MD Planning Fri – Sat (26. – 27.8.)

Slides:



Advertisements
Similar presentations
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Advertisements

Lot’s of time lost due to cryo problem in IR8. Major impact, therefore review of MD program… Start discussion here, please let us know your input. Will.
:00: Prepared new fill B1: Q X =0.293, Q Y =0.269; lifetime = 25h ✔ B2: Q X =0.297, Q Y =0.267; lifetime = 5h ✗ Strong 50Hz and 100hz lines.
MD Wed – Sat DayTimeMD Wed06:00UPS repair, ATS optics checks w/o beam 12:00Cycle, test ATS optics w/o beam 16: TeV: BPM offset determination for.
Draft MD Planning Thu (3.11.) DayTimeMDMP Thu05:00 Ramp down, cycle 07: GeV: Injection stability and losses – check steering constraints, define.
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
Cryo back at 17:30 Beam back at 19:00 IR2 aperture until ~03:00 Since then no beam from the SPS:  Connector problem on MKD  Connector eroded, needs to.
04h36: Cryo problem in arc 81. Access. 09h14: Injection.  TI8 injection collimator setup.  Testing new sequence.  New version of vacuum application.
Monday 19 th March 07:33 Lost (another) beam in the squeeze, beyond 2 m, B2 hits 1/3 resonance. 08:30 Start (another) ramp  Try to correct coupling and.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
Wednesday 8.9 External crossing angles:
1st LHC MD Period Started
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Day :00-11:30: Optics at 3.5 TeV Optics re-measured with AC-dipole. Excellent reproducibility. Small emittance increase from AC-dipole. Collapsed.
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Summary Friday h38: Ramp down and pre-cycle.
MD Report 24 June 2012 Machine coordinators: Barbara Holzer, Mike Lamont MD Coordinators: Ralph Assmann, Giulia Papotti, Frank Zimmermann MD#2 News & Plan.
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
LHC Status Wed Morning 13-April R. Assmann, B. Holzer et al
Status of LHC Operations
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
LHC Morning Meeting - G. Arduini
Thursday morning – optics correction
Tuesday TOTEM and transverse loss map (1) OK
LHC MD block#3 Ralph Assmann, Giulia Papotti, Frank Zimmermann
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
Summary of Week 13 G. Arduini, B. Holzer
LHC commissioning Week 38
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Mon 22/8 – Tue 23/8 00:07 stable beams #2040. Initial luminosities: 2.1x1033 cm-2s-1 18:00 Programmed dump. End of physics #2040. ~83 pb-1 in ~18 hours.
Wed :40 Lost S78 - QPS controller.
Friday March 4th 08h32: Access for beam dump system.
Week 35 – Technical Stop and Restart
Summary of Week 26 Main aims: G. Arduini, B. Holzer, M. Lamont
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Week 36 Machine coordinators R.Assmann, R.Bailey
Planning at 5 o’clock meeting Friday
Thursday :00: Physics fill from the night shift
Yesterday morning Held 1647 for a while – SPS kicker problem
Friday 16/3 08:30 – 10:15 Access for QPS and EPC (BI in point 4)
Wednesday 09 March …:09:00: beta* measurement (1.5 m) by K-modulation and with AC-dipole excitation. 1/17/2019 LHC 8:30 meeting.
Saturday 7th May Sat – Sun night
Friday 23rd March 08:00 Access
Summary Thursday h21: Stable beams fill #1303.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Aims for the week Recover from technical stop and precycle at 10A/s
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
MD Planning Fri – Sat (1. – 2.7.)
Summary for LPC (March 7th, Ralph Assmann)
Saturday :42 stable beams fill 3541
Polarity inversion 07:00 ALICE solenoid and dipole polarity switched to positive External Crossing angle polarity unchanged at injection/ramp & squeeze.
LHC Morning Meeting - G. Arduini
Friday 28 October 2011.
LHC status - Week 35 G. Arduini, M. Lamont Main aims:
Wednesday 23/2 Thanks CRYO!!!.
Fri :52 Stable beams fill #2536
Wednesday h18: 228b fill lost just before start of ramp.
LHC Morning Meeting - G. Arduini
Another Immortal Fill….
Thursday Morning/Afternoon
Tuesday 6th April 8:00 Injection studies 16:00 RF studies
15/12/2009 Vacuum interlock in sector 78 understood  out-gassing of a Penning gauge ignited as a result of ionization or dust arcing In conclusion: NO.
Tuesday
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

MD Planning Fri – Sat (26. – 27.8.) Day Time MD MP 23:00 Ramp down, cycle. Fri 01:00 450 GeV: Transverse damper – beam blowup at injection B/C 07:00 450 GeV  3.5 TeV: Aperture – scraping pilot beam tails in triplets, maybe test global aperture measurement with transverse damper B 15:00 17:00 450 GeV: 25 ns studies – injection of up to 144b/288b, damper Sat 00:00 450 GeV: 25 ns studies – vacuum, ecloud, RF 450 GeV  3.5 TeV: Optics setup for b*=1m (2)– apply proposed beating and local coupling corrections; at 1m: measure beating and coupling, verify corrections, test collision beam process A 16/08/2011 MD Planning 2011/12, MD#3

Summary of MD transverse blow-up using transverse damper Blow-up using band limited and white noise was prepared for beam 2. Initial tests on pilot bunches (max two pilots) spaced 2 us adjusted delays, gating etc. Demonstrated selectivity (one bunch left untouched, one blown-up) largest emittance observed was about 18-20 um, then too small intensity for clean wirescanner measurement, but profile seemed to not increase beyond this; to be checked with collimator settings, but at first sight seems compatible with 5.7 sigma.

Summary of MD transverse blow-up using transverse damper Used filling scheme with 2 batches of 6 bunches spaced at the nominal distance of 925 ns adjust excitation to middle of gap, then demonstrated that we can move controlled into first batch of 6 bunches; both planes checked plus loss maps done (moderate speed). It was demonstrated that it is possible to perform controlled loss maps with high intensity beam above safe limit. Moved to single bunch; compared traditional loss map and damper loss map on single bunch, damper loss map with feedback on off. Achieved similar losses as with traditional loss maps, amplitude nicely controllable. Loss maps by the two methods show in the details some features that differ, to be analysed by collimation team.

Blowup with Transverse Damper (W. Hoefle, D. Valuch et al)

Loss Map with Transverse Damper

MD IR Aperture (S. Redaelli et al) measurements at 3.5 TeV (squeezed beams to 1.5m) started after about 1h due to a problem with a collimator in IP7 for B1. This time was given to the previous MDers, who were working on the other beam. Real measurements at top energy, with squeezed and separated beams, could start at about 9h30. The measurements were aimed at measuring with the beam, the retraction between TCTs and triplets in IP1 and IP5, both in crossing and separation planes. We increased appropriate crossing bumps in both planes of each IP to explore the aperture in the expected limiting locations. We started from nominal separation (+/-0.7mm) and crossing (+/-120urad).

MD IR Aperture The aperture was approached with bumps, keeping the TCT at settings that exposed the triplet by 0.5 sigmas at most. The first scan took about 2 hours. Then we got more confident on the procedure and could finish measurements in the separation and crossing planes of both IP1 and IP5. We found a good aperture in both planes and IPs. So good that we want to take more time to see if we overlooked something. Had to open the TCT aperture to the following values before seeing primary losses at the triplet: IR1 - V -> 18.3 - 18.8 sigmas IR1 - H -> 19.8 - 20.3 sigmas IR5 - V -> >= 20.3 sigmas (corrector limit reached) IR5 - H -> 19.8 - 20.3 sigmas

MD IR Aperture If preliminary estimates are confirmed possibility to squeeze further than 1 m at 3.5 TeV or to run at 1.0 m without going to tight settings or reducing the crossing. As we had 30 min left, we squeeze to 1 m keeping the 120 urad crossing in IP1/5 and keeping the presently operational settings for collimators (relaxed). At beta*=1m, the TCTs in IP1 and IP5 were set to 11.8 sigmas for the new optics, keeping the same centre as at 1.5 m (negligible difference of orbit with respect to 1.5 m). We made loss maps in the vertical planes for both beams to preliminary address the triplet protection with these settings. Note that in parallel, we did measurements of the tune and coupling induced by the non linear errors in the triplet magnets. Tune and coupling shifts were indeed observed. More detailed analysis is required.

17h25 - Interruption from thunderstorms: 25 ns (part I) Start 16h20. 17h25 - Interruption from thunderstorms: 7 sectors tripped ventilation door at UL44 opened => access some mini-quenches seen by the cryo ( on Q9+ Q10.R2, Q9L4, Q9.R4 Q10.L5 Q9+Q10.R5, Q9+Q10.L6, Q9.R6, Q9-Q10.L8) but no loss of cryo start 19h03: Again ventilation door in UL44 opens by itself... interlock for this door seems to be in the SIS, so we mask until the door is fixed.

25 ns (part I) 20h16: MD continuing, beam back Injection of up to 48b, some apparent instability leads to loss of beam after 517 turns 22h59: electrical perturbation on 3.3kV line caused a trip of the whole cryo plant at pt 2 .... first estimate for recovery: 20+ hrs

MD Planning Fri – Sat (26. – 27.8.) Day Time MD MP Sat 07:00 450 GeV  3.5 TeV: Optics setup for b*=1m (2)– apply proposed beating and local coupling corrections; at 1m: measure beating and coupling, verify corrections, test collision beam process A 15:00 Ramp down, cycle. 17:00 450 GeV  3.5 TeV: Collimator setup for b*=1m– tight collimation settings, set up TCT’s in IR, loss maps. Asynchronous dump, if time left. B Sun 01:00 03:00 450 GeV  3.5 TeV: p-p rephasing – debunching during ring rephasing with nominal emittances 09:00 11:00 450 GeV: UFO studies – generation mechanism at MKI’s, statistics, MKQA tests (p-Pb interlock test in the shadow) C To be revisited 16/08/2011 MD Planning 2011/12, MD#3

MD Planning Sun – Mon (28. – 29.8.) Day Time MD MP Sun 19:00 450 GeV: Quench margin at injection – observation with special QPS instrumentation, losses from TCLIB collimator C 22:00 450 GeV  3.5 TeV: Quench test at 3.5 TeV – test losses in other dispersion-suppressors – dropped if extra time needed for b*=1m Mon 06:00 Technical Stop To be revisited Needs from experiments: -Luminometers on during beam-beam MDs and in the second slot of b*=1 m 16/08/2011 MD Planning 2011/12, MD#3