8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
LHC progress Thursday 30 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Monday 4 th to Friday 8 th Technical stop  Coordination: Katy Foraz  Machine back to Operations Friday evening on schedule Major cryogenics intervention.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
LHC Progress Friday 30 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
LHC progress Sunday 3rd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
– Machine closed. Ramp for powering tests & pre-cycle – Pilots through nominal cycle up to collisions. Measure chroma during squeeze. Check dump of pilots.
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
Wednesday
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Saturday 24 March 2012.
Wednesday September 14th
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Tuesday Fill lost #1855 at 7:28 due to the trip of RQX.R1. This was traced to a software bug in the FGC… The Class 51 (LHC_PC) FGC software has been upgraded.
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
LHC Status Wed Morning 13-April R. Assmann, B. Holzer et al
Monday fill with 1092 bunches (6 h stable beams)
Monday 11/07: Recovery Plenty of accesses.
Saturday 30th June - Sunday: Rocky !
Last 24 hours RQ5.L1 RQ4.L1 RF trip Line4B LHC status.
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Tue :25 Beams dumped due to RF vacuum interlock
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
Thursday morning – optics correction
Summary of Week 11: 14 – 21 March
LHC Morning Meeting - G. Arduini
Wednesday 31 October: Morning
Mon 22/8 – Tue 23/8 00:07 stable beams #2040. Initial luminosities: 2.1x1033 cm-2s-1 18:00 Programmed dump. End of physics #2040. ~83 pb-1 in ~18 hours.
Saturday 2/4/ :00-09:00 Problems with SPS:
Friday March 4th 08h32: Access for beam dump system.
LHC Morning Meeting - G. Arduini
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
Week 35 – Technical Stop and Restart
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
Planning at 5 o’clock meeting Friday
Friday morning 10:30 Optics measurements and corrections.
Wire almost entirely through beam before BLM triggers dump
Tuesday 9th November 10:02 Fill beams dumped
Friday Morning 7:30 injection for fill 2908
Yesterday morning Held 1647 for a while – SPS kicker problem
Aims for the week Recover from technical stop and precycle at 10A/s
Monday 24 October hours of 25ns MD
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Tuesday morning 08:30-09:00 Squeeze with probe.
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
Saturday Wire scans at end of fill 1253 B1H : 4.2 B1V : 4.3 B2H : 5 B2V : 7.2 Beams dumped (after ~14h of collisions) Some issues during refill.
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Saturday :42 stable beams fill 3541
LHC Morning Meeting - G. Arduini
LHC - Week 38 Technical stop: Katy Foraz
Summary Tuesday h23: Machine closed. Precycle started.
Wednesday 23/2 Thanks CRYO!!!.
Thursday
Saturday 24 September 2011.
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Wednesday h18: 228b fill lost just before start of ramp.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Friday 15th February - morning
Another Immortal Fill….
Monday 27th August & night
Saturday 28th 08:17 Fill #1812: Stable beams, peak luminosity ~1.1x1033 cm-2s-1 19:00 Go to adjust for RF-checks; Record fill lumi of 31.7 pb-1 for CMS.
Saturday 26 November 2011.
Tuesday
HI2011 Commissioning Status
Presentation transcript:

Saturday 9.7.2011 Coordinators weekend: Mike Lamont, Eva Barbara Holzer 7:00 – 9:13 Access Point 8 for QPS RQD A78 7:24 MKB (dilution kickers) in fault B1 & B2  reset by piquet SIS positioning wire on IR8 triplet out of tolerance (why?)  changed WPS limits 8:05 cryo is back MCS check on MKD settings failed, called piquet  hardware setting off (not by much)  changed LSA values to be able to continue; need access to change hardware setting.

Saturday cont. 12:22 MKI B1 tripped during soft-start (MKISS) Access to replace a switch, but in the end not needed for MKI. It was reconditioned by several soft-starts at 14:22 (M. Barnes: probably insufficient conditioning of a new switch) A modified soft-start procedure would have been desirable (more gradual change), but not possible due to absence of experts (RBAC role holders) Access used by Alice and CMS 16:10 Access finished 16:52 update of LBDS energy tracking tables Shift summary: *) Cryo conditions were recovered at 8:05am. *) In the meantime we were in access in S78 for an energy extraction problem on RQD/F S78. The remaining HWC tests on the 60 A circuits in 78 could only be done after the intervention due to the global protection mechanism. Access was finished at about 9:10. Otherwise: *)Survey wires at triplet R8 were out of tolerance. Updated the interlock threshold. Did not investigate whether they triplet had been really moved. *) The hardware settings for two MKD generators of beam 2 are not correct. Can run like this for the time being. Needs to be modified at some point however. Access of 2-3h. *) The switch change at the MKI B1 caused the kickers to trip during the softstart. After a couple of trials it was decided with the piquet to access and change the new switch again. Access was prepared. It turned out however later on that the switch probably just needed more conditioning via more softstarts or an extended softstart. It seems to be OK now. *) CMS and ALICE profited from the access. *) Precycle started.

Evening 17:30 pilot injection: Optimization at 450 GeV (orbit, tune, chromaticity, RF phasing) Instrumentation: BPM calibration (phasing-in); Set-up of BSRT and abort gap (injection energy) F. Roncarolo Temporary injection line steering (SPS orbit to be corrected) 19:40 Trip of RQ10.L1B2 Dry ramp for testing before access  which verified that the new LBDS energy tracking tables are OK access afterwards: 22:21 water flow increased RQ10, reset OK Water flow generally too low for quadrupoles? MKI thresholds for IQC updated (first iteration) Etienne Carlier 21:36 RQ6.L8B1 and RQ6.L8B2 (same fault as the RQ10: “EXTERNAL DC CABLE WATER FLOW”)  reset ok 22:42 UJ14 patrol lost: problem with access doors

Night 1:00 machine closed 1:37 pilot injection Optimizatrion of orbit, tune chromaticity, RF phasing Ramp 2:24 Beams dumped at top energy, RQ4.R6B2 tripped: again the “external DC cable water flow” Injection test for MKI - IQC limits (inject and dump 10 times) Ramp – squeeze Problem with IR steering to find collisions in Alice  in the end used LUCID_EVENTOP_False detector as it is the most sensitive for ATLAS Used BSC_MBALL_false for CMS Alice and LHCb could not be optimized for collisions Operator dump and reinjection for 450 GeV studdies

To be checked Actual trim program and lumi scan application not working  already fixed this morning by Pablo Pera Mira Injection oscillations and SPS orbit Water flow for quadrupoles Loading of the ADT settings BPM crate: cfv-sr1-bpmb2la

Chromaticity during injection and first ramp

Tune and Chromaticity during second ramp

Second ramp: tune and orbit feedback trims

Collision orbit wrt reference

Planning Ramp 2 pilots (collapse separation bump to zero in Alice and check if interlocks are too tight) Verification tests: TCDQ and TCSG relative position Beam presence flag intensity limit Beam Dump (inject and dump mode) Asynchronous dump 450 GeV B2 (pilot or 1-2 nominal bunches) Pilot + 2 nominal bunches 1 hour in stable beams (ideally) Followed by loss maps at 3.5 TeV: H, V and longitudinal -500 Hz loss maps at injection 48 bunches per beam; new fill pattern for “satellite collisions in ALICE” (MKI pulse length might need increasing); keep in stable beams for 3-4 hours OR OR