NPRR 816 / Vendor Index Definitions

Slides:



Advertisements
Similar presentations
1 Appeal to ERCOT Board Regarding Use of Fuel Oil Index Price (FOIP) Larry Gurley TXU Wholesale June 19, 2007.
Advertisements

RCWG Update to WMS April 9, VCMRR-VC for Cancellation of RUC Committed Resources Paragraph (3) of Nodal Protocol Section regarding Cancellation.
NERC LTRA Update / CDR Capacity Counting Issues
Solution to Assignment 5: Interest Rate Futures Appendix- More Explanation 1 2.IMM Index = – Yield IMM stands for International Monetary Market.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes January 28, 2009 WMS Meeting.
Guidelines for Verification of Resource Specific Fuel Adders RCWG Paul Vinson.
Emission Update Verifiable Cost Task Force August 21, 2008.
Presentation to WMS Regarding PRR 731- Fuel Oil Index Price (FOIP) Larry Gurley July 18, 2007.
NPRR514, Seasonal Generation Resource Wholesale Market Subcommittee April 12, 2013 Amanda Frazier.
RCWG Update to WMS July 10, General Update Agenda Items for Today: Fuel Adder NPRR 485-(no vote) Variable O&M for Technology Types (vote) Seasonal.
Discussion of Reliability Must-Run (RMR) Protocol Provisions ERCOT Technical Advisory Committee November 6, 2002.
Quick Start Resource – Payment for Start-Up at less than LSL Current NPRR language: ( 8) If a QSGR comes On-Line as a result of a Base Point less than.
Discussion of Fuel Oil Price (FOP) Bill Barnes TPTF 2/5/2008.
MCWG Update to WMS 08/14/2013. MCWG Update to WMS General Update -July 31 st Joint MCWG/CWG Meeting Review NPRRs All operational except – NPRR 552 – Additional.
RCWG Update to WMS July 11, Alternatives to Address Negative Prices At its June meeting, WMS directed RCWG to bring back something to vote on. RCWG.
Resource Cost Working Group October 7, 2015 WMS Update.
Resource Cost Working Group December 2, 2015 WMS Update.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Nodal Verifiable Costs Process WMS Meeting May 15, 2007 Ino.
Direct Load Control Update Betty Day Manager of Load Profiling and Data Aggregation February 25, 2003 Retail Market Subcommittee.
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 8, 2008.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee January 6, 2010.
Direct Load Control Update Betty Day Manager of Load Profiling and Data Aggregation February 25, 2003 Retail Market Subcommittee.
ERS Overview of Upcoming Changes.  Procedure Changes – ERS Generator Resources  Reporting Requirements – ERS Load Resources with Back-Up Generators.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs for Nodal WMS Meeting.
Profiling Working Group 1 PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair Ed Echols Of Oncor ERCOT PWG Vice Chair for COPS Meeting.
1 Review of Minimum Current Exposure (MCE) as revised by NPRR639 Mark Ruane Director Settlements, Retail and Credit TAC July 30, 2015 ERCOT Public.
Nodal Credit Monitoring and Management – Business Requirements ERCOT CREDIT Department September 28, 2006.
Utilization of Fuel Costs in Ercot Markets Ino González RCWG Meeting 2/24/2016.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes November 12, 2008 VCWG Meeting.
Revisions to Credit Exposure Calculations by using Electricity Futures Prices Suresh Pabbisetty, FRM, ERP, CQF, CSQA. Lead Technical Analyst, Credit May.
Prospects For Recovery: An Economic Update Karr Ingham Petroleum Economist Texas Alliance of Energy Producers Webinar, May 24, 2016
Market Credit Working Group update to the Wholesale Market Subcommittee 3/02/
MCWG Update to WMS 3/9/2010. Exposure / Collateral Update Nodal Total Potential Exposure reported by ERCOT as of 1/31/11 remains less than Zonal Estimated.
Commercial Operations Subcommittee (COPS) Update to TAC 4/28/2016
Project Update and Summary of Project Priority List (PPL) Activity April 14, 2016.
Interim Fuel Factor Adjustment and Surcharge for Under-Recoveries
bp.com/statisticalreview #BPstats
Fuel Cost Components for Resource Mitigation
Fuel Cost Components in the Fuel Adder
2017 Seasonal Adjustment Factors
Protocol Revision Subcommittee
Exceptional Fuel Costs in LMP
Fuel Cost Components in the Fuel Adder
Interim Fuel Factor Adjustment and Surcharge for Under-Recoveries
TAC Report to the ERCOT Board
Resource Cost Working Group
Verifiable Cost Working Group (VCWG) Update
August 25, 2016 TAC Update to COPS
General Overview Of Resource Costs
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS)
Fuel Cost Components in the Fuel Adder
Market Credit Working Group update to the Wholesale Market Subcommittee 9/27/2017.
Ancillary Service Trades and Ancillary Service Settlement
RMR Update November 6, /05/2002.
Resource Cost Working Group
NYMEX Diesel & Gasoline Metropolitan Nashville Board of Education
Load Distribution Factor Calculation for Market Applications and Studies a Presentation for NATF 9/21/ NATF 1 Texas Nodal.
A Midsummer Night’s DREAM
Project Update and Summary of Project Priority List (PPL) Activity
NPRRs NPRR654 Discontinue Ancillary Service Requirement Methodology Assessment Report. This Nodal Protocol Revision Request (NPRR) proposes the discontinuation.
NPRR829 Incorporate Real-Time Telemetered Net Generation for Non-Modeled Generation into the Real-Time Liability Estimate ERCOT PRS Meeting May 11, 2017.
Administration of a FIDIC Contract - Award to Commencement -
September Protocol Transition Plan
Review of System Alerts
Commercial Operations Sub-Committee Update to TAC
OFFICE OF THE CITY CLERK JULY 24, 2017 UPDATE REGARDING THE CALIFORNIA VOTER PARTICIPATION RIGHTS ACT (CVPRA) AND THE STATE ATTORNEY GENERAL’S.
Electricity Procurement Options
Statistical Analysis of Commodities Futures Prices
Low-Income Energy Assistance In FY 2009 & The Short Term Energy Outlook October, 2008.
Presentation transcript:

NPRR 816 / Vendor Index Definitions WMS April 5, 2017

FIP and FOP Vendor Selection ERCOT’s existing contract with Platt’s for FIP and FOP index prices expires August 25, 2017. On January 19, 2017 ERCOT issued Request for Proposal for Natural Gas and Fuel Index Prices (1-17 JT) to identify potential vendors. The RFP is included with meeting materials. Responses were received from Platt’s and Argus. ERCOT is in the process of evaluating the responses and wishes to provide appropriate transparency to stakeholders.

FIP Current Protocol Section 2 definition Fuel Index Price (FIP) The midpoint or average of the daily index prices for fuel for each Operating Day for the Houston Ship Channel area (Houston Ship Channel), expressed in dollars per million British thermal units ($/MMBtu). ERCOT shall issue a Market Notice disclosing the name of the ERCOT-selected source for the average daily index prices used to calculate FIP. In the event that the ERCOT-selected index becomes unavailable, or ERCOT determines that the index has become unsuitable for the intended purpose, ERCOT may select a substitute index source. ERCOT shall issue a Market Notice disclosing its intent to use a substitute index source and the name of the substitute index source at least 60 days prior to the beginning of its use, or as soon as practicable.

Vendor Fuel Definitions - FIP Platts Gas Daily (publication) Argus equivalent is Houston Ship Channel

FOP Current Protocol Section 2 definition Fuel Oil Price (FOP) An average of the daily index prices for fuel oil for each Operating Day, plus five cents per gallon, for U.S. Gulf Coast, Houston pipeline No. 2 oil, converted to dollars per million British thermal units ($/MMBtu). The conversion is 0.1385 MMBtu per gallon. The effective dates for daily index prices shall be as indicated in the ERCOT-selected index. In the event, at the time of settlement or calculation of generic costs, that the effective price for a particular Operating Day is not available, the effective price for the most recent preceding Operating Day shall be used. ERCOT shall issue a Market Notice disclosing the name of the ERCOT-selected source for the average daily index prices used to calculate FOP. In the event that the ERCOT-selected index becomes unavailable, or ERCOT determines that the index has become unsuitable for the intended purpose, ERCOT may select a substitute index source. ERCOT shall issue a Market Notice disclosing its intent to use a substitute index source and the name of the substitute index source at least 60 days prior to the beginning of its use, or as soon as practicable.

Vendor Fuel Definitions - FOP Platts OilGram (publication) HEATING OIL (No. 2) US Gulf Coast Pipeline assessments: Platts US Gulf Coast pipeline assessments reflect product moving on the Colonial Pipeline with input at Pasadena, Texas. Pipeline assessments reflect southern grade products on the Colonial Pipeline. Argus equivalent is Colonial Pipeline Heating Oil 77 Cycle54

RMR Cost Update Questions