TGaz Next Generation Positioning Mar Closing Report

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0358r0 Submission March 2013 Osama Aboul-Magd (Huawei Technologies)Slide 1 TGac March 2013 Closing Report Date: Authors:
Advertisements

Doc.: IEEE /1226r0 Submission September 2013 Osama Aboul-Magd (Huawei Technologies)Slide 1 TGac September 2013 Closing Report Date:
Doc.: IEEE /0699r0 Submission May 2015 Jonathan Segev (Intel Corporation)Slide 1 NGP SG May 2015 Closing Report Date: Authors:
March 2015doc.: IEEE /0471r0 SubmissionDonald Eastlake, Huawei TechnologiesSlide 1 TGak March Closing Report Date: Authors:
Doc.: IEEE /1514r0 Submission November 2014 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG November 2014 Closing Report Date: Authors:
Doc.: IEEE /0707r0 Submission May 2011 Minyoung Park, Intel Corp.Slide 1 Overview on TGah Specification Framework Development Date:
July 2015doc.: IEEE /0954r0 SubmissionDonald Eastlake, Huawei TechnologiesSlide 1 TGak July Closing Report Date: Authors:
November 2015doc.: IEEE /1451r0 SubmissionDonald Eastlake, Huawei TechnologiesSlide 1 TGak November Closing Report Date: Authors:
Doc.: IEEE /1583r1 Submission November 2011 Osama Aboul-Magd (Huawei Technologies)Slide 1 TGac November 2011 Closing Report Date: Authors:
A Proposed Timeline for IEEE ba TG
Comments on WUR SG PAR and CSD
TGaz Next Generation Positioning March Meeting Agenda
FRD Requirements for Scalable Location
IEEE aj January 2016 Closing Report
NGP TGaz Nov. Agenda Date: Authors: Nov. 2015
Jan 2013 Motions Date: Authors: Jan 2013 May 2006
TGaz Next Generation Positioning May Meeting Agenda
TGaz Next Generation Positioning July Meeting Agenda
TGax March 2017 Closing Report
NG60 SG March 2015 Agenda Date: Authors: March 2015
TGac Documents and Timeline
Mature Topics for Draft 0.1
April 2007 doc.: IEEE /0570r0 July 2010 Response to ITU-R Liaison to IEEE on “Multiple Gigabit Wireless Systems in frequencies around 60 GHz”
TGs Atlanta Closing Report
April 2007 doc.: IEEE /0570r0 July 2010 Response to ITU-R Liaison to IEEE on “Multiple Gigabit Wireless Systems in frequencies around 60 GHz”
January 2018 doc.: IEEE July 2018 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
Suggested Practice for SFD and Draft Spec Text Proposal
Draft P802.11s D1.07 Word Conversion
TGae Closing Report – January 2010
TGae Closing Report – March 2010
TGae Closing Report – May 2010
TGac Status and Timeline
TGad July 2010 Editor Report
September 2008 doc.: IEEE /1003r0 May 2010
September 2008 doc.: IEEE /1003r0 March 2009
Tgae Closing Report – November 2009
Functional requirements for az
QoSMAN SG Closing Report – Nov 2009
September 2008 doc.: IEEE /1003r0 May 2011
TGs Process, July Date: Author: July 2009 July 2009
Straw polls and Motions on Spec text for and
TGs Process, September Date: Author: September 2009
TGba January 2018 Closing Report
TGae Closing Report – July 2010
Nov 2011 Closing Plenary Motions
S1G Closing Report – May 2010 Date: Authors: May 2010
TGm Closing Report – May 2010
2019 March TGba Closing Report
TGba November 2017 Closing Report
TGba September 2017 Closing Report
TGs Process, March Date: Author: March 2009 March 2009
Task Group AY September 2017 Closing Report
Straw polls and Motions on Spec text for and
TGae Closing Report – July 2011
TGae Closing Report – January 2011
Task Group AY May 2016 Closing Report
TGax September 2017 Closing Report
Motion for EC Approval to forward the draft to Revcom
May 2015 doc.: IEEE /0496r1 July 2017 IEEE TG13 Multi-Gbit/s Optical Wireless Communication September 2017 Closing Plenary report Date:
May 2015 doc.: IEEE /0496r1 November 2017
IEEE aj March Closing Report
TGae Closing Report – November 2011
Snapshot Slide for TGbc
IEEE aj May Closing Report
TGaz Next Generation Positioning Jan Closing Report
TGak January Closing Report
TGax November 2017 Closing Report
TGae Closing Report – September 2010
TGbd Closing Report – Vietnam
TGaj editor report for Sponsor Ballot
Presentation transcript:

TGaz Next Generation Positioning Mar. 2016 Closing Report November 2011 doc.: IEEE 802.11-11/0xxxr0 Mar. 2016 TGaz Next Generation Positioning Mar. 2016 Closing Report Date: 2016-03-17 Authors: Jonathan Segev (Intel Corporation) Osama Aboul-Magd (Samsung)

November 2011 doc.: IEEE 802.11-11/0xxxr0 Mar. 2016 Abstract This document is the Next Generation Positioning TGaz closing report for the Macau meeting, Mar. 2016. Jonathan Segev (Intel Corporation) Osama Aboul-Magd (Samsung)

July 2015 Mar. 2016 Work Completed Reviewed and approved a working draft Functional Requirement Doc. (FRD). Reviewed and approved the Spec. Frame work document template. Approved a 1st batch for scalability FR. Approved a 2nd batch of 60Ghz FR. Approved additional 3 use cases followed by a document freeze. Agenda: See 11-15/218r5. Jonathan Segev, Intel Corporation Donald Eastlake, Huawei Technologies

July 2015 Mar. 2016 Goals for May meeting Continue on Functional Requirement Document development. Approve initial submissions of technical material towards SFD text where FRD is sufficiently mature. Review technical submissions on channel models, proposed technical approaches etc. Call for submission for the FRD and SFD to be issued post this meeting. Jonathan Segev, Intel Corporation Donald Eastlake, Huawei Technologies

Teleconference Schedule July 2015 Mar. 2016 Teleconference Schedule May 4th 10:00AM ET for 1hr. Jonathan Segev, Intel Corporation Donald Eastlake, Huawei Technologies