Capacity allocation in natural gas transmission networks Pilot framework guideline - Public consultation results and new content of guidelines - Dr.

Slides:



Advertisements
Similar presentations
Update on Transparency Obligations Martin Reisner Junior Adviser, Transparency ENTSOGs Transparency Workshop Brussels – 11 September 2012.
Advertisements

North / North West Region Regional Gas Initiative Regulatory Co-ordination Workshop 8 th February 2007.
Framework Guideline on gas capacity allocation Stefanie Neveling, Co-Chair CAM TF 20 th Madrid Forum, 27 September 2011.
Adeline Lassource (CRE) Charlotte Ramsay (OFGEM) 10 th FUI SG, London, 11 th March 2011 Progress with market integration: European initiatives and impact.
Madrid, 7 th February th SG Meeting South Gas Regional Initiative.
Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
26 th IG meeting 23 th January 2014 Enagás, REN and TIGF Issues to be discussed.
Guidelines for Good Third Party Access Practice For LNG System Operators (GGPLNG) Rocío Prieto ERGEG’s Gas Focus Group (GFG) XIV Madrid Forum, May.
2. EU Tariff Code – Emerging Issues. EU Tariff Code – ACER Feedback No.ACER Request/Issue 1Redefine Transmission Services Definition -Harmonised definition.
Pamela Taylor, Ofgem Gas Target Model, 3 rd stakeholder workshop 11 th April 2011, London Connecting markets.
7 th IG meeting, South Gas Regional Initiative Madrid, 10 th July 2008 Consultation on Requirements for Gas Interconnection Capacity between Spain and.
European Developments: Capacity Transmission Workgroup 6th October 2011.
ERGEG Regional Gas Market North-West Workshop on Interconnections & Primary Capacity Market Interconnection Point Oude Statenzijl H-gas Kick-off Meeting.
Walter Boltz, Vice-President CEER 20 th Madrid Forum September 2011 Gas Target Model State of play.
Markus Krug, Co-Chair CEER Workstream 20 th Madrid Forum 26 September 2011 Harmonised transmission tariff structures Framework Guideline.
1 South Gas Regional Initiative Work Plan Raúl Yunta Huete, South GRI Chairman 20 th Madrid Forum Madrid, 26 September 2011.
XV Madrid Forum, 6 and 7 November 2008 Capacity Allocation and Congestion Management Rules for Storage Mr. Walter Boltz ERGEG’s Gas Focus Group (GFG)
Walter Boltz, Chair of ERGEG Gas Working Group 1 st workshop, Vienna, 3 December 2010 CEER vision for European gas target model.
Investment in Gas Infrastructure A regulator´s view Nina GRALL Seminar on Gas Industry Restructuring in SEE 4/5th October 2005, Belgrade.
EUROPEAN COMMISSION Transparency – Proposal to amend chapter 3 of the Annex of Regulation 1775/2005 EUROPEAN COMMISSION H. Hick, DG TREN C 2 NW GRI 5th.
PROPOSAL CAM PROPOSAL FOR HARMONISATION 14 th SG meeting Madrid 11 th July 2011.
Capacity allocation in natural gas transmission networks Framework Guideline (Pilot) Dr. Stefanie Neveling, ACER Workstream Co-Chair Walter Boltz, ACER.
Walter Boltz, Chairman ERGEG Gas Working Group 19th Madrid Forum 21 March 2011 Monitoring Report Capacity Allocation and Congestion Management.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Energy Infrastructure Package ERGEG preliminary.
XVI th Madrid Forum Madrid, 28 May 2009 Walter Boltz (Gas Working Group Chair) Transparency guidelines and GRI transparency work.
Walter Boltz, ERGEG Vice President 18 th Madrid Forum 28 th September 2010 Capacity allocation in natural gas transmission networks Pilot framework guideline.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Preparatory work for Framework Guideline Tariffs.
Walter Boltz & Asta Sihvonen-Punkka, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Implementing the 3 rd Package Framework.
Walter Boltz, Chairman ERGEG Gas Working Group 18 th Madrid Forum 28 September 2010 Pilot framework guideline on capacity allocation in natural gas transmission.
Framework Guideline on gas balancing Martin Crouch, Ofgem 20th Madrid Forum September 2011.
Madrid, May 21 st th SG Meeting South Gas Regional Initiative Working Group 4B: Open Seasons.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
Capacity Allocation Mechanism Iberian overview 13 th SG meeting Madrid 7 th Feb 2011 DRAFT – Portugal / Spain.
SOUTH SOUTH-EAST GAS REGIONAL INITIATIVE WORK PLAN Francesco Cariello, AEEG 20 th Madrid Forum, September 2011.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
1FTS-CEER bilateral meeting, St Petersburg, 17 May 2011 Peter Plug Chairman of the electricity working group Use and management of interconnections – The.
Gas Regional Initiative Impact of the 3rd package & creation of RIG Benoît Esnault (CRE), GRI TF co-chair NW GRI – RCC and ministerial meeting Paris, 8.
Walter Boltz, Chairman ERGEG Gas Working Group 17 th Madrid Forum 14 January 2010 Capacity allocation and congestion management in natural gas transmission.
Madrid 16 th February 2009 TSOs presentation 8 th IG meeting.
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren 20 th Madrid Forum, 26 Sept 2011.
1 XVI Madrid Forum, 29 May 2009 XVI Madrid Forum Jose Sierra Madrid, 29 May 2009 Chair, RIG ERGEG Gas Regional Initiative Update & Progress.
1 Capacity and Congestion Management Duties of TSOs - Availability of infrastructure and capacities for shippers to fulfil their supply obligations - Guarantee.
Allocation of capacities. 2 Allocation of Capacities Determination of capacities Calculation of pipeline capacities is based on the physical laws governing.
Madrid, 23rd Sep th SG Meeting South Gas Regional Initiative OSP and Interoperability.
Gas Regional Initiative – North West Region Stakeholders Group meeting - London 14 November, 2008 Capacity Workshop Coordinated Open Seasons Marie-Claire.
Gas Regional Initiative South South-East
Congestion Management
Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011
Enagás and REN Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November th SG meeting.
10 year investment plan ERGEG approach and contribution
New transparency guidelines
Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November th SG meeting.
ERGEG Gas Regional Initiative NW 5th Stakeholder Group Meeting
Harmonization of Cross Border Transmission Tariffs between
26th IG meeting 23th January 2014
ETSO Comments on the draft Congestion Management Guidelines
Background and Process
ERGEG GRI South South East – , Maribor
6th Gas Advisory Council Vienna, 29 January Work Program for WS2 Walter Boltz – Andrey Konoplyanik.
Network Code on Capacity Allocation Mechanisms (Reg.984/2013)
Gas balancing – where next
ERGEG Benchmarking report on long term transmission rights
Walter Boltz Chairman, CEER Gas Working Group
EUROPEAN TRANSPARENCY UPDATE
Gas Regional Initiative South South-East
EURELECTRIC transparency requirements
ERGEG comment to KEMA study on Art. 3 and 7
Gas Regional Initiative South South-East
Presentation transcript:

Capacity allocation in natural gas transmission networks Pilot framework guideline - Public consultation results and new content of guidelines - Dr. Stefanie Neveling, Co-Chair ERGEG TF 18th Madrid Forum 28th September 2010

Scope Scope of the framework guideline: Existing capacity (as calculated by TSOs) of IPs between entry-exit zones within the EU Existing contracts to be adopted six month after entry into force the network code Result of consultation: Scope widely supported Clarity demanded concerning application to capacity of new infrastructure and TPA-exempted infrastructure ERGEG’s response: Consistence of processes for determining incremental capacity Application to unsold capacity developed through open seasons Scope of the Framework guideline: existing capacity as calculated by TSOs of IPs between entry-exit zones within the EU Existing contracts to be adopted six month after entry into force the network code Result of Consultation: Scope widely supported clarity demanded concerning application to: existing capacity or also to the capacity brought in by new infrastructure TPA-exempted infrastructure ERGEG’s response: Consistence of processes for determining incremental capacity Unsold Capacity developed through open seasons

Capacity Services Definition of capacity products: Small number of products, various durations (short term - multi-annual) A minimum share of capacity shall be sold as short term products Firm & interruptible standardised products all over Europe Interruptions should take place in a coordinated manner Result of consultation: Responses agree on quotas for products of different durations, but diverge as to the exact percentage (10-25%) and how it should be set Agreement on need for standardised products ERGEG’s response: Clarification that transit shall not be treated differently Obligation to reserve min. 10% of available cap. for short-term prod. Harmonisation of interruptible capacity deleted  implementation problem (calculation of likelihood of interruption) Definition of capacity products: Small number of products of various durations, from short term to multi-annual A minimum share of capacity shall be sold as short term products Firm and interruptible products Products should be the same all over Europe Interruptions should take place in a coordinated manner Result of Consultation: responses agree on quotas for products of different durations, but diverge as to the exact percentage (10-25%) and how it should be set agreement on need for standardised products ERGEG’s response: Clarification that transit shall not be treated differently Obligation to reserve at least 10% of available capacity for short-term products Harmonisation of interruptible capacity deleted  implementation problem (calculation of likelyhood of interruption)

Bundled services Bundled services: Exit & Entry capacity available at every IP shall be integrated to allow for transports via a single allocation & nomination proc. Sunset clause: entire technical cap. shall stepwise be bundled until 5 years after the entry into force of legally binding network codes One contractual IP for several phys. IPs connecting the same zones Results of consultation: 15 respondents explicitly support bundling & hub-to-hub services 16 respondents are opposed to the full bundling of cross-border capacity  Trading at the flange not to be precluded ERGEG’s response: Full bundling of cross-border capacity will positively & significantly contribute to the integration of the EU gas markets Need for a “sunset clause”: otherwise facilitation of cross-border gas flows will take years or even decades Bundled services exit and entry capacity available at every interconnection point shall be integrated in such a way that the transport of gas is provided on the basis of a single allocation procedure and single nomination. Sunset clause: entire technical capacity shall be bundled five years after the entry into force of legally binding network codes One contractual interconnection point out of several physical interconnection points connecting the same entry-exit zones Results of consultation 15 respondents explicitly support the bundling of cross-border capacity and the creation of hub-to-hub services 16 respondents are opposed to the full bundling of cross-border capacity into one single capacity product. They do not want trading at the flange to be precluded ERGEG’s response ERGEG thinks that full bundling of cross-border capacity will positively and significantly contribute to the integration of the European gas markets ERGEG believes that there is a need for a “sunset clause”: Without such a Clause the facilitation of cross-border gas flows will take years or even decades.

Capacity allocation Capacity allocation procedures: Auction as standard allocation methodology Pro-rata as interim step when necessary First come first served is disallowed (but might be an option under restricted preconditions) Priority: having the same CAM on the two sides of IPs Results of consultation: majority prefers auctions as the standard CAM for firm capacity 2 respondents state that auctions are not the most efficient CAM ERGEG’s response: Through auctions, capacity is allocated to shippers who value it most Pro-rata allocation will be allowed in cases when conditions are not met for efficient and fair auctions for longer-term products Capacity allocation procedures If no congestion, capacity is allocated as requested by shippers Auction as standard allocation methodology Pro-rata as interim step when necessary First come first served is disallowed (but might be an option under restricted preconditions) Priority: having the same CAM on the two sides of interconnection points Results of consultation majority of respondents prefer auctions as the standard mechanism to allocate firm capacity In the views of two respondents auctions are not the most efficient means of allocating capacity ERGEG’s response Through auctions, the capacity is allocated to those shippers who value it most pro-rata allocation will be allowed in cases when conditions are not met for efficient and fair auctions for longer-term products

Stakeholder involvement & conclusions Result of consultation: Request for stakeholder involvement / regular consultations on capacity products (adapted to local market conditions, commodity & balancing products) ERGEG’s response: Stakeholder consultations introduced with regard to: Breakdown of capacity services and the percentage of available capacity to be set aside for firm short term services The CAM used at each IP: In case of auction, the design of auction shall also be consulted upon. Result of consultation: capacity breakdown should be adapted to local market conditions capacity products offered to be in line with markets needs, commodity and balancing products regular market consultations on these products required ERGEG’s response: Stakeholder consultations introduced with regard to: Breakdown of capacity services and the percentage of available capacity to be set aside for firm short term services The CAM used at each interconnection point in accordance with 3. In case of auction, the design of auction shall also be consulted on. Conclusions: Results of consultation valued & incorporated in the FG CAM Well-balanced position reached  Requested clarification and sufficient concretion realised