HO correctors update Massimo Sorbi and Marco Statera

Slides:



Advertisements
Similar presentations
Q1 for JLAB’s 12 Gev/c Super High Momentum Spectrometer S.R. Lassiter, P.B. Brindza, M. J. Fowler, S.R. Milward, P. Penfold, R. Locke Q1 SHMS HMS Q2 Q3.
Advertisements

MQXF Quench Protection Analysis HiLumi workshop – KEK, Tsukuba Vittorio Marinozzi 11/18/2014.
HL-LHC Corrector Magnet 3D design status Giovanni Volpini on behalf of the LASA team CERN, February 25, 2014.
HL-LHC Corrector Magnet Design & Construction Activity Status Giovanni Volpini on behalf of the LASA team CERN, January
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
Superconducting Large Bore Sextupole for ILC
Paolo Fessia, Ezio Todesco
HL-LHC IR Higher Order Corrector Magnets Conceptual Design & Construction Activity F. Alessandria, G. Bellomo, F. Broggi, A. Paccalini, D. Pedrini, A.Leone,
Possible HTS wire implementation Amalia Ballarino Care HHH Working Meeting LHC beam-beam effects and beam-beam interaction CERN, 28 th August 2008.
LQ Goals and Design Study Summary – G. Ambrosio 1 LARP Collab Mtg – SLAC, Oct , 2007 BNL - FNAL - LBNL - SLAC LQ Goals & Design Summary Giorgio Ambrosio.
Superconducting R&D – Now Strand and Cable R&D FERMILAB Magnet Systems Department – Now SC Materials Department (TD) HTS Insert Coil Test in External Solenoid.
HL-LHC Sextupole Magnet Design Review Giovanni Volpini on behalf of the LASA team with the help of Paolo Fessia CERN, May 26 th, 2015.
M. Modena, A. Aloev CERN, Geneva, CH “An alternative Super-ferric design for ILC QD0” “LCWS14, 6-10 October 2014 Belgrade.
11 T Nb3Sn Demonstrator Dipole R&D Strategy and Status
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
Superconducting Magnet Group Superconducting magnet development for ex-situ NMR LDRD 2003 Paolo Ferracin, Scott Bartlett 03/31/2003.
Subscale quadrupole (SQ) series Paolo Ferracin LARP DoE Review FNAL June 12-14, 2006.
GROUP C – Case study no.4 Dr. Nadezda BAGRETS (Karlsruhe Institute of Technology) Dr. Andrea CORNACCHINI (CERN EN Dept.) Mr. Miguel FERNANDES (CERN BE.
Orbit Correctors in D2 and Q4 Update J. Rysti and E. Todesco 1 4/11/2014.
Magnet design, final parameters Paolo Ferracin and Attilio Milanese EuCARD ESAC review for the FRESCA2 dipole CERN March, 2012.
Consolidation of the Booster Injection Quadrupole Magnets (part 2) A. Aloev 14 th February 2013.
High Order Corrector Magnets Status F. Alessandria, G. Bellomo, F. Broggi, A. Paccalini, D. Pedrini, A.Leone, V. Marinozzi, M. Quadrio, M. Sorbi, M. Statera,
HL-LHC IR Corrector Magnets Design & Construction Activity Giovanni Volpini on behalf of the LASA team CERN, 9 October 2014.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
ILC Main Linac Superconducting Quadrupole V. Kashikhin for Superconducting Magnet Team.
Quench Protection Maximum Voltages G. Ambrosio, V. Marinozzi, M. Sorbi WG Video-Mtg January 14, 2015.
E. Todesco INTERACTION REGION MAGNETS E. Todesco On behalf of the WP3 collaboration CERN, Geneva, Switzerland CERN, 27 th October 2015.
Cosine-theta configurations for S.C. Dipole Massimo Sorbi on behalf of: INFN LASA & Genova Team Giovanni Bellomo, Pasquale Fabbricarore, Stefania Farinon,
Super Fragment Separator (Super-FRS) Machine and Magnets H. Leibrock, GSI Darmstadt Review on Cryogenics, February 27th, 2012, GSI Darmstadt.
Tiina Salmi and Antti Stenvall, Tampere University of technology, Finland FCCW2016 Roma, April 13 th, 2016 Quench protection of the 16T dipoles for the.
Study of the HTS Insert Quench Protection M. Sorbi and A. Stenvall 1 HFM-EuCARD, ESAC meeting, WP 7.4.1CEA Saclay 28 feb. 2013,
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
GSI Helmholtzzentrum für Schwerionenforschung GmbH The Optimized Superconducting Dipole of SIS100 for Series Production ICEC26 March 9th, 2016 GSI Helmholtzzentrum.
First Q4 cold mass engineering follow up meeting 16/03/2016 Q4 Status update H. Felice, M. Segreti, D. Simon and JM. Rifflet.
Answers to the review committee G. Ambrosio, B.Bordini, P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
FNAL Workshop, July 19, 2007 ILC Main Linac Superconducting Quadrupole V.Kashikhin 1 ILC Main Linac Superconducting Quadrupole (ILC HGQ1) V. Kashikhin.
Superconducting Cryogen Free Splittable Quadrupole for Linear Accelerators Progress Report V. Kashikhin for the FNAL Superconducting Magnet Team (presented.
CHATS-AS 2011clam1 Integrated analysis of quench propagation in a system of magnetically coupled solenoids CHATS-AS 2011 Claudio Marinucci, Luca Bottura,
CERN QXF Conductor Procurement and Cable R&D A.Ballarino, B. Bordini and L. Oberli CERN, TE-MSC-SCD LARP Meeting, Napa, 9 April 2013.
WP10 General Meeting, Giovanni Volpini, CERN 1 December 2015 Test progress INFN 1.
HTS and LTS Magnet Design and Prototyping for RAON
Jim Kerby Fermilab With many thanks to Vladimir Kashikhin, the FNAL, KEK, and Toshiba teams. SCRF BTR Split Quadrupole ILC ML & SCRF Baseline Technical.
HL-LHC Magnet components and assemblies
Massimo Sorbi on behalf of INFN team:
Status of QLASA Tool Adapter
WORK IN PROGRESS F C C Main Quadrupoles FCC week 2017
Quench Simulation at GSI
Quench estimations of the CBM magnet
HO Corrector Magnets: decapole test and future plans
High Order correctors coil manufacturing
16 T Cosq DIPOLE Mechanical Analysis
Agenda 9:00  - Welcome ASG speaker 9:10 -  Introduction -       P.Fabbricatore 9:25 - The D2   magnets in HL-LHC   -  E. Todesco.
Status report on MQYY (Q4)
Quench protection of the MAGIX high-order correctors
FRESCA2 Update on the dipole design and new calculations
Glyn Kirby Magnet AssemblyTechniques.
HO Corrector Magnets: decapole test and future plans
HL-LHC Corrector Magnet Design & Construction Activity Status
Introduction to the technical content The Q4 magnet (MQYY) for HL-LHC
Yingshun Zhu Accelerator Center, Magnet Group
Conceptual design of superconducting correctors for Hi-Lumi Project
MQXF coil cross-section status
P.Fabbricatore & S.Farinon
HL-LHC IR Corrector Magnets Conceptual Design & Construction Activity
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
Conceptual design of superconducting correctors for Hi-Lumi Project (v2) F. Toral - CIEMAT CIEMAT, March 7th, 2013.
Marco Statera on behalf of the LASA team INFN Milano - LASA
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
Quench calculations of the CBM magnet
An alternative approach to the design of the corrector magnets
Presentation transcript:

HO correctors update Massimo Sorbi and Marco Statera on behalf of the LASA team INFN Milano - LASA CERN – 8 February 2016

status of the quadrupole status of the round coil sextupole OUTLINE status of the octupole status of the decapole status of the quadrupole status of the round coil sextupole M. Statera- CERN 2017/2/8

MAGNET ZOO (PROTOTYPES) OD=320 mm OD=320 mm OD=320 mm Completed & succefully tested sextupole octupole ecapole OD=460 mm OD=320 mm dodecapole M. Statera- CERN 2017/2/8 quadrupole

integrated field @ Iop @ r50 mm 8POLE nominal simulation length 160 mm 183 mm integrated field @ Iop @ r50 mm 46 Tmm 45 Tmm magnetic length 87 mm 99 mm enegy @Iop 1.4 kJ 1.07 kJ harmonics B12=11.6 B20=-3.0 f 320 mm ELECTRICAL CONNECTIONS printed boards to improve high voltage insulation DURATRON coils M. Statera- CERN 2017/2/8

8POLE: COILS test coil M08 01÷03 production M08 04÷12 s.s.l. nominal current coils’ assessment geometry resistance inductance (2 batches) HV insulation 5kV single coil’s cold test: 2 training quenches reached short sample sample 247 A M. Statera- CERN 2017/2/8

8POLE WORKING POINT s.s.l working points short sample @ 4.2 K (calculated) 8pole single coil 247 A (247 A) 8pole (232 A) 6pole 241 A (248 A) working points 105 210 262 current [A] by V. Marinozzi M. Statera- CERN 2017/2/8

new electrical connections 8POLE: assembly 1 assembly procedure same as 6pole new electrical connections lamination Copper 2 mm wide 0.035 mm thick two printed circuit boards coils’ connections signals alignment frame spacers fixed longitudinally wedges in position the wedges are fixed CuBe rods M. Statera- CERN 2017/2/8

8POLE: assembly 2 M. Statera- CERN 2017/2/8

8POLE GROUND INSULATION same values during the assembly and at fully assembled magnet coil vs iron yoke circuits and connections vs return yoke improvement compared to the 6pole drop @1.8 kV max voltage on 6pole 120 V @ssl M. Statera- CERN 2017/2/8

weeks 12÷14 qualification 1h @ 108% @2.2 K training @4.2 K 8POLE TEST weeks 12÷14 qualification 1h @ 108% @2.2 K training @4.2 K thermal cycle qualification @ 4.2 K M. Statera- CERN 2017/2/8

TESTS connections boards (PCB - ARLON®) test samples from production NbTi wire soldered test at room temperature w and w/o 77 K thermal cycle no Cu or NbTi detachment no difference was measured thread fixing CTD101K no heat treatment 4 weeks: same torque as LOCTITE® 243™ thermal cyle during next cooldown M. Statera- CERN 2017/2/8

integrated field @ Iop @ r50 mm 10POLE nominal simulation length 172 mm 183 mm integrated field @ Iop @ r50 mm 25 Tmm 26 Tmm magnetic length 95 mm 97 mm harmonics B15=11.6 B25=-0.7 mechanics procurement ongoing production foreseen in weeks 7÷15 coils: production started first batch: 3 standard BTS2 + 1 hybrid BTS2/DURATRON M. Statera- CERN 2017/2/8

10POLE COILS’ FIRST BATCH 4 coils produced M. Statera- CERN 2017/2/8

10POLE COILS’ FIRST BATCH - 2 4 coils produced (1 batch) 3 standard BTS2 1 hybrid BTS2/DURATRON week 8 1 coil full energization 2 coils thermal cycle M. Statera- CERN 2017/2/8

integrated field @ Iop @ r50 mm 4POLE electromagnetic design Iop=182 A protection: ongoing mechanical design: ongoing total length ~960 mm nominal simulation coils’ length 839 mm 865 mm integrated field @ Iop @ r50 mm 1.0 Tm 1.2 Tm magnetic length 807 mm 805 mm enegy @Iop 24 kJ 41 kJ next steps drawings for quotation: this week final design: February M. Statera- CERN 2017/2/8

electromagnetic design Round Coil Magnet demonstrator Fe f 380 demonstrator inner bore f 150 mm single MgB2 coil round wire by COLUMBUS bare diameter 1 mm electromagnetic design working point 133 A @4.2 K margin 48 % on the load line inductance 148 mH adiabatic hot spot temperature < 90 K coil 100 mm Fe one module Alknes P. et al. (2015) 11thInternational Conference on Materials & Mechanisms of Superconductivity. To be submitted as a manuscript to SUST. K. Konstantopoulou et al.. (2016) Supercond. Sci. Technol., 29, 084005. G. Volpini et al. Eletromagnetic Study of a Round Coil Superferric Magnet,IEEE Tr. App. Sup, 26, 4 (2016) M. Statera- CERN 2017/2/8

octupole: assembled and ready for low temperature test decapole CONCLUSIONS octupole: assembled and ready for low temperature test decapole mechanics ordered coils in production quadrupole: design for quotation round coil sextupole: updated design for MgB2 wire M. Statera- CERN 2017/2/8