Principles of Participation in Real-Time Co-optimization

Slides:



Advertisements
Similar presentations
Unresolved Issues in NPRR 555 Texas Steel Companies July 9, 2013.
Advertisements

Loads Acting as a Resource Relationships with QSEs and LSEs
Loads in SCED Comments submitted by Luminant Energy Company, LLC.
1 Nodal Stabilization Market Call December 28, 2010.
ERCOT RMR Deployment and Cost Proposals By: Matt Mereness and Ino Gonzalez.
Lead from the front Texas Nodal Version EDS 3 R6.3 8 Focused Input Test (FIT) II Web Ex Texas Nodal Load Frequency Control.
Day Ahead Market Working Group March 31, Agenda Review minutes - March 24 Coral Proposal - Working Group Discussion Loads/LDCs and DAM.
Storage Integration – Look Ahead SCED Issues for ETWG CAES Perspectives Brandon Whittle ETWG Storage Workshop.
Lead from the front Texas Nodal 1 Texas Nodal Load Frequency Control (LFC) EDS 3 Release 6 - Handbook EDS 3 Release 6 MP Planning.
Day Ahead Market Working Group April 7, Agenda March 31 minutes DAM Feasibility Study - Questions? Coral Proposal - Discussion Generators and.
ERCOT Public 1 Real-Time Co-optimization of Energy & Ancillary Services Operational Issues.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
Resource Adequacy Task Force (RATF) Update to WMS June 12, 2013.
Congestion Management and Ramp Rate for Delivering Ancillary Services Resmi Surendran.
7 August, 2006 TPTF MMS Issues Review Brandon Whittle Lead, Real-Time Market Operations.
DAM Overview: Processes & Tools in the DAM Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) April 2, 2008.
Appeal of PRS Action NPRR 351, Calculate and Post Projected Non-Binding LMPs for the Next 15 Minutes Floyd Trefny Texas Steel Companies.
GTBD Forecasting Using SCED to Produce Projections of Future LMPs Floyd J. Trefny February 17, 2011.
1 Tests for Reasonable LMPs & Price Validation Tool Overview October 27, 2009 NATF.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
February 5, 2008 TPTF 168 Hour Test Follow up discussion.
Price Correction Process Resmi Surendran QMWG 04/10/2015.
ERCOT Public 1 Real-Time Co-optimization of Energy & Ancillary Services Co-ordination of Power Balance Penalty Curve, VOLL, SWOC for AS Demand Curves.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Load Frequency Control (LFC) Business Requirements Energy.
ERCOT Public 1 Overview of ERCOT Concept Paper on Real-Time Co-optimization of Energy & Ancillary Services & Multi-Interval Real-Time Market.
Business Case NPRR 351 Floyd Trefny Amtec Consulting Brenda Crockett Champion Energy Services.
SAWG Update to WMS September 2 nd, 2015 Brandon Whittle.
Scheduling and Operating Transmission Devices in the Nodal Environment.
“Managing the Integration of Energy Storage Technologies” Kenneth Ragsdale ERCOT.
Future Ancillary Services Team (FAST) Update April 24, 2014 TAC Meeting 1.
PRS RPRS Task Force Report from July 27 th Meeting Special PRS Meeting August 2, 2006.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
Analysis of August 13, 2015: ORDC, RRS & PRC Changes Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) November 13, 2015.
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
RDTF June 1, Purpose “The effect of the Shadow Price cap for the Power Balance Constraint is to limit the cost calculated by the SCED optimization.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Update on TPTF Comments on MMS Clarification Notes May 21,
IMM alternate framework for Look-Ahead SCED November 21, 2011.
Lead from the front Texas Nodal 1 Texas Nodal Energy & Market Management System EMS/MMS Projects Requirement Documents November.
Non-Spin Deployment Resmi Surendran. RUC Awarded Ancillary Service Bring Resources On-Line if awarding REG or RRS When awarding Non-Spin – First award.
Use of ONTEST Resource Status over Telemetry: – ERCOT protocol permits the use of telemetered Resource Status code “ONTEST” during periods of start-up.
NPRR784 Mitigated Offer Caps for RMR Units Protocol Revision Subcommittee June 16,
ERCOT Market Education Market Role in Emergency Operations OTS 2016.
ROS Presentation: Dynamic Scheduling and EEA Austin, TX September 10, 2009 Steve Isser Vice President and General Counsel Good Company Associates
NSRS in Nodal Proposal for Deployment & Recall Procedures ERCOT ROS 10/12-13/2006 By: S.Niemeyer R.Jones R.Wheeler B.Green J.Dumas P.Breitzman.
“Look Ahead SCED” Sai Moorty ERCOT November 28, 2011.
Market Trials Update NATF March 2,
Market Trials Open Market Participant Call
Nodal Program Update to Cops
Cutover Market Call November 29, :30 PM
Market Continuity Update to TAC Joel Mickey
EDS 3 R6.3 Testing Workshop EDS 3 Release 6.3 LFC Web Ex June 11, 2008
NPRRs 815NPRR Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service.  This Nodal Protocol Revision Request (NPRR) revises.
Current FRRS Language & Explanation of Posted Data
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS)
John Dumas Director, Wholesale Market Operations
Real-Time Co-Optimization:
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
Ancillary Service Trades and Ancillary Service Settlement
Congestion Management and Ramp Rate for Delivering Ancillary Services
Real-Time Co-optimization of Energy & Ancillary Services
Real-Time Co-optimization of Energy & Ancillary Services
PDCWG David Kee, Chair Sydney Niemeyer, Vice Chair
Paul Wattles, Sai Moorty ERCOT Market Design & Development
The New Texas Wholesale/Retail Market
Texas Nodal Load Frequency Control (LFC) EDS 3 R6
Market Trials Open Market Participant Call
EE362G - Smart Grids: How Smart Are We Today
Load Participation in SCED v1 Overview & Refresher
Presentation transcript:

Principles of Participation in Real-Time Co-optimization Floyd J. Trefny July 10, 2017

Principles Physical Responsive Reserve used in managing scarcity actions by the ERCOT Operator must be within a tolerance of total reserves available for dispatch in RT Co-0ptimization Any Generation Resource offers made in the DAM must continue to be valid in Real Time unless the Generation Resource has failed equipment enabling AS participation

Principles Generation Resources who self-schedule AS in the DAM, must provide AS offers in Real Time For Generation Resources that do not have AS and Energy offers in Real Time valid up to and including the Resource’s HSL, ERCOT will create an offer curve for AS and Energy up to and include HSL at SWOC.  Generation Resources without valid offers are subject to review by the IMM

Principles Load Resources awarded RRS in DAM may not participate in RT Co-optimization and must remain in service unless deployed by frequency deviation or Dispatch Instruction Load Resources providing any AS except RRS must also provide RT “bid” prices for energy RT Co-Optimization software systems will include special software that runs 15 minutes ahead of SCED to detect data and offer errors and alarm QSE and ERCOT operators of problems before SCED uses invalid data for dispatch Other Scenarios?