Workshop on preparations for ANConf/12 − ASBU methodology

Slides:



Advertisements
Similar presentations
SIP/2012/ASBU/Nairobi-WP/19
Advertisements

Global ATM Operational Concept
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-35/PIA3 Improved Flow Performance through Planning based on a Network-Wide.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-10/PIA 3 Improved Operations through Enhanced En-Route Trajectories.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-85/PIA-3 Air Traffic Situational Awareness (ATSA) Workshop on preparations.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/ASBU/2012.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-86/PIA-3 Improved Access to Optimum Flight Levels through Climb/Descent.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-05/ PIA 4 Improved Flexibility and Efficiency in Descent Profiles.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-101/PIA-3 ACAS Improvements Workshop on preparations for ANConf/12.
Workshop on preparations for ANConf/12 − ASBU methodology
International Civil Aviation Organization Trajectory-Based Operations(TBO) Saulo Da Silva SIP/ASBU/Bangkok/2012-WP/25 Workshop on preparations for ANConf/12.
Airport Collaborative Decision Making (A-CDM) Saulo Da Silva
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-15/PIA 1 Improve Traffic Flow Through Runway Sequencing (AMAN/DMAN)
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-30/PIA-2 Service Improvement through Digital Aeronautical Information.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-101/PIA-3 ACAS Improvements Workshop on preparations for ANConf/12.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/2012/ASBU/Nairobi.
International Civil Aviation Organization Collaborative Decision Making (CDM) Saulo Da Silva Workshop on preparations for ANConf/12 − ASBU methodology.
Workshop on preparations for ANConf/12 − ASBU methodology
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-25/PIA-2 Increased Interoperability, Efficiency and Capacity through.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-35/PIA3 Improved Flow Performance through Planning based on a Network-Wide.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-15/PIA 1 Improve Traffic Flow Through Runway Sequencing (AMAN/DMAN)
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-102 Increased Effectiveness of Ground-Based Safety Nets SIP/2012/ASBU/Nairobi.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-84 Initial Capability for Ground-based Cooperative Surveillance SIP/2012/ASBU/Nairobi.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-105/PIA2 Meteorological information supporting enhanced operational.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-10/PIA 3 Improved Operations through Enhanced En-Route Trajectories.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
Workshop on preparations for ANConf/12 − ASBU methodology
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-86/PIA-3 Improved Access to Optimum Flight Levels through Climb/Descent.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-20/PIA-4 Improved Flexibility and Efficiency in Departure Profiles.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-30/PIA-2 Service Improvement through Digital Aeronautical Information.
Workshop on preparations for ANConf/12 − ASBU methodology
Airport Collaborative Decision Making (A-CDM) Saulo Da Silva
ASBU Methodology Summary of Block 2 and 3 Modules Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Collaborative Decision Making (CDM) Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
FF-ICE A CONCEPT TO SUPPORT THE ATM SYSTEM OF THE FUTURE
Workshop on preparations for ANConf/12 − ASBU methodology
ASBU Methodology Summary of Block 1 Modules Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
SIP/2012/ASBU/Nairobi-WP/19
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Measurement of environmental benefits Saulo Da Silva
Continuous Climb Operations (CCO) Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Global ATM Operational Concept
Workshop on preparations for ANConf/12 − ASBU methodology
Airport Collaborative Decision Making (A-CDM) Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Continuous Climb Operations (CCO) Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
Trajectory-Based Operations(TBO) Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
ASBU Methodology Summary of Block 1 Modules Saulo Da Silva
Workshop on preparations for ANConf/12 − ASBU methodology
Presentation transcript:

Workshop on preparations for ANConf/12 − ASBU methodology SIP/ASBU/2012-WP/24 B Aviation System Block Upgrades Module N° B0-35/PIA3 Improved Flow Performance through Planning based on a Network-Wide view Workshop on preparations for ANConf/12 − ASBU methodology (Bangkok, 14-18/Nadi, 21-25 May 2012)

ICAO SIP 2012- ASBU WORKSHOP Module N° B0-35 Improved Flow Performance through Planning based on a Network-Wide view Summary Air Traffic Flow Management (ATFM) is used to manage the flow of traffic in a way that minimizes delay and maximizes the use of the entire national airspace. ATFM can regulate traffic flows involving departure slots, smooth flows and manage rates of entry into airspace along traffic axes, manage arrival time at waypoints or FIR/Sector boundaries and re-route traffic to avoid saturated areas. ATFM may also be used to address system disruptions including crisis caused by human or natural phenomena. Main Performance Impact KPA-01 Access & Equity - KPA-02 Capacity - KPA-04 Efficiency KPA-05 Environment - KPA -09 Predictability Operating Environment/Phases of Flight Pre-flight phases, some action during actual flight. Applicability Considerations Region or sub-region Global Concept Component(s) DCB – Demand-Capacity Balancing TS – Traffic Synchronisation AOM – Airspace Organisation and Management Global Plan Initiatives GPI-1 Flexible use of airspace GPI-6 Air traffic flow management GPI-8 Collaborative airspace design and management Global Readiness Checklist Status Standards Readiness 2013 Avionics Availability N/A Ground Systems Availability Ready Procedures Available Operations Approvals ICAO SIP 2012- ASBU WORKSHOP

ICAO SIP 2012- ASBU WORKSHOP Module N° B0-35 - Baseline It is difficult to describe an exact baseline. The need for ATFM emerges as traffic densities increased This need is now spreading progressively over all continents Even where overall capacity is not an issue, the efficient management of flows through a given volume of airspace deserves a specific consideration ICAO SIP 2012- ASBU WORKSHOP

Module N° B0-35 – Change Brought by the Module In order to regulate flows, ATFM may take measures of the following nature: Departure slots; Rate of entry; Requested time; Miles-in-trail figures; Re-routing; Sequencing of flights; Delaying of specific flights on the ground by a few minutes These measures are not mutually exclusive ICAO SIP 2012- ASBU WORKSHOP

Module N° B0-35 – Intended Performance Operational Improvement Access and Equity Improved access by avoiding disruption of air traffic in periods of demand higher than capacity; ATFM processes take care of equitable distribution of delays. Capacity Better utilisation of available capacity, network-wide; ability to anticipate difficult situations and mitigate them in advance. Efficiency Reduced fuel burn due to better anticipation of flow issues; Reduced block times and times with engines on. Environment Reduced fuel burn as delays are absorbed on the ground, with shut engines; rerouting however generally put flight on a longer distance, but this is generally compensated by other airline operational benefits. Participation by the ATM community Common understanding of operational constraints, capabilities and needs. Predictability Increased predictability of schedules as the ATFM algorithms tends to limit the number of large delays. Safety Reduced occurrences of undesired sector overloads. CBA The business case has proven to be positive due to the benefits that flights can obtain in terms of delay reduction. ICAO SIP 2012- ASBU WORKSHOP

Module N° B0-35 – Necessary Procedures (Air & Ground) An ICAO manual on ATFM is available in draft version and need to be completed and approved. US/Europe experience is enough to help initiate application in other regions. New procedures are required to link much closer the ATFM with ATS in the case of using miles-in-trail or Arrival management or Departure management ICAO SIP 2012- ASBU WORKSHOP

Module N° B0-35 – Necessary System Capability Avionics No avionics requirements Ground Systems When serving several FIRs, ATFM systems are generally deployed as a specific unit, system and software connected to the ATC units and airspace users to which it provides its services. Regional ATFM units have been the subject of specific developments. ICAO SIP 2012- ASBU WORKSHOP

Module N° B0-35 – Training and Qualification Requirements Flow managers in the flow management unit and controllers in ACCs need specific training and airline dispatchers using the remote flow management information or applications need training. Training in the operational standards and procedures are required for this module. Likewise, the qualifications requirements are identified in the regulatory requirements ICAO SIP 2012- ASBU WORKSHOP

ICAO SIP 2012- ASBU WORKSHOP Module N° B0-35 – Regulatory/standardization needs and Approval Plan (Air & Ground) Regulatory/Standardization: New standards and requirements is required for standard ATFM messages Approval Plans: To Be Determined. ICAO SIP 2012- ASBU WORKSHOP

Module N° B0-35 – Reference Documents Standards: TBD Procedures: TBD Guidance Material ICAO Global Collaborative Decision Making (CDM) Guidelines (under development). Approval Documents ICAO SIP 2012- ASBU WORKSHOP

Module N° B0-35 Implementation - Benefits and Elements Improved Flow Performance through Planning based on a Network-Wide view Benefits: Access, Capacity, Efficiency, Environment, Participation by the ATM community, Predictability and Safety Element: Collaborative ATFM To be reflected in ANRF ICAO SIP 2012- ASBU WORKSHOP

ICAO SIP 2012- ASBU WORKSHOP