PH Department News Discussion with management

Slides:



Advertisements
Similar presentations
PH Dept News Fellows and associate committee Dec 2011: 12 fellow candidates for ISOLDE (on par with LHC experiments) 2 new fellows hired – Susanne Kreim.
Advertisements

EURISOL Transition period MYRRHA and
Fermilab E906 Schedule Paul E. Reimer 20 June 2008.
ISOL-SRS project.
Stable beams Radioactive beams Cluster beams 15 MV Tandem : beams from p to gold Cluster beams : C60 CnHm Au MeV electron Linac (10 µA) fission.
COST Action MP1307 Stable Next Generation Photovoltaics: Unraveling Degradation Mechanisms of Organic Solar Cells by Complementary Characterization Techniques.
Space for Nicole Maria J. G. Borge & Magdalena Kowalska.
HIE-ISOLDE Design Study and the CATHI Project Richard Catherall EN-STI ISOLDE Technical Coordinator HIE-EBIS Workshop 16 th -17 th October CERN.
ISOLDE: the Anglo-Saxon Era Peter Butler* + Vikings, Visigoths, Celts, etc. *University of Liverpool.
EURISOL – Distributed Facility (DF) Y. Blumenfeld, M. Lewitowicz, P. Van Duppen, A. Maj Background : EURISOL RTD : EURISOL Design Study.
STSM s Short Term Scientific Missions Report, Trieste Meeting Sep.12.
CERN NuPAC meeting Dec 2005 The future of ISOLDE: accelerated radioactive beams Peter Butler 1.HIE-ISOLDE 2.EURISOL.
Mats Lindroos INTC Agenda 09:00 Introduction by the Chairman, J. Äystö 09:05 Report by the ISOLDE Technical Coordinator, M. Lindroos 09:25 Report by the.
PH Dept News Long shutdown 1: Baseline Project Project Leader Freddy Bordry Injector shutdown Dec 2012-Mar 2014 means 1 year stop for ISOLDE Physics LS2.
CRYOMODULES High Beta Low Beta Approved by CERN Research Board in December 2009.
ISOLDE: Status report building th ISCC meeting CERN, 22 October 2013 Maria Borge, Erwin Siesling.
1 Status of the EU-FP7 funded Integrating Activity “European Nuclear Science and Applications Research” (ENSAR) Marek Lewitowicz (GANIL) on behalf of Muhsin.
Physics coordinator report: Shifts 2014 Schedule 2015 Access, safety and courses b508 and 275 Magdalena Kowalska.
ITWG Topical Workshop Management of Instrumentation Projects 19 to 21 May 2014 Rolf Lindner.
ISOLDE Activities for LS2 Richard Catherall EN-STI ISOLDE Technical Coordinator.
PH Dept and Section News New Organization Group budget Technician Fellows, associates and students Workshop on non LHC Physics (11-13 May) Isolde Workshop.
Status and Plans for EUROnu FP7 Design Study Status and Plans for EUROnu FP7 Design Study EUROnu = A High Intensity Neutrino Oscillation Facility in Europe.
ISOLDE Physics Report Magdalena Kowalska. Injector schedule since last meeting 2 September: confirmation of 2 more weeks with protons – until December.
Maria J. G. Borge Beam Lines for HIE-ISOLDE. Status of HIE-ISOLDE 2 May 2010: 34 LoI submitted 1 Nov 2012: INTC endorsed the increase of 2 GeV-proton.
ENSAR : European Nuclear Structure and Application Research Maria J. G. Borge.
ISOLDE PH report Schedule 2012 Physics results 2012 Experiments, users New template Safety Long shutdown PH and ENSAR news Magdalena Kowalska Yorick Blumenfeld.
Floor plans, Infrastructure & Logistics Hie-Isolde Spectrometer Workshop Physics Department, Lund University 10 March, 2011 Hie-Isolde Erwin Siesling.
Plans and schedule for the Long Shutdown LS1 SGUI CERN, 2 February 2012 Hie-Isolde Erwin Siesling.
BROOKHAVEN SCIENCE ASSOCIATES NSLS-II - New opportunities for high pressure research - Lars Ehm National Synchrotron Light Source Brookhaven National Laboratory.
Maria J. G. Borge 10th November 2015 News of the Group Courtesy of M. Huyse on behalf of IS557.
Riccardo Raabe (IKS, KU Leuven) for the Collaboration INTC 01/02/2012 INTC-O-014 Storage ring facility at HIE-ISOLDE: Technical Design Report.
Experiments, Schedule & Access to the hall. Magdalena Kowalska.
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe Introduction Aims Structure Tasks Link to other activities Future dates.
Physics coordinator report 2015 overview 2016 schedule Safety & access B. 508 & 275 Karl Johnston.
Summary of LOIs to INTC (24 June 2010). Call for Letters of Intent (deadline May 21) 34 Letters submitted 284 Participants from 76 Laboratories in 22.
Status of the Solenoid Status of procurement Plans for transport Storage and tests on arrival at CERN Installation in the ISOLDE Hall Location Footprint.
A HIE-ISOLDE spectrometer for nuclear reaction studies G. Tveten 1, J. Cederkall 2, S. Siem 1, A. Goergen 1, M. Guttormsen 1, P. Hoff 1, D. Di Julio 2,
DF ALTO IN2P3 DF ISOLDE CERN SPES INFN SPIRAL2 GANIL MYRRHA SCK-CEN … COPIN EURISOL – Distributed Facility (DF) Initiative H. Savajols – Convenor.
Summary: Physics Opportunities for ISOLDE and n_TOF Peter Butler.
October, 2001 Hybrid Spectrometer for Single Crystal Studies at the Pulsed SNS: an update. n Principal features of the proposed hybrid spectrometer. n.
News of the Group Maria J. G. Borge 30th June 2015.
Collaboration Matters & MOU 28 th of June 2016 Maria J. G. Borge.
Discussions on preparations for future (joint) research projects
GlueX Collaboration Meeting
Workshop, 10/2012 “The Project”
for the EURISOL Steering Committee
Thorsten Kröll* / Gary Simpson+
L. Acosta1, M. A. G. Álvarez2, M. V. Andrés2, C. Angulo3, M. J. G
Status of Solenoidal Spectrometer
ISOLDE PH report Schedule 2012 Physics results 2012 Experiments, users
Magdalena Kowalska, CERN PH-SME-IS
A. Herlert, CERN PH-SME-IS
PH Dept News Long shutdown 1: Baseline Project
Summer Institute Session Team Leaders Check-In
Fixed Decay Station at ISOLDE
Making it up as we go along: two years post re-organization
PH Dept (and other) news
Present and Future test facilities for High-intensity Targetry CERN
April May April May June July July June August Sept August
PH Department News New Doctoral Student: Kara Lynch (U.K. – Kieran)
66th ISOLDE Collaboration Committee meeting
Coordinator’s report . Magdalena Kowalska.
"Financing Natura 2000 Guidance and Workshops”
Thomas Nilsson, CERN EP/IS
INTC matters . Magdalena Kowalska.
Beam Transfer Line Stage 1:
The HIE-ISOLDE Design Study and the CATHI Fellow Participation
EPIC UK funding situation
Richard Catherall EN-STI-RBS
Presentation transcript:

PH Department News Discussion with management Shutdown in 2012 or 2013: decision taken June 2011 Duration: 15 to 18 months Possibility to run 3-4 months off-line after stop if requested at “ right psychological moment” When the shutdown dates are decided Richard will prepare a manpower/resource plan for 4 months offline running. Magda/Yorick will re-contact the users for more precise offline beam requests. Booster upgrade 2016? Bldg 275

PH Dept News II New Coordinator started in October New Fellow Thomas Cocolios started in July New Student Kara Lynch started in Sept. Jenny will continue as ISOLDE secretary under a Norwegian contract starting April 1st funded ½ by Ph and ½ by the collaboration (Thanks to Sunniva!)

TNA 6 CERN/ISOLDE Selection committee in place Yorick Blumenfeld (CERN) Maria J G Borge (Madrid) Peter Butler (Liverpool) Karl Johnston (Saarbrucken/CERN; solid state physics) Magdalena Kowalska (CERN) Karsten Riisager (Aarhus) First call beginning of August First decision by committee August 31 First payment : Sept. 1 As of Oct. 22: 33 physicists from 10 experiments supported for a total of 25 000 Euros. Workshop and User’s meeting: Dec 8-10, 2010. Plans to hire technician (50% Julien Thiboud) and post-doc for 2 years. Other WP: EURISOL-NET; ACTILAB; PREMASS

MOU Issues Welcome to Greece and Ireland Korea close to signing South Africa Israel?? Portugal – nothing MOU signed: LNL, Calcutta, Korea, GANIL.

Call for Letters of Intent (deadline May 21) 34 Letters submitted 284 Participants from 76 Laboratories in 22 Countries 30 LOIs make use of the Energy and Intensity increases; 4 of the intensity upgrade only Major mechanisms are Coulex (13) and transfer(16); elastic scattering(3); fission(2) (3) letters concern masses and moments; (4) astrophysics and (5) major new instrumentation Major subjects: Nuclear shapes ; Shell evolution; Halo properties; Nuclear astrophysics

LOI participants by Country

LOI Spokespersons by Country

HIE ISOLDE Physics Group I • The spectrometer is important – There should be a working group set up and space reserved (J. Cederkall will be asked to organize a meeting/workshop for groups interested in the project) • Timing properties are crucial for many experiments: neutrons, PARIS, GASPARD, Helios require time resolution better than 1 ns on target, Buncher/chopper seems necessary (to obtain 100 ns bunch period). • Beam spot size should be smaller than 3mm and better. • HELIOS and neutron detection require space. • Energy resolution and precision were never mentioned. • The question of a storage ring is not yet clear. The workshop organized in Heidelberg at the end of October should provide more information.

HIE ISOLDE Physics Group HIE-ISOLDE beam features missing at present (but required by experiments): Time structure (timing): bunching and debunching + chopper 1 mm diameter for HELIOS (but 3 mm might also work) 100 ns microbunch structure would be beneficial Agreement of the layout (which needs to be fixed by June 2011): In 2014 there will be 2 short beamlines (for Miniball and a second detector) and a third, U-shape beamline will be most probably added when the funds are available (to decide on this, one should compare it with the cost of moving Miniball from the first beamline to the final position at the U-shape beamline) A working group on the spectrometer should be set up (get back to the people who submitted HIE-LOIs and involve Jyvaskyla who has built such a device, check interest in building this device) The community should be stimulated to obtain the remaining funds for the different packages HIE-ISOLDE will require 2 DAQ rooms (and a viewing area) Yorick will ask for a fellow (funded partly by ENSAR) to work on the DAQ system and time-stamp issues Follow-up: TSR storage ring workshop in Heidelberg