Philip Bambade, Andrei Seryi, Toshiaki Tauchi

Slides:



Advertisements
Similar presentations
Brett Parker* BNL-SMD *For the ATF2 Superconducting Magnet Upgrade Collaboration Update on SC Magnets and Schedule.
Advertisements

-brief report of October runs and some inputs for the Nov/Dec planning – Nobuhiro Terunuma, KEK, ATF ATF session on LCWS13, Tokyo Univ., Nov. 13, 2013.
ATF2 Progress Report For CLIC Workshop Kiyoshi KUBO.
ATF2 Status and Plan K. Kubo ATF2, Final Focus Test for LC Achievement of 37 nm beam size (Goal 1) – Demonstration of a compact final focus.
1.Beam Tuning Simulation 2.IP Beam Position Stability 2-1 ) Magnet Vibration 2-2 ) IP position jitter subtraction for 2 nd bunch with FONT feedback 2-3.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett*, Talitha Bromwich, Glenn Christian, Michael Davis, Colin Perry.
News from ATF2 Frank Zimmermann KEK visit, February 2012 Thanks to P. Bambade, M. Barnes, A. Faus-Golfe, K. Kubo, S. Kuroda, T. Naito, T. Okugi,
Discussion on Milestone and schedule Toshiyuki Okugi ATF2 commissioning meeting 1 / 7 / 2009.
ATF2 test facility Andrei Seryi, SLAC for the ATF2 team to be presented to ILC Accelerator Advisory Panel April 19, 2009.
Accelerator R&D on LC - Activities of ATF & STF - 1. Introduction 2. ATF 3. STF 4. Summary Seiya Yamaguchi, KEK The US/Japan Collaboration in High Energy.
ATF2 Javier Resta Lopez (JAI, Oxford University) for the FONT project group 5th ATF2 project meeting, KEK December 19-21, 2007.
Personal strategy for ATF2 beam operation in 2009 Toshiyuki OKUGI 2009 / 7 /22 ATF2 weekly meeting.
ATF2 commissioning in Autumn 2009 for discussion Philip Bambade LAL & KEK LCWS09 BDS session Albuquerque, New Mexico October 1, 2009 on behalf of the commissioning.
ATF2 ILC Final Focus Test Beam Line at KEK-ATF References : ATF2 Proposal, KEK Report ATF2 Proposal Vol.2, KEK Report ホームページ:
ATF2 optics … 1 3 rd Mini-Workshop on Nano Project at ATF ATF2 optics, tuning method and tolerances of initial alignment, magnets, power supplies etc.
UK/EU Plans for ATF2 G.A. Blair ATF2-IN2P3-KEK kick-0ff meeting, Annecy, 8 th October 2006 Overview EUROTeV UK.
New IP chamber for ATF2 goal 2 Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay, France ATF2 Technical Review KEK, 3-4.
June 30, th ATF2 Project Meeting Andrei Seryi for the ATF2 team May 2010 Continuous Run Operation.
Continuous Run in May K.Kubo. Final Focus Test Line IP; ~40 nm beam ATF Linac (1.3 GeV) ATF Damping Ring (140 m) Extraction Line Photo-cathode.
Summary of Commissioning and Tuning session Philip Bambade LAL-Orsay 5 th ATF2 project meeting KEK, 21 December 2007.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
ATF-II Review by GDE Marc Ross, (SLAC) For GDE Project Managers: Nick Walker and Akira Yamamoto 24 January, th ATF2 Collaboration Meeting.
Feedback On Nanosecond Timescales (FONT): Robert Apsimon, Philip Burrows, Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Davide Gamba,
Development of a Low-latency, High-precision, Intra-train Beam Feedback System Based on Cavity Beam Position Monitors N. Blaskovic Kraljevic, D. R. Bett,
Wakefield Calculations for the ATF2 Beamline A. Lyapin, Wakefield Calculations for the ATF2 Beamline 1 S. Boogert, J. Snuverink (JAI/RHUL, UK)
4 th Meeting of the ATF Technical Board and System/Group Coordinators Cockcroft Institute Daresbury, UK May, 2007.
Highlights and discussion at LAL FKPPL & FJPPL “Toshiko Yuasa” workshop Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay,
Technical Board “issues” Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay, France ATF2 Technical Review KEK, 3-4 April.
8 th Meeting of the ATF TB/SGC 11 June Hardware Status Fast Kicker – FID pulsers have had a reliability problem: this appears to have been solved.
ATF2 Kiyoshi KUBO Accelerator Test Facility (ATF) at KEK ATF – Designed as a prototype of damping ring and injector of LC – Achieved low vertical.
Brett Parker* BNL-SMD *For BNL Superconducting Magnet Division and the ATF2 Superconducting Magnet Upgrade Collaboration ILC Superconducting Final Doublet.
1 FONT R&D status Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford University.
ATF2 Commissioning Toshiyuki Okugi 2008 / 7 /9 ATF2 beam commissioning meeting, KEK.
Low emittance tuning in ATF Damping Ring - Experience and plan Sendai GDE Meeting Kiyoshi Kubo.
Greeting for 10 th ATF2 project and TB/SGC joint meeting 1.
Status of ATF Collaboration The unique test facility for ILC with a low emittance beam. Junji Urakawa, KEK LCPAC at KEK
July 2, th ATF2 Project Meeting Philip Bambade, Andrei Seryi, Toshiaki Tauchi Summary for TB.
Global Design Effort Introduction and goals of the meeting Andrei Seryi, Toshiaki Tauchi Fifth ATF2 Project Meeting December 19-21, 2007.
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
Initial beam size commissioning for ATF2 T.Okugi 3rd ATF2 Project Meeting, KEK 12/ 19/ 2006.
IP instrumentation configuration for Autumn 2010 ATF2 runs Toshiyuki OKUGI, KEK 2010 / 7/ 1 10 th ATF2 project meeting.
ATF2 Tuning Summary Nov & Dec 2010 Glen White, SLAC 11 th ATF2 Project Meeting, SLAC Jan
ATF2 Software Review LAL June SHORT SUMMARY - Philip Bambade ATF2 weekly meeting July
Task Lists of ATF2 commissioning Toshiyuki Okugi ATF2 Project Meeting 12 / 17 / 2008.
ATF2: Summary of Scheduling Strategy Session Grahame Blair Feedback and Feedforward systems Fast Kicker for ILC bunch train structure Laser-wire Shintake.
ATF2 beam operation status Toshiyuki OKUGI, KEK The 9 th TB&SGC meeting KEK, 3-gokan Seminar Hall 2009/ 12/ 16.
Summary of Tuning, Corrections, and Commissioning ( Short summary of ATF2 meeting at SLAC in March 2007 ) and Hardware Issues for beam Tuning Toshiyuki.
ATF2 Software Review LAL June 2008 Philip Bambade & Glen White ATF2 weekly meeting June
1 Feedback On Nanosecond Timescales (FONT): Philip Burrows Neven Blaskovic, Douglas Bett, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John.
Collaborations on Beam Instrumentation R&D – A personal view – Manfred Wendt Fermilab 11/21/2008Project X Instrumentation WG1.
Technical Board Summary Preliminary Philip Bambade Laboratoire de l’Accélérateur Linéaire Université Paris 11, Orsay, France ATF2 project meeting, Technical.
ILC R&D Activities at KEK Superconducting Linac Development Beam-handling Technology Development.
Status of ATF2 linear collider focus prototype emphasizing France-China joint contributions Philip Bambade Laboratoire de l’Accélérateur Linéaire Université.
ATF2 Status Background for the installation planning of Collimator
Simulation for Lower emittance in ATF Damping Ring Kiyoshi Kubo Similar talk in DR WS in Frascati, May 2007 Most simulations were done several.
ATF2 Status N.Terunuma, KEK
Fast Beam Collision Feedbacks for luminosity optimisation at next-generation lepton colliders Philip Burrows John Adams Institute Oxford University.
Special ATF Session - ATF/ATF2 day on 28th September -
Expected hardware status and Priority of the commissioning task
Glen White, SLAC Jan th ATF2 Project Meeting, KEK
Emittance Diagnostics
13th ATF2 Project Meeting Summary
Oversea collaborators
report from 12th ATF TB & SGC meeting and trip to KEK
ATF2 IP Tuning Task Simulation Updates
Summary of the ATF2 project meeting at LAL (Jan.13-15, 2016)
Junji Urakawa (KEK) for ATF International Collaboration
Updates on IR and FF for super-B factory
Progress towards nanometre level beam stabilisation
ATF ICB meeting, LCWS08, UIC, Chicago, 11/18/2008
Presentation transcript:

Philip Bambade, Andrei Seryi, Toshiaki Tauchi Summary July 2, 2010 10th ATF2 Project Meeting Philip Bambade, Andrei Seryi, Toshiaki Tauchi

Sessions, 1-st day … Intro Instrumentation Greetings, Junji Urakawa Goal of the meeting, Toshiaki Tauchi Instrumentation Ring BPM upgrade & Orbit analysis, Nathan Eddy, Eliana Gianfelice-Wendt FONT 5 status, Glenn Christian , et al C/S-band cavity BPMs, Stewart Boogert , et al IPBSM status, Masahiro Oroku , et al IPBPM status, Youngim Kim , et al ATF2/Extraction line Laserwire, Alexander Aryshev , et al Stripline Fast kicker, Takashi Naito , et al ATF2 extraction line Stripline BPM upgrade, Glen White , et al Multi OTR, Angeles Faus-Golfe, Glen White, et al

… Sessions, 1-st day Beam tuning EXT beam measurements and corrections, Mark Woodley Beam-Based Alignment, Eduardo Marin Beam Orbit Feedbacks in EXT and FFS, Glen White IP tuning with multiknobs, Glen White May 2010 Continuous Run Operations, Andrei Seryi Re-Alignment of QF1FF, Ryuhei Sugahara Plans for continuous run operations in 2010, Toshiyuki Okugi

Sessions, 2-nd day … Toward the first goal IP instrumentation configuration and FD field quality issues for Autumn 2010 ATF2 runs, Toshiyuki Okugi Review and status of software tools for ATF2, Shigeru Kuroda Background study plan toward goal 1 in 2010-2011, Marc Verderi Priority issues to study for goal 1, Glen White Discussion Future plan after April 2013 International workshop on physics in intense field, Tohru Takahashi Permanent Q at IP as well as at the upstream, Yoshihisa Iwashita KEK cryogenics system for SC-FF, Nobuhiro Kimura American regional team recommendation for the focus of efforts with respect to superconductive final doublet development, Andrei Seryi

… Sessions, 2-nd day Toward the second goal by end of March 2013 ATF DR beam stability (including multi-bunch), needed studies and improvements, Kiyoshi Kubo Fast bicker performance and plans, Takashi Naito IPBPM plans, YoungIm Kim FONT and integrated performance, Philip Burrows Discussion on the schedule plan or road map

Goal of the meeting

Goal of the meeting

Goal of the meeting

Goal of the meeting

Instrumentation Ring BPM upgrade

Instrumentation Ring BPM upgrade

Instrumentation Ring BPM upgrade

Instrumentation Ring BPM upgrade

Instrumentation, FONT 5 status

Instrumentation, FONT 5 status With the current ATF2 setup (existing kicker system and 3 bunches) we occasionally see good correlations, usually after a lot of tuning

Instrumentation, C/S-band cavity BPMs

Instrumentation, C/S-band cavity BPMs

Instrumentation, C/S-band cavity BPMs

Instrumentation, IPBSM status

Instrumentation, IPBSM status

Instrumentation, IPBPM status Low-Q IP BPM electronics: latency : 17 ns; Sensitivity : -80 dBm; Expected resolution : 10 nm; Desired resolution : 2 nm (More development is required) Position sensitivity : 64.7 DDC/μm

Instrumentation, EXT Laserwire

Instrumentation, EXT Laserwire

Instrumentation, Fast kicker

Instrumentation, Fast kicker

Instrumentation, EXT Stripline BPM upgrade

Instrumentation, Multi-OTR May 2010: the 4 OTRs were installed in the EXT line

Instrumentation, Multi-OTR OTR Beam Tests - Target Damage Seen And was then understood

Tuning, EXT emittance M. Woodley

Tuning, BBA

Tuning, BBA

Tuning, Orbit feedbacks

Tuning, discussion of continuous run Best result of continuous tune week: May 17-21, 2010 Yoshio Kamiya and Shintake monitor group. Modulation Depth = 0.87 @ 8.0 deg. mode Beam Size is 310 +- 30 (stat.) +0-40 (syst.) nm First dedicated attempt at tuning ATF2 beamline in the week of May 17-21 was proven to be very useful 300nm vertical beam size at IP waist achieved Factor of ~4 from the intermediate “ILC scaled” milestone of ~80nm The 300nm size measured by 8deg mode and reproduced by measurement with 30deg BSM mode Improvements discussed & some being implemented

Cont. run: Identified issues, ideas & prospects Need to ease “jumping” from 8deg to 30deg mode Can we enlarge angle for 8ded mode to ~10deg? (NO) Use beta-squeeze to jump between modes, but ensure in advance that beta-squeeze works within single BSM mode (BBA for quads done, etc) Need to reduce drift (increase) of beam size (both e-beamline & laser lines issue) Final doublet mounting & alignment precision (rotation) Additional possibilities for tuning (not yet tried) Minimize sigma_x from time to time Measure & check chromaticity (& verify values of sextupoles) Analysis and correction of critical R matrix elements Apparently need a more handy online tool to quickly verify how various knobs, suggested to be tried, are expected to act This may become a more comprehensive online model with guesstimated errors, which would be gradually reduced, based on measurements and analysis

Tuning, QF1 realignment Discussion of KEK and SLAC colleagues followed by email, recommendation is being prepared

Tuning, plans for Cont Oper Discussions of FD issues (rotation, strength) and IP-BPM installation are ongoing

Compatibilities, draft W0 W1 W2 W3 W4 W5 W6 W7 W0 Prep for fast kicker W1 (LCWS) Fast kicker W2 DR multi-bunch stability FONT W3 Laser wire Tuning software tests BSM tests W4 Mini-continuous run Other R&D W5 Laser wire Any other R&D W6 Continuous run only W7 Any R&D Project meeting

Summary of 2nd day T. Okugi

Summary of Collaboration discussion A workshop to review software tools’ status ?

Summary of Collaboration discussion M. Verderi

Summary of Collaboration discussion M. Verderi

Summary of Collaboration discussion G. White

Summary of Collaboration discussion G. White

Summary of Collaboration discussion

Summary of Collaboration discussion

Summary of Collaboration discussion

Summary of SC FD This recommendations was prepared by ART team, discussed and accepted at the ATF2 Project Meeting and will be presented to the TB

Summary of Collaboration discussion K. Kubo

Summary of Collaboration discussion T. Naito

Summary of Collaboration discussion T. Naito

Summary of Collaboration discussion Y.I. Kim

Summary of Collaboration discussion P. Burrows

Summary of Collaboration discussion P. Burrows

Messages from Suzuki-san Most of R&D need to be done by 2012 Need new proposals after 2012 One proposal relater to… ATF and STF => a proposal of mini LC at KEK as first step toward ILC

Discussion of future collaboration organization

Discussion of future collaboration organization Philip’s The audience generally supported this direction. These ideas will be further developed.

Summary of Collaboration discussion ART & SLAC (Glen W., Andrei S.) ART continues support of ATF/ATF2. Consider high priority. (FNAL – Ring BPMs, BNL – ATF2 FD (funding & schedule discussed), SLAC (…)) Ideas of increased participation at SLAC (IP-BPMs, maybe DR dynamics and feedbacks?) CERN (Frank Z.) Continue support; Visitors; Tuning & commissioning; Low-b; re-opt FF with Mapclass; BBA; Goals for 2012 depend on achievement of goals; (Frank: Need prioritization !) CERN Council opens doors for greater integration KNU (Eun-San Kim) Graduate student at ATF/ATF2; Hope to make R&D funds for Korea-KEK collaboration work UK (Stewart B., Andrei S.) A lot of contribution to instrumentation, commissioning, etc; recognize importance of ATF/ATF2; discussion of the way to keep future engagement KEK (Junji U.) Future research programs: High field physics; THz micro-wave beam for laser acceleration; gg collider R&D; super-FD r&d to make smaller beam size; Need common fund from collaborative institutes for Operation – to be proposed to ICFA

Summary Good progress toward ATF/ATF2 goals Next steps, schedules and priorities have been discussed Future directions of the research program are being discussed – accelerator science & also physics program ATF Collaboration is discussing new ways how such facilities can be supported and may pioneer their implementation