Wednesday 8.9 External crossing angles:

Slides:



Advertisements
Similar presentations
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Advertisements

Sat/Sun 26/27 th March Sat 18h20: Stable beams. Fill #1653. Sun 10h02: Stable beams continued. vdM scans. Length calibrations. 16h59: Beam dump. Delivered.
Lot’s of time lost due to cryo problem in IR8. Major impact, therefore review of MD program… Start discussion here, please let us know your input. Will.
LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
02/09/2010 Access conditions for test of the RB.A23 at 17:30. Splice mapping. Complete machine closed by ~18:00.Problems in getting TI2 ready for injection.
ION COMMISSIONING REVISITED 1 Thanks to: John Jowett, Walter Venturini. Matteo Solfaroli.
LHC progress Report LHCC Wednesday 23 rd March 2011.
Tuesday 17 th April 04:00 Prepare second fill for v/d Meer scans. 06:22 Stable beams, v/d Meer scans for Alice and LHCb. 13:20 End v/d Meer scans.Dump.
MD Wed – Sat DayTimeMD Wed06:00UPS repair, ATS optics checks w/o beam 12:00Cycle, test ATS optics w/o beam 16: TeV: BPM offset determination for.
LHC progress Sunday 3rd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Injection and protection W.Bartmann, C.Bracco, B.Goddard, V.Kain, M.Meddahi, V.Mertens, A.Nord, J.Uythoven, J.Wenninger, OP, BI, CO, ABP, collimation,
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
CONTENT: Beam characteristics and MP concerns BI configuration Operational settings Collimators Planning Shift breakdown Thanks to: P.Baudrenghien, G.Bellodi,
Cryo back at 17:30 Beam back at 19:00 IR2 aperture until ~03:00 Since then no beam from the SPS:  Connector problem on MKD  Connector eroded, needs to.
LHC Machine Operational Status and Plans LHCC, 22nd September 2010 Steve Myers (On behalf of the LHC team and international collaborators)
04h36: Cryo problem in arc 81. Access. 09h14: Injection.  TI8 injection collimator setup.  Testing new sequence.  New version of vacuum application.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
Floating MD week 28 summary
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
MD Planning Fri – Sat (26. – 27.8.)
1st LHC MD Period Started
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Day :00-11:30: Optics at 3.5 TeV Optics re-measured with AC-dipole. Excellent reproducibility. Small emittance increase from AC-dipole. Collapsed.
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Wednesday 21 March 2012.
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Summary Friday h38: Ramp down and pre-cycle.
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
LHC Morning Meeting - G. Arduini
Summary of Week 11: 14 – 21 March
Summary of week 44 Aims of week 44 J. Wenninger & J. Uythoven
Monday – recovery from MKI flashover
LHC commissioning Week 38
Mon 22/8 – Tue 23/8 00:07 stable beams #2040. Initial luminosities: 2.1x1033 cm-2s-1 18:00 Programmed dump. End of physics #2040. ~83 pb-1 in ~18 hours.
Coordination by E. B. Holzer & J. Wenninger Production
Saturday 2/4/ :00-09:00 Problems with SPS:
Week 35 – Technical Stop and Restart
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Monday Morning – recovery from cryo.
Monday February 28th 8h00: Injection
Week 36 Machine coordinators R.Assmann, R.Bailey
Friday morning 10:30 Optics measurements and corrections.
Thursday :00: Physics fill from the night shift
Yesterday morning Held 1647 for a while – SPS kicker problem
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
Saturday 7th May Sat – Sun night
(on behalf of the LHC team)
Summary Thursday h21: Stable beams fill #1303.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Aims for the week Recover from technical stop and precycle at 10A/s
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Tuesday morning 08:30-09:00 Squeeze with probe.
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
Wednesday h10: Programmed dump. 07h54: Injection. 200b.
Summary for LPC (March 7th, Ralph Assmann)
Summary Tuesday h23: Machine closed. Precycle started.
LHC status - Week 35 G. Arduini, M. Lamont Main aims:
Wednesday 23/2 Thanks CRYO!!!.
Fri :52 Stable beams fill #2536
Thursday Aperture studies (foreseen until ~ midday, nothing done) Problems with single bunch B2 from SPS (extraction kicker not enabled) Setting.
Wednesday h18: 228b fill lost just before start of ramp.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Injection Studies: 50 ns ABT/BTP.
Another Immortal Fill….
Tuesday 6th April 8:00 Injection studies 16:00 RF studies
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

Wednesday 8.9 External crossing angles: IR1: -170 mrad at inj./ramp and -100 mrad in squeeze/collision IR2: +170 mrad at inj./ramp and +110 mrad squeeze+collision IR5: +170 mrad at inj./ramp and +100 mrad in squeeze/collision IR8: -170 mrad at inj./ramp and -100 mrad in squeeze/collision Good for beam-beam (do we need it for 150ns ?) Bad for aperture and MP (are we ready to do this ?) Strategy (Wednesday) Work with nominal angles at injection See if we can run like this Measure IR apertures Test parasitic beam-beam with lower angles Decide (Friday?) 8:30 meeting

Wednesday 8.9 07h00: Scheduled access for QPS*3, RF, CMS, ALICE 12h00: Recover but then problems RF module. We now work with 2B2 klystron off. Lost sector 81 due to electrical problem (access needed) 14h00: Started injection work in TL to TEDS Centering checks of 5 TCDIs with trains of 4 ~nominal Some offsets of up to 0.5 sigma found and corrected Gaps at +- 4.5 sigma 8:30 meeting

Wednesday 8.9 19h00: Continuation commissioning of injection of bunch trains Centering of collimators with trains of 4 ~nominal Started with interleaved B1 and B2, but a lot of uncaptured beam, B1 We had 7 batches in B1 and 6 in B2 Both beams dumped with unbunched beam on TDI giving losses B1 Partial data taken for both beams 8:30 meeting

Wednesday 8.9 21h00: Continuation commissioning of injection of bunch trains Beam 2 only Losses increase at +1.5 sigma, no increase out to -2.5 sigma 13 * 4 trains of ~nominal Clean beam dump Beam 1 only … SPS off at 22h BA1 transformer 8:30 meeting

Wednesday 8.9 23h00: Continuation commissioning of injection of bunch trains Beam 1 only SPS off at 23.30 BA1 transformer again ***SUMMARY of INJECTION STUDIES*** Checking TL collimators with bunch train injections (4 nominal bunches): moved the gap, recorded losses in TL and LHC injection region centered the following collimators: TCDIV.20607 TCDIH.29050 TCDIV.29012 TCDIH.29205 TCDIH.87441 TCDIV.87645 Stopped centering of TCDIH.29645 due to SPS injection transformer problem. All new settings are trimmed into LSA and thresholds adjusted. 8:30 meeting

Wednesday 8.9 Night Ramp, but beam lost protection interlock Had to mask collimator position interlocks, one was missed Ramp OK Trimmed Xing angles 1 and 2 to 100 and 110 and corrected closure Lost B1 with a corrector trip when doing IR5 Continued with B2, Xing angles 5 and 8 to 100 and 100 Squeeze B2 Brief optics studies on B2 Global correction Impressive results ! IP1 3.22 0.22 3.62 0.40 IP2 3.83 0.61 3.43 0.26 IP5 3.67 0.07 3.28 0.25 IP8 3.26 0.10 3.51 0.09 8:30 meeting

Thursday 9.9 Aperture studies (until ~ midday) Continuation commissioning of injection of bunch trains Still 2 shifts needed Beam 1 capture issues Orbit cleaning 8:30 meeting

Week Planning 9 Thu M 5 IR aperture measurement at 450GeV A 11 Injection / injection protection - crossing angles ON, injection protection N 8 Ramp test with new collimator functions (1e10 the 1e11). PLL in parallel ? 10 Fri Injection / injection protection: crossing angles ON - injection of trains of 12 3 First look at beam-beam with trains of 12 Ramp of 1e11. RF longitudinal blowup. V reduction at injection. Reserve Sat RF set up with 4 bunches of 150ns spacing. Transverse feedback. Collimation set up at 3.5TeV. End of ramp and after Xing angle change. Loss maps. 12 Sun Collimation set up at 3.5TeV. End of squeeze and collision settings. 13 Mon Injection / injection protection: crossing angles ON - injection of trains of 4 RF set-up with more batches at injection Collimation set up at 3.5TeV and loss maps. 14 Tue Collisions ? 8:30 meeting