Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
MD#2 News & Plan Tue – Wed (19. – 20.6.) DayTimeMDEiCMP Tue06: GeV  4 TeV: Ramp for chromaticity - missed A 08:00Ramp down 10: GeV: Large.
Lot’s of time lost due to cryo problem in IR8. Major impact, therefore review of MD program… Start discussion here, please let us know your input. Will.
LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
LHC progress Report LHCC Wednesday 23 rd March 2011.
Machine development - results and plans – critical results, what’s to be done? R. Assmann 15/07/2011 R. Assmann for the LHC MD coordination team (R. Assmann,
Tuesday 17 th April 04:00 Prepare second fill for v/d Meer scans. 06:22 Stable beams, v/d Meer scans for Alice and LHCb. 13:20 End v/d Meer scans.Dump.
Status from the collimator impedance MD in the LHC Collimation team:R. Assmann, R. Bruce, A. Rossi. Operation team:G.H. Hemelsoet, W. Venturini, V. Kain,
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
Shortened program (2 days), as decided in LMC. MD program worked very well  all MD’s on plan with ~foreseen beam time. LHC in very good shape with excellent.
Draft MD Planning Thu (3.11.) DayTimeMDMP Thu05:00 Ramp down, cycle 07: GeV: Injection stability and losses – check steering constraints, define.
31/10/2011MD Planning 2011/12, MD#4 LHC Week 44 and MD Block #4 - Weekly Report - Machine Coordination: G. Arduini & R. Assmann MD Coordination: R. Assmann,
Cryo back at 17:30 Beam back at 19:00 IR2 aperture until ~03:00 Since then no beam from the SPS:  Connector problem on MKD  Connector eroded, needs to.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
MD Planning Fri – Sat (26. – 27.8.)
M.Fitterer, A.Patapenka, A.Valishev (FNAL)
Wednesday 8.9 External crossing angles:
1st LHC MD Period Started
Machine Coordinators: G. Arduini, J. Wenninger
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Wire, flat beams and beam-beam MDs in 2017
Saturday 21st April 00:33 Interlock during ramp on BLM HV
MD Report 24 June 2012 Machine coordinators: Barbara Holzer, Mike Lamont MD Coordinators: Ralph Assmann, Giulia Papotti, Frank Zimmermann MD#2 News & Plan.
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
MD25 ns - 14/12/2012 G. Arduini, H. Bartosik, G. Iadarola, G. Rumolo
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Tue :25 Beams dumped due to RF vacuum interlock
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
Thursday morning – optics correction
LHC Morning Meeting - G. Arduini
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
MD#4 Progress MD Coordinators: Giulia Papotti, Frank Zimmermann
Summary of Week 16 G. Arduini, J. Wenninger
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Lost at 12:05 to power converter (RTQX2.R1) problem
Status from the collimator impedance MD in the LHC
Mon 22/8 – Tue 23/8 00:07 stable beams #2040. Initial luminosities: 2.1x1033 cm-2s-1 18:00 Programmed dump. End of physics #2040. ~83 pb-1 in ~18 hours.
LHC Morning Meeting - G. Arduini
Mike Lamont, Jorg Wenninger
MD#2 News & Plan Tue – Wed (19. – 20.6.)
MD#4 Progress MD Coordinators: Giulia Papotti, Frank Zimmermann
450 GeV Initial Commissioning with Pilot Beam - Beam Instrumentation
Saturday 7th May Sat – Sun night
(on behalf of the LHC team)
Summary Thursday h21: Stable beams fill #1303.
Machine Tolerances in Cleaning Insertions
Sunday/Monday & :30 Stable beams. Fill #1851.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Monday 24 October hours of 25ns MD
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Scrubbing progress - 08/12/2012
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
IP8 aperture measurements (07:30-10:30)
MD Planning Fri – Sat (1. – 2.7.)
Summary for LPC (March 7th, Ralph Assmann)
LHC Morning Meeting - G. Arduini
Summary Tuesday h23: Machine closed. Precycle started.
Wednesday 23/2 Thanks CRYO!!!.
Fri :52 Stable beams fill #2536
Another Immortal Fill….
Thursday Morning/Afternoon
Tuesday 6th April 8:00 Injection studies 16:00 RF studies
Wednesday :35 : Beam lost because of trip of RCBXH3.L1
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00 450 GeV: TDI Vacuum – understand source of heating, check for HOM’s. Parasitically: UFO studies C 09:00 450 GeV: UFO studies - Understanding UFO’s and possible limitations. Parasitically: scraping setup & first tests (on other beam?) 11:00 450 GeV: Scraping for beam shape - More accurate beam models for machine protection studies and beam loss simulations (high intensity tails) 13:00 450 GeV  3.5 TeV: LR beam-beam with 25ns – Assess required crossing angle and achievable beta* (performance) with 25ns 21:00 Ramp down, cycle 23:00 450 GeV  3.5 TeV: Beam instrumentation – Improvements of LHC beam measurements. One goal: calibrated BSRT emittance data for beam1 and beam2 at 3.5TeV B Wed 07:00 Cryo Problem

H. Bartosik, B. Salvant et al. Tue 01/11 – TDI studies Aim: Measure TDI impedance (mainly transverse) Parasitically: UFO studies Measurement of tune shift vs. TDI gap for high intensity bunch (~2.5x1011 p). Measurement with multi-bunch not clean H. Bartosik, B. Salvant et al.

Tue 01/11 – TDI studies Single high intensity bunch: Tune shift with changing TDI gaps were recorded (already done but either with small intensity and/or transverse damper on). Vertical tune shift >1e-3 with a noise of 1e-4. Measurements confirm quantitative measurements on B2 in 2010, i.e. it seems there was no degradation of the transverse impedance. However, as already observed in 2010, both TDIs lead to a significant tune shift (~-8E-4 at nominal TDI injection setting for 2.6E11 p/b), corresponding to a large vertical effective impedance (first quick calculation: 3.25 MOhm/m at nominal injection setting to 5.2 MOhm/m at 3.7 mm half gap, subtracting the effect of the beta function at the location of the TDI). To be confirmed by more serious computations.

Tue 01/11 – TDI studies 50 ns beam Next steps We tried to see beam induced signals when moving the TDI in and out, but nothing interesting was seen on ADT or BBQ. The only odd observation is that the vacuum seems to be better at injection with the TDI close to the beam than far from the beam, which is the opposite of what was observed during the ramp. This should be investigated but is probably not a beam physics issue. Next steps perform same measurements for other collimators (in particular the TCTVB). Assess longitudinal impedance with TDI gap and not only the transverse effects.

Tue 01/11 – UFO studies Verification of procedure for kicking single MKI kickers and MKQ kickers with low intensity Pulsed single MKI kickers and MKQ kickers in the last injection gap without beam after injecting 1236 bunches Preliminary results from UFO buster / BLM data analysis: Often candidate UFOs after MKI pulse in Pt.2 and Pt.8 found. Sometimes even several events (cf. e.g. events at 9:40 and 9:54) Delay of first event to MKI pulse between 12.8ms and 128ms (for free fall t=sqrt(2*19mm/9.81ms^-2) = 62ms expected). No UFOs at MKQ found

Vacuum at TDI MKI T. Baer, J. Uythoven et al. MKQ

SPS MKE waveform calibration 10:37: Trip of cryogenics in point 8 Accesses Measurements of the MKE4/6 SPS extraction kicker waveform Preliminary summary: Finished calibration of MKE4 kick waveform with LHC clock. Find a 4.1 us difference wrt the calibration made with SPS clock, but the same waveform (when a 0.4 mm static offset is accounted for). What is strange is that the 54 us delay for the pilot seems to be at a different location compared to the waveform measured with the individual bunch positions at injection into the LHC...we will come back to try and investigate with INDIV or 12b B. Goddard

MD Planning Wed (2.11.) A B Day Time MD MP Wed 07:00 09:00 Ramp down, cycle 09:00 450 GeV  3.5 TeV: ATS and tight collimation settings – Squeeze in IR1&5 to 40cm beta*. Optics correction. Collide (no crossing angle). Show adequate protection with tight collimation settings. Show full protection. Provides 2.5 times higher pile-up potential… A 19:00 21:00 450 GeV  3.5 TeV: Combined ramp & squeeze - Feasibility of changing the LHC optics during the ramp. Gain ~7min (400s) per ramp initially. Higher efficiency for physics B Thu 05:00

MD Planning Thu (3.11.) B C Day Time MD MP Thu 05:00 07:00 Ramp down, cycle 07:00 450 GeV: Injection stability and losses – check steering constraints, define limits for correctors, operational procedure for more stable injection line steering B 15:00 450 GeV: Quench margin at injection – BLM thresholds required at injection, room for optimization C 19:00 450 GeV  3.5 TeV: Quench margin at 3.5 TeV – apply transverse damper method, confirm May result, longer sustained losses, identify other possible limitations (know already about BLM power supplies); If any beam left Wire Scanner Quench Test Fri 03:00 Ramp down, cycle. Access for MKA (preparation non-linear MD).

MD Planning Fri (4.11.) B A Day Time MD MP Fri 03:00 05:00 Ramp down, cycle. Access for MKA (preparation non-linear MD). 05:00 450 GeV: Non-linear dynamics – understand dynamic aperture in LHC, compare to models, experimental reference case for upgrade studies B 13:00 450 GeV  3.5 TeV: Longitudinal beam stability – Explore single and multi-bunch stability in longitudinal phase space, instability thresholds, optimal and required RF parameters 21:00 Ramp down, cycle. 23:00 450 GeV  3.5 TeV: ATS – Simultaneous squeeze to 0.1m in IR1 and IR5 with pilot beam, test of possible future upgrade optics for LHC A Sat 06:00 End of MD #4