SA1 Execution Plan Status and Issues

Slides:



Advertisements
Similar presentations
LCSC October The EGEE project: building a grid infrastructure for Europe Bob Jones EGEE Technical Director 4 th Annual Workshop on Linux.
Advertisements

DataGrid is a project funded by the European Commission under contract IST rd EU Review – 19-20/02/2004 DataGrid Quality Assurance On behalf.
INFSO-RI Enabling Grids for E-sciencE Operational Security OSCT JSPG March 2006 Ian Neilson, CERN.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
EGEE is a project funded by the European Union under contract IST SA1 and NA3 Alistair Mills Grid Deployment Group +41.
EGEE is a project funded by the European Union under contract IST JRA1 Testing Activity: Status and Plans Leanne Guy EGEE Middleware Testing.
EGEE is a project funded by the European Union under contract IST The way ahead Alistair Mills Grid Deployment Group
EGI: SA1 Operations John Gordon EGEE09 Barcelona September 2009.
INFSO-RI Enabling Grids for E-sciencE SA1: Cookbook (DSA1.7) Ian Bird CERN 18 January 2006.
LCG and HEPiX Ian Bird LCG Project - CERN HEPiX - FNAL 25-Oct-2002.
EGEE is proposed as a project funded by the European Union under contract IST EU eInfrastructure project initiatives FP6-EGEE Fabrizio Gagliardi.
Responsibilities of ROC and CIC in EGEE infrastructure A.Kryukov, SINP MSU, CIC Manager Yu.Lazin, IHEP, ROC Manager
INFSO-RI Enabling Grids for E-sciencE Plan until the end of the project and beyond, sustainability plans Dieter Kranzlmüller Deputy.
EGEE is a project funded by the European Union under contract IST JRA1-SA1 requirement gathering Maite Barroso JRA1 Integration and Testing.
Bob Jones Technical Director CERN - August 2003 EGEE is proposed as a project to be funded by the European Union under contract IST
EGEE is a project funded by the European Union under contract IST User support in EGEE Alistair Mills Torsten Antoni EGEE-3 Conference 20 April.
SA1/SA2 meeting 28 November The status of EGEE project and next steps Bob Jones EGEE Technical Director EGEE is proposed as.
Fabrizio Gagliardi EGEE designated project director All activity workshop EGEE is proposed as a project funded by the European Union under contract IST
JRA Execution Plan 13 January JRA1 Execution Plan Frédéric Hemmer EGEE Middleware Manager EGEE is proposed as a project funded by the European.
FP6−2004−Infrastructures−6-SSA E-infrastructure shared between Europe and Latin America EELA Infrastructure (WP2) Roberto Barbera.
Induction: Adding new applications to EGEE infrastructure –April 26-28, Adding new applications to EGEE infrastructure Roberto Barbera EGEE is.
15-Dec-04D.P.Kelsey, LCG-GDB-Security1 LCG/GDB Security Update (Report from the Joint Security Policy Group) CERN 15 December 2004 David Kelsey CCLRC/RAL,
EGEE is a project funded by the European Union under contract IST EGEE Services Ian Bird SA1 Manager Cork Meeting, April
EGEE is a project funded by the European Union under contract IST WBS/ Execution Plan Alistair Mills Grid Deployment Group
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks SA1: Grid Operations Maite Barroso (CERN)
EGEE MiddlewareLCG Internal review18 November EGEE Middleware Activities Overview Frédéric Hemmer EGEE Middleware Manager EGEE is proposed as.
INFSO-RI Enabling Grids for E-sciencE EGEE SA1 in EGEE-II – Overview Ian Bird IT Department CERN, Switzerland EGEE.
EGEE is a project funded by the European Union under contract IST Network Resources Provision Jean-Paul Gautier SA2 manager Cork meeting,
JRA2: Quality Assurance Overview EGEE is proposed as a project funded by the European Union under contract IST JRA.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGI Operations Tiziana Ferrari EGEE User.
EGI-InSPIRE Steven Newhouse Interim EGI.eu Director EGI-InSPIRE Project Director Technical Director EGEE-III 1GDB - December 2009.
EMI INFSO-RI SA1 Session Report Francesco Giacomini (INFN) EMI Kick-off Meeting CERN, May 2010.
INFSO-RI Enabling Grids for E-sciencE An overview of EGEE operations & support procedures Jules Wolfrat SARA.
Guy Wormser IN2P3/CNRS, EGEE Applications Manager September 2003 EGEE is proposed as a project funded by the European Union under contract IST
CERN LCG Deployment Overview Ian Bird CERN IT/GD LCG Internal Review November 2003.
EGEE is a project funded by the European Union under contract IST Roles & Responsibilities Ian Bird SA1 Manager Cork Meeting, April 2004.
SA2 : Network Resource Provision All Activity Meeting – 17 March SA2 Execution Plan for the first year Jean-Paul Gautier SA2 Manager CNRS/UREC.
Fabrizio Gagliardi EGEE project director All activity workshop 17 th March 2004 EGEE is proposed as a project funded by the European Union under contract.
EGEE is a project funded by the European Union under contract IST Task Breakdown – SA1 Alistair Mills SA1 - CERN SA1 Meeting Cork, 20 April.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Operations Automation Team Kickoff Meeting.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks SA2 Networking support for EGEE III Xavier.
Bob Jones EGEE designated technical director All activity workshop EGEE is proposed as a project funded by the European Union under contract IST
All Activities Meeting – 13/14 Jan SA2 Execution Plan for the first year Franck Bonnassieux CNRS/UREC EGEE is proposed as a project funded by.
WP3 EGEE Steve Fisher / RAL 14/1/2004. WP3 Steve Fisher/RAL - 14/1/2004EGEE2 Credits My slides have been stolen from many sources including: –Fabrizio.
EGEE is a project funded by the European Union under contract IST New VO Integration Fabio Hernandez ROC Managers Workshop,
EGEE is a project funded by the European Union under contract IST Service Activity 1 M.Cristina Vistoli ROC Coordinator All activity meeting,
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Grid is a Bazaar of Resource Providers and.
Grid Deployment Technical Working Groups: Middleware selection AAA,security Resource scheduling Operations User Support GDB Grid Deployment Resource planning,
INFSO-RI Enabling Grids for E-sciencE EGEE general project update Fotis Karayannis EGEE South East Europe Project Management Board.
Javier Orellana EGEE-JRA4 Coordinator CERN March 2004 EGEE is proposed as a project funded by the European Union under contract IST Network.
2007/07/04 Organisation and tasks of ROC France Pierre Girard Visit of Japanese grid site managers.
JRA1 Middleware re-engineering
Bob Jones EGEE Technical Director
Status of Task Forces Ian Bird GDB 8 May 2003.
Regional Operations Centres Core infrastructure Centres
EGEE is a project funded by the European Union
EGEE Middleware Activities Overview
JRA3 Introduction Åke Edlund EGEE Security Head
LCG Security Status and Issues
Ian Bird GDB Meeting CERN 9 September 2003
EGEE and Induction Mike Mineter NeSC Training Team
Long-term Grid Sustainability
JRA1 (Middleware) Overview
Bob Jones EGEE Technical Director
Infrastructure Support
Operating the World’s largest grid infrastructure
LCG Operations Centres
LCG Operations Workshop, e-IRG Workshop
Connecting the European Grid Infrastructure to Research Communities
Ian Bird LCG Project - CERN HEPiX - FNAL 25-Oct-2002
Presentation transcript:

SA1 Execution Plan Status and Issues Ian Bird EGEE Operations Manager EGEE is proposed as a project funded by the European Union under contract IST-2003-508833 All Activity Meeting – 14 January 2004 - 1

SA1 Objectives Core Infrastructure services: Operate essential grid services Grid monitoring and control: Proactively monitor the operational state and performance, Initiate corrective action Middleware deployment and resource induction: Validate and deploy middleware releases Set up operational procedures for new resources Resource provider and user support: Coordinate the resolution of problems from both Resource Centres and users Filter and aggregate problems, providing or obtaining solutions Grid management: Coordinate Regional Operations Centres (ROC) and Core Infrastructure Centres (CIC) Manage the relationships with resource providers via service-level agreements. International collaboration: Drive collaboration with peer organisations in the U.S. and in Asia-Pacific Ensure interoperability of grid infrastructures and services for cross-domain VO’s Participate in liaison and standards bodies in wider grid community All Activity Meeting – 14 January 2004 - 2

Operations Infrastructure All Activity Meeting – 14 January 2004 - 3

SA1 Management All Activity Meeting – 14 January 2004 - 4

SA1 Partners CERN (OMC, CIC) UK+Ireland (CIC,ROC) France (CIC, ROC) Italy (CIC, ROC) Germany+Switzerland (ROC) Northern Europe (ROC) South West Europe (ROC) South East Europe (ROC) Central Europe (ROC) Russia (CIC – M12, ROC) 48 Partners involved in SA1 ROC’s in several regions are distributed across many sites Organisational Issues ROC’s must take responsibility: Chapter in execution plan Organisation within region Reporting to overall SA1 CIC’s vs ROC’s Need to clarify overlap/separation – dedicated discussion All Activity Meeting – 14 January 2004 - 5

Milestones & Deliverables Month Deliverable / Milestone Item Lead M03 DSA1.1 Detailed execution plan for first 15 months of infrastructure operation CERN M06 MSA1.1 Initial pilot production grid operational DSA1.2 Release notes corresponding to the initial pilot Grid infrastructure operational INFN M09 DSA1.3 Accounting and reporting web site publicly available CCLRC MSA1.2 First review M12 DSA1.4 Assessment of initial infrastructure operation and plan for next 12 months IN2P3 M14 DSA1.5 First release of EGEE Infrastructure Planning Guide (“cook-book”), MSA1.3 Full production grid infrastructure operational DSA1.6 Release notes corresponding to the full production Grid infrastructure operational M18 MSA1.4 Second review M22 DSA1.7 Updated EGEE Infrastructure Planning Guide M24 DSA1.8 Assessment of production infrastructure operation and outline of how sustained operation of EGEE might be addressed. MSA1.5 Third review and expanded production grid operational DSA1.9 Release notes corresponding to expanded production Grid infrastructure operational All Activity Meeting – 14 January 2004 - 6

Work breakdown – tasks, products Basic level: OMC, CIC, ROC, Security Next levels will depend on refinement of roles and responsibilities All Activity Meeting – 14 January 2004 - 7

Training requirements New people: LCG, EDG, Globus – tutorials? New sites: LCG procedures, middleware, policies, operations Longer term: Grid services, OGSA and associated technologies etc All Activity Meeting – 14 January 2004 - 8

Risk Analysis People: Middleware: Infrastructures: Need to identify unfunded effort now Hiring process will not have people in place by April 1 Short term contracts – tends to attract inexperienced people Continuity Middleware: Response to operational needs Packaging and installation not flexible enough Scope-creep of middleware – bug fixes vs functional changes Infrastructures: National infrastructures cannot integrate in EGEE UK e-Science, NorduGrid Must be addressed in execution plans Use LCG Deployment and Security Risk Analyses http://lcg.web.cern.ch/LCG/PEB/risk/ , http://proj-lcg-security.web.cern.ch/proj-lcg-security/RiskAnalysis/risk.html Quite comprehensive Many issues in common All Activity Meeting – 14 January 2004 - 9

Issues related to other activities JRA1: Understand requirements setting process Agree on split of responsibilities for integration/certification/testing Understand support issues for LCG-2 based middleware Discussions in progress SA2: No real issues for Execution plan Operationally will work together – GOC vs NOC, understanding of SLA’s Security: Operational security – relationship to JRA3 Catch-all CA – whose responsibility? (JRA3?) JRA2: Project and task breakdown and reporting structures focussed on products and not services All Activity Meeting – 14 January 2004 - 10

Changes requested to TA No significant changes foreseen Execution plan will address Refinement of roles (CIC, ROC, OMC etc) Interactions between them Resource and service delivery All Activity Meeting – 14 January 2004 - 11

General Issues Peering with US Grid infrastructures Needs interaction from project start Federation chapters should detail how national infrastructures integrate/migrate to EGEE Hiring (No) People to work on execution plan Focus on getting LCG-2 running – EGEE will have operational infrastructure at project start Need to agree that ROC’s (or defined people in each region) have organisational responsibility for the region Cannot deal with 48 partners directly All aspects: Negotiate SLAs with Resource centres and with EGEE Operational responsibility Organisational responsibility – planning and reporting (effort reports, etc) All Activity Meeting – 14 January 2004 - 12

Execution plan Execution plan is not well advanced: Many people focussed on getting LCG-2 going Outline exists – sections and contents quite well defined Template agreed for chapters for each region Input and ideas for some sections Much work still to do: Refine roles and responsibilities for ROC, CIC How to approach SLA’s Do we need a “GDB”(OAG)? – ROC and CIC managers All Activity Meeting – 14 January 2004 - 13

Execution Plan - TOC Overview – introduction Organisation Clarify roles, responsibilities, interactions Processes Security group Policy group – relation to NA5 Federation organisation Chapter per region -> template Service set up and deployment What services, functions Relation to US, Asia projects Transition process New centres – process Training Policies Operations and tools Certification, Middleware support CA and VO management Operational Security Metrics – measurement, validation of services SLA’s Management PBS WBS Staffing and resources plan From regions Training plan Risk assessment Deliverables and responsibilities All Activity Meeting – 14 January 2004 - 14

Execution plan – ROC template Resources: Resource centres Resources - At month 1, 6, 15? When RC joins EGEE FTE for support (need > min) Name system manager, security manager Policy for: Which VO supported … System support and Availability (on-call hours etc) … Expertise available Ability to run general grid services (IS, RLS, etc) ROC organization: Organization – teams, etc People – and responsibilities – must name unfunded people (and funded if known) Support – how it is organized and managed, especially for distributed ROC’s Operational support – how region is organized and managed All Activity Meeting – 14 January 2004 - 15

Steps to project start-up Hiring Refine roles and interactions between CIC, ROC, NOC and other operational organisations Clarify interactions with JRA1 Clarify security issues Clarify relationship to international grid projects for VO’s that are larger than EGEE (LCG, other HEP,…) Understand national infrastructure integration issues What requirements will this place on operations, mw, processes, security, etc. Set up basic policy frameworks: How VOs access resources, limitations, rules, etc – sufficient that infrastructure can be exploited from project start Identify sites willing to run development service (based on EDG tb sites?) Set up OMC team Organise membership of QA, Security, Requirements, etc. groups Define transition process from LCG operations to EGEE operations All Activity Meeting – 14 January 2004 - 16