develop for Documentation GMD Planning Responsibilities (R1). Create GIC System Model for Geomagnetic Disturbance (GMD) Vulnerability Assessment (R2). Develop Schedule for Meeting Requirements in the Standard. Hold Meeting in October 2016 Michael Juricek - 10/6/2016 ROS Meeting

Michael Juricek - 10/6/2016 ROS Meeting Questions and Answers Michael Juricek - 10/6/2016 ROS Meeting