Commissioning and Calibration Strategies for Micromegas Vertex Tracker

Slides:



Advertisements
Similar presentations
H1 SILICON DETECTORS PRESENT STATUS By Wolfgang Lange, DESY Zeuthen.
Advertisements

RD S. Aune CEA/IRFU Micromegas Bulk for CLAS12 vertex tracker.
Micromegas studies using cosmic rays Franck Sabatié May 7th 2009 Saclay cosmic ray bench Data acquisition system and analysis tools MIP detection Position.
Micromegas for CLAS12 Central Detector - Update Franck Sabatié November 19th 2009 Micromegas option for the Central Detector Why, Where, How ? R&D milestones.
Micromegas detectors for the CLAS12 central tracker Brahim Moreno (for the Saclay group) CLAS12 technical workshop 03/17/ 2010 Jefferson lab Update on.
Micromegas detectors for the CLAS12 central tracker Brahim Moreno (for the Saclay group) CLAS12 central detector meeting : 2 december 2009 Cea Saclay CERN.
Track Timing at e + e - Linear Collider with the Silicon Drift Detector Main Tracker R. Bellwied, D. Cinabro, V. L. Rykov Wayne State University Detroit,
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
CLAS12 CalCom Activity: a progress report V. Burkert, D. Carman, R. De Vita, D. Weygand CLAS12 meeting, February 22 nd 2012.
HPS Test Run Setup Takashi Maruyama SLAC Heavy Photon Search Collaboration Meeting Thomas Jefferson National Accelerator Facility, May 26-27,
Debbie Harris Sacha Kopp, Commissioning Workshop 1    Beam Monitoring Hadmon will see remnant protons Muon Monitors see whatever escapes beam.
November 18, 2008 John Haggerty 1 PHENIX In Run 9 John Haggerty Brookhaven National Laboratory.
1 CLAS12/Central Tracker review. Saclay 12/09 Stéphan AUNE Central Tracker review Micromegas central & forward tracker  R&D and prototypes  CAD implantation.
Julien Bettane, Giulia Hull, Silvia Niccolai, Daria Sokhan 31/1/2012 Status and commissioning plan for the Central Neutron Detector.
EPS-HEP 2015, Vienna. 1 Test of MPGD modules with a large prototype Time Projection Chamber Deb Sankar Bhattacharya On behalf of.
F. Sabatié Slides from D. Attié, S. Procureur June 18 th, 2014 Forward-Tagger Tracker – Status & Plan – – Status & Plan –
08-June-2006 / Mayda M. VelascoCALOR Chicago1 Initial Calibration for the CMS Hadronic Calorimeter Barrel Mayda M. Velasco Northwestern University.
1 G9a -FROST. 2 Experiments FROST New generation of CLAS photoproduction experiments with FROzen Spin Polarized Target (FROST) E02-112: γp→KY (K + Λ,
The Status of the ATLAS Experiment Dr Alan Watson University of Birmingham on behalf of the ATLAS Collaboration.
Luca Spogli Università Roma Tre & INFN Roma Tre
The BoNuS Detector Concept Design Status Howard Fenker March 11, 2005.
S. AUNE 15/09/08 Micromegas Bulk for CLAS12 tracker.
Test of the GEM Front Tracker for the SBS Spectrometer at Jefferson Lab F. Mammoliti, V. Bellini, M. Capogni, E. Cisbani, E. Jensen, P. Musico, F. Noto,
1 The ATLAS SemiConductor Tracker commissioning at SR1 APS and JPS joint conference October 30, 2006 Ryuichi Takashima ( Kyoto Univ. of Education ) For.
Muon Tracker Responsibilities This Year South arm commissioning through this year’s run Analysis Software oversight and development North Arm station 2.
Wenxin Wang On behalf of LCTPC 01/11/2012W.Wang_ IEEE Conference Nuclear Science Symposium, Medical Imaging Conference & workshop on Room-Temperature.
TB Peter Glässel, Heidelberg1 TPC Status Report Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
The Q Weak Experiment Event tracking, luminosity monitors, and backgrounds John Leacock Virginia Tech on behalf of the Q Weak collaboration Hall C Users.
Measurement of the Charge Ratio of Cosmic Muons using CMS Data M. Aldaya, P. García-Abia (CIEMAT-Madrid) On behalf of the CMS Collaboration Sector 10 Sector.
Micromegas Bulk Demonstrator One type of Bulk: Active area; 115 mm for 288 strips, 500 mm long Material: 100 µm PCB, 5 µm Cu, 18µm mesh, 20µm Mylar Two.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
CLAS12 CalCom Activity: a progress report V. Burkert, D. Carman, R. De Vita, D. Weygand CLAS12 meeting, June 14 th 2012.
Micromegas for the Central Tracker Sébastien Procureur CEA-Saclay.
Commissioning Schedule and Shifts – First Call E906 Collaboration Meeting 23 February 2010.
MICE CM39 St Catherine’s, Oxford, 26 June 2014 Paul Soler Instrumentation Global Commissioning Plan.
The Detector Performance Study for the Barrel Section of the ATLAS Semiconductor Tracker (SCT) with Cosmic Rays Yoshikazu Nagai (Univ. of Tsukuba) For.
Review of Micromegas Tracking Detectors for CLAS12 – May 7, 2009 Reviewers: Madhu Dixit, Mac Mestayer Presentations covered the following topics: –detector.
Six modules Micromegas TPC beam test & Test bench 12/4/2012W.Wang_RD51 mini week1 D. Attié, P. Colas, M. Dixit, P. Hayman, W. Wang.
T. Zerguerras- RD51 WG Meeting- CERN - February Single-electron response and energy resolution of a Micromegas detector T. Zerguerras *, B.
By: Eric Seabron. B-Field Sensors: Used for magnetic field mapping. Tube Gases: No leaks, 93% Argon/ 7% CO2 at 3 bars. MDC Temp. Sensors: Accounts for.
TPC for ILC and application to Fast Neutron Imaging L. An 2, D. Attié 1, Y. Chen 2, P. Colas 1, M. Riallot 1, H. Shen 2, W. Wang 1,2, X. Wang 2, C. Zhang.
STT Detector risk’s assessment. STT detector work packages Straw Tubes modules Straw Tracker mechanics Front-End Electronics Analog electronics Digital.
CALICE, Shinshu, March Update on Micromegas TB analysis Linear Collider group, LAPP, Annecy CALICE collaboration meeting 5-7 March 2012, Shinshu,
Forward Tagger Calorimeter Prototype tests at Jlab: report CLAS12 Workshop February 22, 2012 A. Celentano.
y x Vincenzo Monaco, University of Torino HERA-LHC workshop 18/1/2005
(University of Sofia “St. Kliment Ohridski”)
Micromegas Vertex Tracker Status Report
First data from TOTEM experiment at LHC
CLAS12 Commissioning with Cosmincs
Approved Plots from CMS Cosmic Runs (mostly CRUZET, some earlier)
Particle detection and reconstruction at the LHC (IV)
CLAS12 Calibration and Commissioning (CALCOM)
CLAS12 Ready for Science Answers to the Homework Questions & Summary/Path Forward Latifa Elouadrhiri Jefferson Lab CLAS12 Ready for Science Review.
CLAS12 - CT meeting 10 October 2013
Power pulsing of AFTER in magnetic field
Overview of CLAS12 Calibration
Barrel RPC Conditions Database
GlueX Electronics Review Jefferson Lab July 23-24, 2003
CLAS12 First Experiment Workshop Report
5% The CMS all silicon tracker simulation
Micromegas Central Tracker
Status of n-XYTER read-out chain at GSI
Preparation of the CLAS12 First Experiment Status and Time-Line
Technische Universität München
CLAS12 Timing Calibration
Micromegas for CLAS12 – Preliminary work on integration
STAR Detector Event selection and triggers Corrections to data
Bringing the ATLAS Muon Spectrometer to Life with Cosmic Rays
Bi-Weekly Meeting 2004/09/08 Susumu Oda
Presentation transcript:

Commissioning and Calibration Strategies for Micromegas Vertex Tracker Before commissioning: Quality assurance and detectors identification Calibration without beam System check-out Commissioning without and with beam October 10 2012 CalCom - S. Aune- J. Ball - F.Sabatié - S. Procureur

1. Quality assurance and Detector identification For each individual detector (18+ spare detectors for Barrel and 6+spare for Forward): Test 1 : Verification of dimensions (flat and curved for Barrel) Optics lab Dimension and cylindricity measurements on dedicated bench lab Test 2 : Gain and energy resolution measurements over the whole detector area Measurements of gain and energy resolution using Fe source October 10 2012 CalCom - S. Aune- J. Ball - F.Sabatié - S. Procureur

CalCom - S. Aune- J. Ball - F.Sabatié - S. Procureur Quality assurance Test 3 : Efficiency and spatial resolution measurements with cosmic run Cosmic bench 3 tiles measured simultaneously (~10 days) Establishing an ID form for each unit October 10 2012 CalCom - S. Aune- J. Ball - F.Sabatié - S. Procureur

Alignement procedure (S. Aune) In order to know the position of each active area (strips) once in the magnet, metrology will be done during integration Each detector will have several printed copper cross-hair Cross hair are made during the strip printing. Each detector will have a glued mechanical support for surveyor needs Distance between cross hair and support measured by optical means (+/- 5 µm) on each tile During barrel tile integration in its structure each tile position will be measured versus supports at the rear of the barrel structure Optical measurement between tiles and barrel structure (+/- 5 µm) During barrel structure integration with the main support tube measurements will be done with support on the support tube. Optical measurement between barrel structure and rear part of the tube (+/- 5 µm) When the support tube will be inserted in the magnet the position measurement at the rear of the tube will give strip position (better than 0,1 mm) October 10 2012 CalCom - S. Aune- J. Ball - F.Sabatié - S. Procureur

CalCom - S. Aune- J. Ball - F.Sabatié - S. Procureur Calibration After integration of the whole barrel and forward on the final mechanical structure: Test 4 : Survey of Barrel and Forward detectors Test 5 : Cosmic run with full Barrel detector in nominal configuration (with full electronics chain) Test 6 : Cosmic run with full Forward detector in horizontal configuration (with full electronics chain) Determination of gain, efficiency, spatial resolution Parameters to adjust : HV of mesh and drift electrodes for each detector, electronics. Slow control will be adapted to CLAS12 general framework. After integration of Micromegas with SVT, full check-out of MSVT: Test 7 : Alignment and Survey of MM versus SVT Test 8 : Cosmic rays with both tracking systems, cross-talk, noise measurements, temperature measurements After integration of full Central Detector : Test 9 : Cosmic rays with all systems on (Magnet on/off) October 10 2012 CalCom - S. Aune- J. Ball - F.Sabatié - S. Procureur

CalCom - S. Aune- J. Ball - F.Sabatié - S. Procureur System Checkout 1. Checkout of Front-End electronics 2. Checkout of the High-Voltage system and distribution 3. Checkout of the Low-Voltage System 4. Checkout of DAQ and Trigger 5. Checkout of gas system 6. Checkout of safety system (interlock LV/HV/cooling/gas/magnet quench) 7. Make sure 4th layer of SVT is removed before installing MVT ;) October 10 2012 CalCom - S. Aune- J. Ball - F.Sabatié - S. Procureur

Commissioning without beam 1. Special runs 1. Pedestal run 2. DREAM diagnostics run 2. Cosmic ray runs 1. Cosmic run w/ solenoid off 2. Cosmic run w/ solenoid @ 0.5*Bmax 3. Cosmic run w/ solenoid @ Bmax October 10 2012 CalCom - S. Aune- J. Ball - F.Sabatié - S. Procureur

Commissioning with beam Geometry/tracking run : multifoil thin targets, maybe lower luminosity (2-3 h/run) 2. Geometry/tracking run w/ B=0 : multifoil thin target, lower luminosity Check resolution, shifts towards simulations, momentum reconstruction 3. Gain adjustment run : regular data taking, but HV adjustments during the run 4. Elastic run, check of the full reconstruction with respect to the field value October 10 2012 CalCom - S. Aune- J. Ball - F.Sabatié - S. Procureur