PLATO Mission: TOU Phase B/C1 preliminary KO meeting:Technical Issues

Slides:



Advertisements
Similar presentations
Leicester SRC, 3-5 Dec 2007 Systems engineering at detector level Tim Stevenson.
Advertisements

Isabella Pagano & Roberto Ragazzoni -
Information Technology Project Management – Third Edition
Thierry RENAGLIA / Ramon FOLCH FP420 Manchester Workshop December 2006 FP420 Connection Cryostat Mechanical Design & Construction Key capabilities of CERN.
1 PROJECT MANAGEMENT ROLE OF KEY PERSONNEL Bernd Madauss International Space University Strasbourg February, 2011
Telescope Optical Units (TOUs)
Plato at ASI Tues 05/May/09Dave Walton Plato meeting Rome Tues 5/May/09 Focal Plane Dave Walton UCL/MSSL, + Leicester University Miguel Mas INTA/CAB +
Daniele Piazza PLATO TOU Meeting, Catania, PLATO - TOU Mechanical Design & Future Activities Osservatorio Astronomico – Catania June 11 th,
Dynamic Systems Development Method (DSDM)
14/06/20151 MORE Requirements seen from ESA Pedro Pablos 1 st MORE Team Meeting 27 Febrero 2007.
1 Introduction to System Engineering G. Nacouzi ME 155B.
Dominion Radio Astrophysical Observatory DVA-1 Reflector Development Timeline Gary Hovey NRC-HIA Dominion Radio Astrophysical Observaotry.
LSU 10/09/2007Project Tasks & Costs1 Defining the Project Tasks, Cost and Schedule Project Management Unit #3.
LSU 07/24/2004Defining Project Tasks1 Defining the Project Tasks Project Management Unit, Lecture 4.
Chapter 2: Overview of Essentials ISE 443 / ETM 543 Fall 2013.
Introduction to RUP Spring Sharif Univ. of Tech.2 Outlines What is RUP? RUP Phases –Inception –Elaboration –Construction –Transition.
Space Engineering 2 © Dr. X Wu, 2012
Intermediate review - ERC – February 9, 2009 – L. Pinard 1 Mirrors Sub-System Overview  Introduction  Scope of the subsystem, main tasks  Job done since.
Tracker Support Tube Tracker EDR November 15th/16th 2000 M.Oriunno CERN/EP Tracker Support Tube Marco Oriunno CERN/EP Division on behalf of Tracker Integration.
VST: dome THE LIFE CYCLE OF MODERN TECHNOLOGICAL PROJECTS Ing. Davide Fierro THE LIFE CYCLE OF MODERN TECHNOLOGICAL PROJECTS.
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
Ahmad Al-Ghoul. Learning Objectives Explain what a project is,, list various attributes of projects. Describe project management, discuss Who uses Project.
1 WP4 – System Testbed Trial 2 preparation Barcelona 3/03/05 Marco Bobbio Pallavicini - Carlo Gavazzi Space SpA.
3.1 Optomechanical systems (1) Scientific and engineering resources are available to carry out the optomechanical work on DECam. The highly distributed.
The System and Software Development Process Instructor: Dr. Hany H. Ammar Dept. of Computer Science and Electrical Engineering, WVU.
1 Mission Discussion & Project Reviews 祝飛鴻 10/14/93.
MAXIM Periscope ISAL Study Highlights ISAL Study beginning 14 April 2003.
GE+ PL INTERFACES, RESSOURCES PLATO PPLC/ESA meeting, Feb 27th 2009.
PACS IBDR 27/28 Feb 2002 PACS PI Summary1 Where we are and where to go… A. Poglitsch MPE.
Verification and Validation — An OSD Perspective — Fred Myers Deputy Director, Test Infrastructure Test Resource Management Center November 4, 2009.
Réunion de présentation des besoins 10 Nov Joël MICHAUD French expertise in SiC for large telescopes.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Local Supports to IDR Discussion ATLAS Upgrade Week November 2014.
JWST Mission CDR Northrop Grumman Space Systems Redondo Beach (CA) April 10-16, 2010.
Advanced Virgo: Optical Simulation and Design Advanced Virgo review Andreas Freise for the OSD Subsystem.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
Introdcution to Workpackage/Activity Reflection D. Schulte.
PLATO Focal Plane Assemblies (FPA) Roser Urquí Centro de Astrobiología (CSIC-INTA)
44222: Information Systems Development
IFU Management Meeting LAM – 15/10/04. Introduction (olf)
V-Shaped Software Development Life Cycle Model. Introduction: Variation of water fall model. Same sequence structure as water fall model. Strong emphasis.
1 Lecture 2.3: SE Process (SEF Ch 3) Dr. John MacCarthy UMBC CMSC 615 Fall, 2006.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
K. Long, 25 June, 2016 IDR: structure and overall timeline: Slides are to introduce discussion of how we prepare IDR. Propose to revise slides as we discuss.
DOE Review, 6/2/2011Answers to Committee Questions – Magnet Systems Answers to committee questions - magnets.
Scope of PCP Phase 1: Solution Design of Q4 First-of-a-kind prototype QUACO Bid Conference, CERN, 07 th July 2016 Arnaud Foussat, CERN TE MSC-LMF Helene.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
News and Introduction from CERN June 15th, 2005
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
The Project Infrastructure
TOU Team PLATO Consortium Campi Bisenzio, 12 Dec 2016.
Spoke CDS PDR Closeout J. G. Weisend II June 10, 2016.
Development Projects / Analysis Projects / On-site Service Projects
The value of a project-oriented approach to IT and how we do it in IBM
Peer Review Agenda (Suggested).
Request for Proposal (RFP)
“The best design is the simplest one that works.” Albert Einstein
Who Wants to be a PMP? Pre-Course Game 3
Lockheed Martin Canada’s SMB Mentoring Program
12th IEEE PES PowerTech Conference
Phase II Collimators : design status
DOD’S PHASED SYSTEM DEVELOPMENT PROCESS
MANAGING THE DEVELOPMENT AND PURCHASE OF INFORMATION SYSTEMS
CS/EE/ME 75(a) Nov. 19, 2018 Today: Prelimnary Design Review Homework.
Project Management Considerations
Project management Ray Veness.
Defining the Project Tasks, Cost and Schedule
GLAST Large Area Telescope:
Presentation transcript:

PLATO Mission: TOU Phase B/C1 preliminary KO meeting:Technical Issues December 12 th, 2016

Summary Contractual section (ASI, Leonardo, TAS-I, MLT) Contract and Technical Annex Deliverable Planning Technical Section ( ESA,ASI, Leonardo, UBE, INAF) Optical Design Mechanical Design Thermical Design Project Team WBS Product Tree Risk analysis PLATO – KO meeting, ASI @@ Ottobre 2016

Technical Section

The experimental work performed during phase-A in support to INAF_Padova permitted us to define the technologies, already addressing and solving some major MAIT criticalities. i.e. the L6-Lens (or the… «Plato Ashtray»)

High rate productions for Space programmes have been experienced by LDO (i.e. Iridium, IRES attitude sensors). High rate are generally based on: Design optimized vs defined MAIT procedures; Balancing of the production line steps with equipment/tem operating in parallel

Strong «joined» cooperation already well established with the team ! Concurrent Engineering is foundamental in the present phase!

Design drivers & risk areas The current opto-mechanical design is the result of a number trade-off and iterations for performance optimizations: Some drawbacks or constrains look difficult to be removed or improved, i.e.: Margins for sufficient budgetting from theoretical design to manufacturing & alignment tolerances. Transmission req.t vs radiation resistance glasses. Lenses form and size (i.e. positive lenses edge thickness; L6 interdistance vs FPA ) Stability of entrance-pupil area vs radiometric stability. Some of the current values still TBC/TBD might result as critical issues (i.e. stability vs thermal-dynamics environment)  compromises shall be defined and agreed by the D-SRR event. Full qualification, not included in B2/C1 phase, of the preselected adhesives for materials (glasses and metals for CTE matching ) is a also a risk area, to be mitigated by early performed dedicated tests.

Design drivers & risk areas Margins for changes appear very limited, unless performing an heavy redesign and new higher level tradeoff , which would not be feasible for the scope and budget of the current phase of the PLATO programme. Scheduling is a severe constraint for any heavy design changes: To have in time mechanics detailed design, material selection & their manufacturing. For the optical materials (critical) procurement. The design optimisation shall be well oriented to the envisaged Phase C/D schedule: A suitable MAIT approach shall be defined to shorten the assembly and aligning phases: reducing DOF of lenses according to sensitivity analysis and lenses shape vs mechanical mounts; definition of tools & jigs; The procurement and verification of the identified procedures equipment, tools, might require the Phase C/D budget. Robust and effective Concurrent Engineering phase shall immediately start.

Design and Development Drivers for B/C1 phase L1 fast aspheric lens manufacturing and test Coating development & qualification Definition detailed MAIT Plan: in particular procedures, equipment & tools for lenses manufacturing « « « for TOU units assembly & alignment « « « for TOU testing BA integration  Feedback from STM to the design Remark : The EM shall finally validate the adopted design solutions, in particular with performance test at operative thermal vacuum enviroment, but the test campaign is planned in the C/D phase.