Real-Time Co-optimization of Energy & Ancillary Services

Slides:



Advertisements
Similar presentations
INSULATING PRICE RESPONSIVE LOAD FROM RUC CAPACITY SHORT CHARGE Mark W. Smith J. Kay Trostle August 2008 DSWG.
Advertisements

NPRR 206 DAM Credit Requirements Reduction: E Values and Percentiles Luminant Proposal.
ERCOT Draft NPRR Phase 2 ORDC RATF July 8, ERCOT draft NPRR Phase 2 ORDC Draft NPRR will include the following clarifications or additions: Updates.
NPRR 532 Performance Measurement & Verification and Telemetry Requirements for Load Resources providing Non-Spin David Kee CPS Energy Energy Supply & Market.
NPRR605 Ancillary Service Make-Whole Payments Under a Watch.
Loads Acting as a Resource Relationships with QSEs and LSEs
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Ancillary Services – Day-Ahead & Real Time Markets Mini Market.
ERCOT Public 1 AS Demand Curves for Real-Time Co-optimization of Energy & Ancillary Services.
April 23, 2014 DSWG Loads in SCEDv1 Load Participation in SCED v1 Overview & Refresher ERCOT Staff.
1 Generator Telemetry and Market Prices WebEx Training July 28 th, 2015.
Loads in SCED Comments submitted by Luminant Energy Company, LLC.
ERCOT Tool to manage unexpected incremental load November 16, 2006.
ERCOT RMR Deployment and Cost Proposals By: Matt Mereness and Ino Gonzalez.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
May 29, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott June 3, 2014 TAC Update to RMS 1.
Real Time Mitigation During Exceptional Fuel Cost Events.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes January 28, 2009 WMS Meeting.
Day Ahead Market Working Group March 31, Agenda Review minutes - March 24 Coral Proposal - Working Group Discussion Loads/LDCs and DAM.
Settlement of Mothballed RMR Resources for System Capacity November 15, 2011 RDTF Meeting Ino González ERCOT November 14, 2011.
August 17, 2011 Reliability Deployments Task Force Meeting Updated Analysis of Non-Spin Deployments and RUC John Dumas Director Wholesale Market Operations.
E x p e r i e n c e C o m m i t m e n t SM ERCOT Nodal – Fuel Cost Analysis Verifiable Cost Working Group October 6, 2008.
Grabbing Balancing Up Load (BUL) by the Horns December 2006.
ERCOT Public 1 Real-Time Co-optimization of Energy & Ancillary Services Operational Issues.
Nodal Settlement Delta Calculations and Statements – 7/11/06 Workshop  Objective: Describe design concepts of nodal settlement delta calculations and.
Nodal Program Update and SEWG Update COPS 1/11/2011 Jim Galvin.
Loads in SCED Comments submitted by Luminant Energy Company, LLC.
RCWG Update to WMS December 5, General Update Agenda Items for Today: Verifiable Cost Manual clarifications (vote) White Paper on Long Term Fuel.
QMWG – Feb. 26, 2014 Discussion topic: NPRR585 Clarification of Administrative Pricing Requirements for Self-Committed Combined Cycle Combustion Turbines.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
RATF Report to WMS Report of RATF meeting held March 3, 2014.
Resource Adequacy Task Force (RATF) Update to WMS June 12, 2013.
Congestion Management and Ramp Rate for Delivering Ancillary Services Resmi Surendran.
DAM Overview: Processes & Tools in the DAM Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) April 2, 2008.
SAWG Update to WMS April 6 th, 2015 Brandon Whittle.
ERCOT Public 1 Real-Time Co-optimization of Energy & Ancillary Services Co-ordination of Power Balance Penalty Curve, VOLL, SWOC for AS Demand Curves.
ERCOT Public 1 Overview of ERCOT Concept Paper on Real-Time Co-optimization of Energy & Ancillary Services & Multi-Interval Real-Time Market.
Programs/Products that ERCOT Does Not Presently Offer ERCOT Demand Side Working Group New DR Product Options Subgroup Jay Zarnikau Frontier Associates.
SAWG Update to WMS September 2 nd, 2015 Brandon Whittle.
“Managing the Integration of Energy Storage Technologies” Kenneth Ragsdale ERCOT.
Settlement Update Blake Holt ERCOT 2/15/2016. Agenda NPRR689 – R1 – 02/10/16 NPRR744 – Buy-Back notification NPRR746 – Negative load impacts 2016 Settlement.
DSWG Update to WMS 2/9/2011. EILS Procurement Results from 1/31 Business Hours 1 HE 0900 through 1300, Monday thru Friday except ERCOT Holidays; 425 hours.
NPRRs NPRR649 Lost Opportunity Payments for HDL Manual Overrides. This Nodal Protocol Revision Request (NPRR) proposes two options for a lost opportunity.
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
NPRR680 background concept Carrie Bivens Manager, Day-Ahead Market PRS February 12, 2015.
ERCOT Public 1 AS Demand Curves for Real-Time Co-optimization of Energy & Ancillary Services.
1 Exposure Stress Testing CWG/MCWG Suresh Pabbisetty, CQF, CSQA. ERCOT Public June 12, 2014.
Resource Adequacy Task Force (RATF) Update to WMS October 8, 2013.
ERCOT Monthly Operational Overview (January 2015) ERCOT Public February 15, 2015.
RATF Policy Decisions Progress Report of RATF May 29, 2014.
September 23, 2011 Report On ERCOT Action Items From September 6, 2011 RTDF Meeting John Dumas ERCOT.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes November 12, 2008 VCWG Meeting.
Money Transfer Due to Real-Time Irresolvable Constraint Resmi Surendran ERCOT.
Settlement of Ancillary Service Infeasibility ERCOT QMWG April 15, 2016.
Reliability Must Run Resources for Summer Slide 2 RMR for Summer 2011 RMR Contracts for Mothballed Units ERCOT has signed RMR Agreements with two.
Day Ahead Market QSE’s Credit Requirements Concerns and Solutions August 14, 2008.
Non-Spin Deployment Resmi Surendran. RUC Awarded Ancillary Service Bring Resources On-Line if awarding REG or RRS When awarding Non-Spin – First award.
ERCOT Market Education Market Role in Emergency Operations OTS 2016.
“Look Ahead SCED” Sai Moorty ERCOT November 28, 2011.
CRR Deration and NPRR821 WMS 09/06/2017.
Nodal Program Update to Cops
General Overview Of Resource Costs
RTDF Overview of Data Analysis & Status of “Consesus Items”
Real-Time Co-Optimization:
Congestion Management and Ramp Rate for Delivering Ancillary Services
Real-Time Co-optimization of Energy & Ancillary Services
Principles of Participation in Real-Time Co-optimization
Paul Wattles, Sai Moorty ERCOT Market Design & Development
NPRR829 Incorporate Real-Time Telemetered Net Generation for Non-Modeled Generation into the Real-Time Liability Estimate ERCOT PRS Meeting May 11, 2017.
Mod_38_18 Limitation of Capacity Market Difference Payments to Loss Adjusted Metered Quantity. 12th December 2018.
Load Participation in SCED v1 Overview & Refresher
Presentation transcript:

Real-Time Co-optimization of Energy & Ancillary Services Examples of Load Resource Settlement Options

RT Energy + Ancillary Service Co-Optimization Homework: Provide example of Settlement for Load Resource buy back exemption impact Language per ERCOT Concept Paper for Real-Time Market Improvements: Co-optimization of Energy and Ancillary Services & Multi-Interval Real-Time Market 2.4 Telemetry Changes for LR with UFR (blocky AS) Upon deployment will be exempt from AS imbalance charge 2. In RT, LR with UFR carrying RRS responsibility will be considered to be price takers (i.e. RRS offer from these LR = 0$/MW). i.e no reduction of RRS demand curve by the amount of RRS responsibility from Load Resources. 3. However, when deployed, LR will be considered to be still providing RRS till the 3 hour limit after recall. Slide #5

RT Energy + Ancillary Service Co-Optimization Load Resource deployment due to Frequency event with a 3 hour return to service MW GTBD before Load Drop GTBD after Load Drop Reserves before Load Drop Slide #5 Reserves after Load Drop t t + 3 hours

RT Energy + Ancillary Service Co-Optimization Provide example of Settlement of Load Resource buy back exemption impact Settlement of current ORDC with buy back Resource has full DAM Hedge and is deployed in RT: Non-Controllable Load Resource - Current ORDC with Buy Back Time DAM Purchase Award (MW) DAM AS Award (MW) DAM SPP ($/MWh) DAM MCPC ($/MWh) DAM Energy Amount ($) DAM AS Payment ($) DAM Total ($) RTSPP ($/MWh) Price Adder P_S ($/MWh) RTSPP New ($/MWh) RTAML (MWh) LZ Energy Imbalance (MWh) RT Energy Imbalance Pmnt/Chrg ($) RT Online Reserve Imbalance (MWh) RT Online Reserve Imbalance Pmnt/Chrg ($) RT Total Imbalance Payment (Energy + AS + RUC Awd) ($) Daily Net Payment or Charge to Resource (DAM + RT) HE16 :00 20 $ 582 $ 572 $11,643.00 $(11,447.80) $ 195.20 $ 738 $ 351 $ 1,089 $ (21,784.40) -20 $ 7,015.00 $(14,769.40) $ (14,574.20) HE16 :15 $ 180 $ 419 $ 599 $ (11,971.40) $ 8,371.60 $ (3,599.80) $ (3,404.60) HE16 :30 $ 98 $ 292 $ 390 $ (7,799.40) $ 5,831.80 $ (1,967.60) $ (1,772.40) HE16 :45 $ 615 $ 441 $ 1,057 $ (21,131.80) $ 8,829.80 $(12,302.00) $ (12,106.80) HE17 :00 $ 151 $ 142 $ 3,029.80 $ (2,838.00) $ 191.80 $ 173 $ 462 $ 635 $ (12,708.00) $ 9,249.20 $ (3,458.80) $ (3,267.00) HE17 :15 $ 346 $ 508 $ 853 $ (17,066.80) $ 10,151.60 $ (6,915.20) $ (6,723.40) HE17 :30 $ 445 $ 625 $ (12,501.60) $ 8,895.20 $ (3,606.40) $ (3,414.60) HE17 :45 $ 147 $ 411 $ 558 $ (11,150.00) $ 8,216.40 $ (2,933.60) $ (2,741.80) HE18 :00 $ 68 $ 58 $ 1,352.60 $ (1,156.40) $ 196.20 $ 101 $ 252 $ 353 $ (7,067.80) $ 5,042.00 $ (2,025.80) $ (1,829.60) HE18 :15 $ 76 $ 172 $ 248 $ (4,962.60) $ 3,439.80 $ (1,522.80) $ (1,326.60) HE18 :30 $ 60 $ 49 $ 109 $ (2,172.40) $ 980.40 $ (1,192.00) $ (995.80) HE18 :45 $ 54 $ 17 $ 71 $ (1,425.40) $ 344.40 $ (1,081.00) $ (884.80) $ (53,041.60) Slide #5

RT Energy + Ancillary Service Co-Optimization RT Co-Optimization Proposed - EXEMPT from AS Imbalance Note: The current RT Online Price adder is used as a proxy for the RT AS MCPC Time DAM Purchase Award (MW) DAM AS Award (MW) DAM SPP ($/MWh) DAM MCPC ($/MWh) DAM Energy Amount ($) DAM AS Payment ($) DAM Total ($) RTSPP ($/MWh) RT MCPC RTAML (MWh) LZ Energy Imbalance (MWh) RT Energy Imbalance Pmnt/Chrg ($) RTM AS Award (MW) AS Imbalance DA Award - RT Award RT Online AS Imbalance Pmnt/Chrg ($) Daily Net Payment or Charge to Resource (DAM + RT) HE16 :00 20 $ 582 $ 572 $11,643.00 $(11,447.80) $ 195.20 $ 1,089 $ 351 $(21,784.40) - $ (21,589.20) HE16 :15 $ 599 $ 419 $(11,971.40) $ (11,776.20) HE16 :30 $ 390 $ 292 $ (7,799.40) $ (7,604.20) HE16 :45 $ 1,057 $ 441 $(21,131.80) $ (20,936.60) HE17 :00 $ 151 $ 142 $ 3,029.80 $ (2,838.00) $ 191.80 $ 635 $ 462 $(12,708.00) $ (12,516.20) HE17 :15 $ 853 $ 508 $(17,066.80) $ (16,875.00) HE17 :30 $ 625 $ 445 $(12,501.60) $ (12,309.80) HE17 :45 $ 558 $ 411 $(11,150.00) $ (10,958.20) HE18 :00 $ 68 $ 58 $ 1,352.60 $ (1,156.40) $ 196.20 $ 353 $ 252 $ (7,067.80) $ (6,871.60) HE18 :15 $ 248 $ 172 $ (4,962.60) $ (4,766.40) HE18 :30 $ 109 $ 49 $ (2,172.40) $ (1,976.20) HE18 :45 $ 71 $ 17 $ (1,425.40) $ (1,229.20) $ (129,408.80) RT Co-Optimization Proposed - If NOT EXEMPT from AS Imbalance Note: The current RT Online Price adder is used as a proxy for the RT AS MCPC Time DAM Purchase Award (MW) DAM AS Award (MW) DAM SPP ($/MWh) DAM MCPC ($/MWh) DAM Energy Amount ($) DAM AS Payment ($) DAM Total ($) RTSPP ($/MWh) RT MCPC RTAML (MWh) LZ Energy Imbalance (MWh) RT Energy Imbalance Pmnt/Chrg ($) RTM AS Award (MW) AS Imbalance DA Award - RT Award RT Online AS Imbalance Pmnt/Chrg ($) Daily Net Payment or Charge to Resource (DAM + RT) HE16 :00 20 $ 582 $ 572 $11,643.00 $(11,447.80) $ 195.20 $ 1,089 $ 351 $(21,784.40) 7,015 $ (14,574.20) HE16 :15 $ 599 $ 419 $(11,971.40) 8,372 $ (3,404.60) HE16 :30 $ 390 $ 292 $ (7,799.40) 5,832 $ (1,772.40) HE16 :45 $ 1,057 $ 441 $(21,131.80) 8,830 $ (12,106.80) HE17 :00 $ 151 $ 142 $ 3,029.80 $ (2,838.00) $ 191.80 $ 635 $ 462 $(12,708.00) 9,249 $ (3,267.00) HE17 :15 $ 853 $ 508 $(17,066.80) 10,152 $ (6,723.40) HE17 :30 $ 625 $ 445 $(12,501.60) 8,895 $ (3,414.60) HE17 :45 $ 558 $ 411 $(11,150.00) 8,216 $ (2,741.80) HE18 :00 $ 68 $ 58 $ 1,352.60 $ (1,156.40) $ 196.20 $ 353 $ 252 $ (7,067.80) 5,042 $ (1,829.60) HE18 :15 $ 248 $ 172 $ (4,962.60) 3,440 $ (1,326.60) HE18 :30 $ 109 $ 49 $ (2,172.40) 980 $ (995.80) HE18 :45 $ 71 $ 17 $ (1,425.40) 344 $ (884.80) $ (53,041.60) Slide #5