Entergy Integration Study Update

Slides:



Advertisements
Similar presentations
October 16, 2009 RPG Meeting ERCOT RPG Project Review Update Jeff Billo.
Advertisements

Jan 22, 2013 RPG Meeting Sharyland Atlas-Driver Load Integration Project – EIR update.
Company LOGO Cleco Planning Process. Models Cleco uses SPP’s annual series of models to determine the NERC reliability violations. Cleco uses SPP or VST.
Regional Planning Group Project
Entergy Transmission Planning Summit New Orleans, LA July 10, 2003
Connection of Wind Farms to Weak AC networks – ERCOT Experience and Challenges Shun-Hsien (Fred) Huang ERCOT System Planning CIGRE WG B4.62 Meeting June.
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
Oncor Electric Delivery Company LLC TOGETHER WE DELIVER ODESSA UPDATE Jan 22, 2013 Presentation to ERCOT Regional Planning Group Austin, TX Mike Juricek.
Houston Region Import Capacity Project August 27, 2013 Regional Planning Group Meeting.
System Strength Discussion
BRAZOS ELECTRIC COOPERATIVE Dobbin 345 Project David Albers, P.E. Manager – System Planning.
Tres Amigas Presentation Team
Entergy Transmission Planning Summit New Orleans, LA July 8, 2004
Jan 13, 2012 RPG Meeting El Campo – Vanderbilt 69 kV Project – Status report Ehsan Ur Rehman Planning Engineer ERCOT.
October 12, 2007 ERCOT Regional Planning Group Meeting RPG-CREZ Task Force Status Report Warren Lasher System Assessment.
111 TAG Meeting June 8, 2015 Teleconference / Webinar FINAL.
George Bartlett Director, Transmission Operations Economic Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Turkish Power System Overview March 2012
1 The following are the planned transmission project at SCL for the next ten year. All the projects has no major impact to the bulk transmission system.
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
1 Update on the 2006 Transmission Study LPSC B&E Meeting Baton Rouge, LA November 29, 2006.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Transmission Planning Summit.
1 Entergy Texas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 29, 2008.
Aug 17, 2012 RPG Meeting KEC & MEC – Load Addition Project – ERCOT Independent Review Ehsan Ur Rehman Planning Engineer ERCOT.
John Dumas Director of Wholesale Market Operations Jeff Billo Manager of Mid Term Planning Dan Jones Director with Potomac Economics, the ERCOT IMM Board.
Kurten Switch Project ERCOT Board of Directors Bill Bojorquez System Planning December 13, 2005.
October 16, 2009 RPG Meeting ERCOT 2009 Five-Year Transmission Plan Update Jeff Billo.
1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
Jones Creek Project Submitted to RPG on July 7, 2014 July 22, 2014 Regional Planning Group Meeting.
1 Entergy Louisiana, Inc. (South) & Entergy New Orleans, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans,
1 Entergy Louisiana, Inc. (South) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
Dale Osborn Midwest ISO October 13, 2008 EE 590 Transmission Planning with Significant Energy Resources.
November 12, 2010 Regional Planning Group Long-Term System Assessment Project Update Warren Lasher Manager, Long-Term Planning and Policy Jonathan Rose.
April 16, 2010 RPG Meeting Lamesa Area Upgrades ERCOT Independent Review Jeff Billo.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 31, 2007.
OFFSHORE WIND CONNECTION & COSTS Mary Doswell Alternative Energy Solutions December 7 th, 2010.
Jeff Billo Manager, ERCOT Transmission Planning Kenedy to Nixon to Seguin Line Upgrade Project Regional Planning Group (RPG) Review; ERCOT Independent.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
TAC02/01/2007 DW 1 TAC Briefing on: - Report on Constraints and Needs: Five Year Plan Development - Long Term System Assessment (LTSA) - Entergy Integration.
SPP.org 1. Final Report: Reliability and Economic Assessments Stakeholder Meeting December 1, 2008 Austin, TX.
ERCOT TAC11/2/ CREZ Study Update ERCOT TAC 11/2/2006.
ERCOT Independent Review
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting June 20 th, 2008 Austin, TX.
September 1, 2011 TAC Lower Rio Grande Valley Regional Planning Group Project Jeff Billo Manager, Mid-Term Planning.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
Panhandle Renewable Energy Zone (PREZ) Study
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
Transmission Services Report: North and West RPG Projects Bill Bojorquez TAC July 7, 2005.
August 24, 2007 ERCOT Regional Planning Group Meeting CREZ Transmission Optimization Study Warren Lasher System Assessment.
December 14, 2007 RPG - CREZ Meeting CREZ Transmission Optimization Study: Update Warren Lasher ERCOT System Assessment.
RMR Exit Strategies Update TAC November 6, RMR UNITS.
LINE 69H REBUILD AND CONVERSION PROJECT ERCOT Regional Planning Group April 21,2016.
03/06/2008 TAC CREZ Transmission Optimization (CTO) Study Update Dan Woodfin Director, System Planning.
SPP.org 1. Regional and Inter-Regional Planning Update Entergy Transmission Summit July 29, 2008 Astor Crown Plaza New Orleans, Louisiana.
R ENEWABLE E NERGY IN T EXAS Jess Totten Public Utility Commission of Texas 1.
1 Entergy Gulf States, Inc. (Texas) Approved & Proposed Transmission Reliability Projects Entergy/ETEC Subcommittee Meeting The Woodlands, TX November.
RPG - 10/12/2007 Competitive Renewable Energy Zones (CREZ) Update Bill Bojorquez Vice President, System Planning.
Houston Import Study Update
ERCOT – LP&L Study Status Update
Freeport Area Master Plan Project -
Nebraska Wind Conference Wednesday, November 16, 2011
Barrilla Junction Area Transmission Improvements Project
Status Update for Reliability/Market Power Mitigation Assessment
Warren Lasher Manager, Long-Term Planning and Policy
I-5 Corridor Reinforcement Project
WECC Annual Meeting 9/11/2018 Cameron Warren
WECC Annual Meeting 9/11/2018 Cameron Warren
Strategic Plan and Economic Upgrade Process
Presentation transcript:

Entergy Integration Study Update Jonathan Rose Cathey Carter Warren Lasher Regional Planning Group November 14, 2008

Purpose To update the Phase II Entergy Integration Study (completed 12/2006) with input assumptions that are consistent with a contemporaneous study being conducted by SPP Study is nearly complete and report is in review. November 14, 2008 Regional Planning Group

Entergy Area Overview November 14, 2008 Regional Planning Group

Study Assumptions Base case built from 2012 case of 2007 5-Year Plan Delivered natural gas price: $7/MMBtu Includes all generating units in ERCOT and Entergy operating today or with signed interconnection agreements as of July 1, 2008 Cost estimates for transmission improvements provided by Entergy-Texas, Inc. November 14, 2008 Regional Planning Group

Asynchronous Ties Ties provided for SPP reliability and for contractual obligations and power purchase agreements. 100 MW asynchronous tie at Quarry, halfway between Grimes and Crockett. 827 MW asynchronous ties at Hartburg. 244 MW on the 500-kV Hartburg bus. 583 MW on the 230-kV Hartburg bus. November 14, 2008 Regional Planning Group

Major Reliability Projects Extend the existing ERCOT 345-kV Kuykendahl – King line to the Entergy Porter substation; install one 345-kV/138-kV autotransformer at Porter. ($54,710,000) New single-circuit 345-kV line from the ERCOT Roans Prairie substation to the Entergy Grimes substation. ($8,030,000) New 345-kV line from Quarry to Entergy Rivtrin substation. ($33,000,000) Rebuild the Entergy 69-kV line from Fawl to Kirbyville as a 138-kV line and tie to the Entergy 138-kV Kirbyville substation. ($16,510,000). Rebuild the existing Entergy 138-kV line between the Porter and Oakridge substations. ($5,429,000). Upgrade the existing Entergy 138-kV line between the Navasota and Longmire substations ($27,827,000). Upgrade the existing 69-kV lines from the Sourlake to Dome substations, the Dome to Batson substations, and the Gallier to Elizabeth substations ($11,586,000) Total cost of all reliability projects (including asynchronous ties): $486 million November 14, 2008 Regional Planning Group

Major Reliability Projects November 14, 2008 Regional Planning Group

Economic Projects Add a second 500-kV/230-kV autotransformer at the Hartburg substation ($19,800,000) Install one 345-kV/138-kV 800-MVA autotransformer at Porter rather than the 400-MVA auto, as called for in the reliability project list. ($10,800,000) Second 230-kV circuit from the Hartburg to Sabine substations on new towers. ($30,180,000) Close the Dayton-Crosby 138-kV line and upgrade the line to a rating of 531 MVA. ($11,834,000) Construct a new substation at Canal, tapping the 345-kV line connecting the Cedar and N Belt substations. Construct a 345-kV line between the Cypress, China and Canal substations. Install new autotransformers at China and Cypress substations. ($225,600,000) Total cost of economic-driven projects: $298 million. Modeled production cost benefits: $63 million. November 14, 2008 Regional Planning Group

Economic Projects November 14, 2008 Regional Planning Group

Scenarios All CREZ wind (an additional 11,553 MW) Delivered natural gas price: $11/MMBtu Reduced asynchronous tie capacity at Hartburg (244 MW) Cottonwood generator in the Eastern Interconnect Additional 345-kV line from Deweyville to Canal (Kelson proposal) November 14, 2008 Regional Planning Group

Questions? November 14, 2008 Regional Planning Group