Power Couplers, HOM Couplers and Tuners for the XFEL

Slides:



Advertisements
Similar presentations
Overview of SMTF RF Systems Brian Chase. Overview Scope of RF Systems RF & LLRF Collaboration LLRF Specifications for SMTF Progress So Far Status of progress.
Advertisements

Tuning system requirements
Cavity Technical Specification IWLC2010 WG3 industrialization session H. Hayano Geneva,Oct.2010.
SLHC-PP – WP7 Critical Components for Injector Upgrade Plasma Generator – CERN, DESY, STFC-RAL Linac4 2MHz RF source Thermal Modeling Gas Measurement and.
SPIE Conference - Photonics Applications in Industry and Research, Warsaw, 30 August, The RF Power Coupler Development Program at LAL-Orsay and.
Shuichi Noguchi, KEK6-th ILC School, November Auxiliary Components  Input Power Coupler  HOM Dumping Coupler  Frequency Tuner  He Jacket  Magnetic.
SRF Results and Requirements Internal MLC Review Matthias Liepe1.
TDR Part 2: 3.3 Cavity Integration (10 pages) H. Hayano Baseline Design based on the meeting discussion.
, DESY, Hamburg ECFA Workshop, SCRF Session, Lutz Lilje, DESY Lutz Lilje DESY European Linear Collider Workshop ECFA LC2013 Fabrication and Quality.
ESS cavities interfaces
Summary of AWG7 SCRF technologies Eiji Kako Wolf-Dietrich Moeller Akira Yamamoto Hitoshi Hayano Tokyo, Nov
Shuichi Noguchi,SRF2007,10.71 New Tuners for ILC Cavity Application Shuichi Noguchi KEK.
Lutz Lilje DESY -MPY- Module Issues XFEL Linac Review R. Lange/L. Lilje Ongoing Tests Module Designs Future tests.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Lutz Lilje, DESY, TILC08 Tests with the Fast Frequency Tuners in the Saclay-I design Lutz.
XFEL SRF Accelerating Module Prototypes Tests at DESY Fermilab Seminar, July 21st Denis Kostin, MHF-SL, DESY.
Compatibility in the ILC ML. 主なデザインと相違点 BCD ( TTF) STF-BL その他 空洞、シー ル Φ 78 mm ビームパイ プ、アルミヘキサゴ ン Φ 80 mm ビームパイ プ、インジウムヘリ コ LL, Re 入力カプ ラー TTF-III 円筒セラミック窓.
1Matthias LiepeAugust 2, 2007 LLRF for the ERL Matthias Liepe.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Sergey Belomestnykh SRF and RF systems.
Plug compatibility Document ILC10 cavity integration session H. Hayano.
LCLS-II Power Coupler Nikolay Solyak, Ivan Gonin, Andrei Lunin C.Adolphsen - SLAC TTC meeting, March 23-27, 2014 AWLC2014, FNAL, May 12-16,
LCWS13, November 2013 At the University of Tokyo W.–D. Möller Status of the TTF3 RF Power Coupler.
Summary of the RF Parallel Session Steve Virostek Lawrence Berkeley National Lab MICE Collaboration Meeting 18 June 16, 2007.
Shuichi NoguchiHayama ILC Lecture, Part III ILC BCD Cavity  Maximum Use of Potential Performance  Maximum Use of each Cavity Performance 
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
Performance of magnetostrictive element at LHe environment 12th International Conference MIXDES 2005 Performance of magnetostrictive element at LHe environment.
Eric Montesinos - CERN - First SPL collaboration meeting - CERN December 11th 2008 First SPL collaboration meeting Experience with the LHC Main power Coupler.
Summery of the power coupler session at the LCWS13 workshop E. Kako W.-D. Möller H. Hayano A. Yamamoto All members of SCRF WG November 14, 2013.
Hayama ILC Lecture, , Shuichi Noguchi 1 Part III ILC BCD Cavity  Maximum Use of Potential Performance  Maximum Use of each Cavity Performance.
Plug compatibility discussion TILC09 cavity integration session H. Hayano.
Preparation procedure and RF processining of cERL-ML power coupler at KEK Hiroshi Sakai, Takaaki Furuya, Masato Sato, Kenji Shinoe, Kensei Umemori, Kazuhiro.
Matthias Liepe. Matthias Liepe – High loaded Q cavity operation at CU – TTC Topical Meeting on CW-SRF
11/12/2013P. Bosland - AD-retreat - Lund Designs of the Spoke and Elliptical Cavity Cryomodules P. Bosland CEA/Saclay IRFU On behalf of the cryomodule.
Shuichi NoguchiTTC Meeting at Milano, Injector Cryomodule for cERL at KEK Cavity 2 Prototypes were tested. Input Coupler 2 Couplers were tested.
ESS SC cavities development G. Devanz TTC meeting, march 1st 2011, Milano.
325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline Power Coupler design for Superconducting Spoke cavities. Originally.
First operation of the XFEL linac with the 2K cryogenic system
WP5 Elliptical cavities
XFEL beamline loads and HOM coupler for CW
T5.2: Harmonization - Material and Component Reference
Power coupler at DESY & for XFEL
TESLA Type Cavity HOM Coupler Multipacting
WP-X XFEL Project Progress Report (2016-3)
WP-46 XFEL 3rd harmonic system XFEL Project Progress Report (1-2010)
E-XFEL Status and First Beam Results
TTC Topical Workshop - CW SRF, Cornell 12th – 14th June 2013
Evolving an ILC focused SCRF Facility from the XFEL Infrastructure
ICEC/IMC 2016 Sergiy Putselyk DESY MKS
WP-X XFEL Project Progress Report (2014-3)
Mechanical setups Lorentz Force Detuning System Setup
Racks Coordination 09 September 2011 E. Negodin
09 Juni 2015 L1 Inbetriebnahme Before you start editing the slides of your talk change to the Master Slide view: Menu button “View”, Master, Slide.
for X-ray Optics and Beam Transport
Findings in RF Power Couplers after operation on cavities in PXFEL2
LLRF Functionality Stefan Simrock How to edit the title slide
WP Coordinaten XFEL RF Operation
Link Diagnostic Electronics
Yuhui Li How to edit the title slide
V. Veshcherevich Cornell University
CW Operation of XFEL Modules
Main Coupler R&D at DESY
presented by Elmar Vogel
Review of the European XFEL Linac System
CW accelerating module test progress at DESY
SCRF for cw operating XFEL
Test plan of ESS HB elliptical cavity
CEPC Input Coupler Discuss 6th IHEP-KEK SCRF Collaboration Meeting
EU-XFEL summary of performance degradation
Cryomodule Performance in FLASH and XFEL
TTC Meeting, July , Saclay, France.
Cryomodule Design for CW Operation 3.9 GHz considerations
Presentation transcript:

Power Couplers, HOM Couplers and Tuners for the XFEL Wolf-Dietrich Möller, DESY, MHF-SL DESY-XFEL – CERN-SPL Meeting, 08 to 09 September 2009 How to edit the title slide Upper area: Title of your talk, max. 2 rows of the defined size (55 pt) Lower area (subtitle): Conference/meeting/workshop, location, date, your name and affiliation, max. 4 rows of the defined size (32 pt) Change the partner logos or add others in the last row.

1. Power Coupler Specification Frequency 1.3 GHz Peak power (incl. control margin) 150 kW Repetition rate 10 Hz Pulsed mode 500 µsec risetime, 800 µsec flat top with beam Average power 1.9 kW High Power Processing (only on module test stand) 1 MW at reduced pulse length ( ≤500 µsec and repetition rate 1 Hz ) Coupling Qext = 106 – 107 (± 10 mm) 2 K heat load 0.06 W 4 K heat load 0.5 W 70 K heat load 6 W Lateral displacement ± 2 mm diagnostic sufficient for safe operation and monitoring DESY-XFEL – CERN-SPL Meeting, 08 to 09 September 2009 Wolf-Dietrich Möller, DESY, MHF-SL

2. Power Coupler Design Criteria coax is easy for: - variable coupling - fabrication - assembly two windows for: - clean assembly of the cavity - save operation cold coax: - at 70 Ohm, 40 mm diameter warm coax: - at 50 Ohm, 60 mm diameter bias on inner conductor: - suppress multipacting flexibility: - bellows in the warm and cold coax ceramics: - Al2O3 with TiN coating copper plating: - 10/30 µm outer/inner coax - high thermal/electric conductivity (RRR ≥ 30) - high purity, Hydrogen free DESY-XFEL – CERN-SPL Meeting, 08 to 09 September 2009 Wolf-Dietrich Möller, DESY, MHF-SL

3. Power Coupler Design DESY-XFEL – CERN-SPL Meeting, 08 to 09 September 2009 Wolf-Dietrich Möller, DESY, MHF-SL

4. Power Coupler in FLASH on Module 5 common pumping line and pump wave guide distribution DESY-XFEL – CERN-SPL Meeting, 08 to 09 September 2009 Wolf-Dietrich Möller, DESY, MHF-SL

5. Power Coupler Test and Operating Experience More than 50 TTF 3 couplers are tested on a coupler test stand at 1 MW, 2Hz, 1.3 ms, traveling wave, baked in situ, two at a time TTF 3 couplers are operated at the FLASH for more than 450 000 coupler-hours up to 400 kW, 2-10 Hz, 1.3 ms All couplers in the VUV FEL linac could be processed and operated up to the cavity performance limits DESY-XFEL – CERN-SPL Meeting, 08 to 09 September 2009 Wolf-Dietrich Möller, DESY, MHF-SL

6. Power Coupler High Gradient Test An electro polished cavity & TTF3 coupler have been operated at 35 MV/m for more than 1100 hours in the horizontal test stand and also in FLASH with beam Forward power was above 600 kW (due to the not compensated Lorentz Force detuning) No degradation in the performance of cavity or coupler (During setup of LLRF system breakdowns in coupler and quenches in cavity were caused by unexpected high power pulses) DESY-XFEL – CERN-SPL Meeting, 08 to 09 September 2009 Wolf-Dietrich Möller, DESY, MHF-SL

1. Beam Line HOM Absorber Design thermal connection to 70 K ceramic absorber beam line Before you start editing the slides of your talk change to the Master Slide view: Menu button “View”, Master, Slide Master: Edit the following 2 items in the 1st slide: 1) 1st row in the violet header: Delete the existent text and write the title of your talk into this text field 2) The 2 rows in the footer area: Delete the text and write the information regarding your talk (same as on the Title Slide) into this text field. If you want to use more partner logos position them left beside the DESY logo in the footer area Close Master View J. Sekutowicz, DESY, Hamburg DESY-XFEL – CERN-SPL Meeting, 08 to 09 September 2009 Wolf-Dietrich Möller, DESY, MHF-SL

2. Beam Line HOM Absorber in Module first test in FLASH sucessfull 12 m long cryomodule: 8 cavities Absorbing ring made of lossy ceramic: ε´ =15 and ε´´ =4 J. Sekutowicz, DESY, Hamburg DESY-XFEL – CERN-SPL Meeting, 08 to 09 September 2009 Wolf-Dietrich Möller, DESY, MHF-SL

F-antenna for electric and magnetic coupling FLASH feedthrough 1. HOM Coupler F-antenna for electric and magnetic coupling FLASH feedthrough Niobium antenna DESY-XFEL – CERN-SPL Meeting, 08 to 09 September 2009 Wolf-Dietrich Möller, DESY, MHF-SL

2. HOM Coupler Feedthrough SMA-R-Ti, but: N – connector copper plating used for the 2nd cavity production in FLASH DESY-XFEL – CERN-SPL Meeting, 08 to 09 September 2009 Wolf-Dietrich Möller, DESY, MHF-SL

3. HOM Coupler Feedthrough Jefferson Lab development higher thermal conductivity plan for XFEL: already assembled at vertical cw test (much higher power) vertical cw tests at 9-cell cavities under way DESY-XFEL – CERN-SPL Meeting, 08 to 09 September 2009 Wolf-Dietrich Möller, DESY, MHF-SL

Required tuning range: 1. Tuner Specification Required tuning range: Slow: 800 kHz ~ 2 mm Fast: 1 kHz ~ 3um Resolution: Better than 1Hz/step Operating conditions inside the cryostat Isolation vacuum Temperature ~2 K Stiffness of the mechanical part Better than 20 um/kN Hysteresis-free Proposed solution Mechanical lever arm system with stepping motor (slow) and piezo elements (fast) L. Lilje, DESY, Hamburg DESY-XFEL – CERN-SPL Meeting, 08 to 09 September 2009 Wolf-Dietrich Möller, DESY, MHF-SL

2. Tuner Design Current design in use at FLASH Design by CEA Fast piezo detuning introduced not from beginning motor screw Design by M. Maurier and P. Leconte based of the MACSE tuner design (CEA Saclay) DLscrew DLarms DLcavity cavity connection tank connection L. Lilje, DESY, Hamburg DESY-XFEL – CERN-SPL Meeting, 08 to 09 September 2009 Wolf-Dietrich Möller, DESY, MHF-SL

Operating temperature 2. Fast Tuner with Piezos Maximal load: <5 kN Operating temperature 4 -10 K in isolation vacuum Stroke (and capacity) reduced to about 10-20% of room temperature stroke Preload force 0,8-1,2 kN/cm2 for highest lifetime Sensor and actuator configuration One active element other element as sensor and for redundancy L. Lilje, DESY, Hamburg DESY-XFEL – CERN-SPL Meeting, 08 to 09 September 2009 Wolf-Dietrich Möller, DESY, MHF-SL

Control for stepping motor 3. Tuner controls Control for stepping motor Integrated in control system Use os XFEL ‘standard’ motor controls (as for couplers etc.) Piezo Amplifier Compact reliable prototyping underway Possibly using ATCA standard crates Specification available on request L. Lilje, DESY, Hamburg DESY-XFEL – CERN-SPL Meeting, 08 to 09 September 2009 Wolf-Dietrich Möller, DESY, MHF-SL

3. Tuner components cavity beam pipe cavity tank motor and gear L. Lilje, DESY, Hamburg DESY-XFEL – CERN-SPL Meeting, 08 to 09 September 2009 Wolf-Dietrich Möller, DESY, MHF-SL