Municipal Separate Storm Sewer System (MS4) Permit

Slides:



Advertisements
Similar presentations
SW101 Municipal Separate Storm Sewer Systems (MS4s)
Advertisements

When It Rains, It Drains An Overview of Our Community’s New Storm Water Management Program.
Stuck in the SWMP Storm Water Management Programs: New challenges for the Transportation Community.
Implementing Committee Meeting May 15 th, 2014 New Braunfels MS4 program and the HCP 1.
MS4 Stormwater Permit Program and Great Bay. Brief Overview – EPA’s Stormwater Management Program Clean Water Act – NPDES Stormwater amendments.
Legislative Changes Affecting Water Quality at a Local Level October 2011 Robert Kollinger, P.E. Water Resources Manager Polk County Parks and Natural.
Utah Pollutant Discharge Elimination System (UPDES) Utah Sewer Management Program (USMP)
RIPDES Storm Water Program: Municipal Separate Storm Sewer Systems (MS4s)
Upper Providence Township Stormwater Management MS4 Program.
When It Rains, It Drains An Overview of Our Community’s New Storm Water Management Program.
Environmental Harm Urban stormwater frequently contains litter, oil, chemicals, toxic metals, bacteria, and excess nutrients, like nitrogen and phosphorous.
Austin Peay State University Stormwater Program Kristen Spicer, Ph.D.
When It Rains, It Drains An Overview of the Hempfield Township’s New Storm Water Management Program.
Upper Merion Township’s New Storm Water Management Program
When It Rains, It Drains An Overview: The Lower Providence Township Storm Water Management Program.
Ferguson Township Municipal Separate Storm Sewer System (MS4) Stormwater Management Program (Our MS4 Story) April 6, 2015 Board of Supervisors Meeting.
Arkansas Storm Water Program Arkansas Update On Construction, Industrial & Small MS4.
{Your District Name Here} District Small MS4/Municipal Storm Water Update {Date Here}
SLIDE 1 Sustainable Stormwater Management May 6, 2015 Blue Highways: Transportation and Stormwater Management in Virginia Ginny Snead, PE Richmond Office.
MUNICIPAL STORMWATER PERMITS Water Quality Partnership May 19, 2005.
Tracie Belongia CMS4S, Hancock County. Surveyor’s Office Health Department County Highway GIS SWMD SWCD.
NYS Department of Environmental Conservation DRAFT SPDES General Permit for Stormwater Discharges from Separate Storm Sewer Systems (MS4s) (GP )
Municipal St rm Water Program. Storm Water Programs Industrial –bus maintenance yards Construction –addition of a gym Municipal.
A Review of the Hollis Stormwater Management Ordinance Todd H. Dresser, CHMM Cuoco & Cormier Engineering Associates.
January 6,  INTRODUCTION  BACKGROUND  SUMMARY  QUESTIONS  SUPPLEMENTAL INFORMATION ◦ PROPOSED BUDGETS, LEVIES AND CIRCUIT BREAKER 2.
YOUR SCHOOL AND YOUR WATERSHED LORNA ROSENBERG- US EPA MID-ATLANTIC OCT 1-2, 2014 CHESAPEAKE BAY SCHOOLS WORKSHOP – SHEPHERDSTOWN, WVA.
1 Stormwater Phase II Municipal Separate Storm Sewer Systems and Act 167 Doug Brennan PA DEP September, 2002.
Integrity ♦ Innovation ♦ Accountability ♦ Commitment to Excellence ♦ Teamwork City of Southlake Storm Water Management Plan Christi Upton
WOOLPERT Managing NPDES Phase II Requirements on a County-Wide Basis Jared Livingston.
REGULATORY REQUIREMENTS FOR STORMWATER MANAGEMENT Coastal Stormwater Supplement Training.
Introduction to MS4 Stormwater Requirements (2009)
Local Government Assistance Phase II Storm Water Rule Erie County Department of Environment & Planning.
Storm Water: Federal Enforcement and Compliance for Phase II MS4.
Overview of Montana’s Stormwater Regulatory Program.
Construction & Post-Construction Stormwater Ordinance City of Wenatchee, Public Works Department Jessica Shaw, Environmental Manager.
Workshop on the draft General Permit for Discharges of Storm Water from Small MS4s Fresno August 6, 2002 Redding August 8, 2002 San Luis Obispo August.
Urban Programs. Urban Programs - ESC Virginia Erosion and Sediment Control (ESC) Law –Approved in –Title 10 of the Code of Virginia. “Each District.
MS4 Permit Updates May 9, 2014 Jay Hoskins, P.E. Metropolitan St. Louis Sewer District.
10/03/021 Stormwater Video-conference Department of Environmental Protection Stormwater Videoconference October 3, 2002.
Phase II National Storm Water Regulations What’s in it for you?
An Overview of our Community’s Stormwater Management Program
1 Module 1: Refresh Your Perspective on the Storm Drain System Stormwater System Maintenance: A 4-Part Workshop Series.
 The Illinois Environmental Protection Act is silent with regard to storm water.  Illinois EPA’s authority to deal with storm water derives from delegated.
Program Overview Town of Wrightsville Beach Public Works Department Stormwater Services.
1. Wolfeboro’s Tool Kit Implemented tools for water quality protection Municipal Watershed District Ground Water Protection Overlay District Steep Slope.
Williamsburg’s Local Strategies to meet the ChesBay TMDL March 2012 Chesapeake Bay Watershed Virginia Maryland Pennsylvania New York Delaware West Virginia.
North Hennepin Community College MS4 Plan October 24, 2014.
Fred Noble, P.E. State NPDES Administrator Florida Department of Transportation NPDES MS4 Permit Overview 2016 Maintenance Conference.
Why the Need for Increased Stormwater Funding? Citizens expect a higher level of protection from flooding Increased development.
MS4 and Trading Considerations
MS4 & Construction Storm Water Permits
Stormwater Management and MS4 Compliance
Ohio Department of Transportation
2017 MS4 Educational Workshop Series
MS4 On-site evaluations & common findings
Taking Advantage of a Stormwater Program Partnership Opportunity
STORMWATER MANAGEMENT
Local, Regional, State, and Multistate Water Management Agencies
Town of Melbourne Beach
Summit County MS4.
Sacramento County Stormwater Quality Program
City of Forest Lake MS4 Program
Stormwater Management Program
John Tinger U.S. EPA Region IX
CLEAN WATER ACT (1972) EPA DESIGNATED TO ASSURE COMPLIANCE WITH THE ACT NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) MS4 GENERAL PERMIT ADMINISTERED.
MS4 OVERVIEW 2015.
MS4 = Municipal Separated Storm Sewer System
Illicit Discharge Detection & Elimination (IDDE) Plan
Sacramento County Stormwater Quality Program
Rule 5/6/13 Conversion to General Permits
Presentation transcript:

Municipal Separate Storm Sewer System (MS4) Permit August 2017

Federal Regulation EPA NPDES Phase II Stormwater Program (1999) PERMIT BACKGROUND Federal Regulation EPA NPDES Phase II Stormwater Program (1999) State Regulation  PA DEP MS4 Stormwater Permit (2003) Overall Requirements Implement a stormwater management program Track progress toward measureable goals Annual reports on progress A F u l l – S e r v i c e E n g i n e e r i n g F i r m

WHAT IS MS4? An MS4 is a conveyance or system of conveyances that is: Owned by a state, city, town, village, or other public entity that discharges stormwater runoff to waters of the Commonwealth; Designed or used to collect or convey stormwater (including storm drains, pipes, ditches, etc.); Not a combined sewer; and Not part of a sewage treatment plant. MS4 is comprised of numerous stormwater conveyances that drain into receiving waters A F u l l – S e r v i c e E n g i n e e r i n g F i r m

MINIMUM CONTROL MEASURES (MCM) 1. Public Education 2. Public Involvement 3. Illicit Discharge, Detection, and Elimination (IDD&E) 4. Construction Site Runoff Control 5. Post Construction Stormwater Management (PCSM) 6. Pollution Prevention & Good Housekeeping A F u l l – S e r v i c e E n g i n e e r i n g F i r m

PA DEP Inspection Completed June 7, 2017 MS4 AUDITS PA DEP Inspection Completed June 7, 2017 Mandatory inspection all MS4s before new permit cycle (2018) EPA Audit Random audits across the state A F u l l – S e r v i c e E n g i n e e r i n g F i r m

2018 Permit Existing Permit Expires on March 15, 2018 Municipalities must submit a Notice of Intent (NOI) on September 16, 2017 NOI includes Application/Final Progress Report Permit Fee Comprehensive Map Pollutant Reduction Plan, if applicable Memorandum of Understanding Stormwater Management Ordinance Additional Permit Requirements for each MCM Waiver on TMDL for Saw Mill Run Waiver request for Pollutant Reduction Plan A F u l l – S e r v i c e E n g i n e e r i n g F i r m

APPENDIX E – POLLUTANT REDUCTION PLAN(PRP) 2018 Permit (Cont.) APPENDIX E – POLLUTANT REDUCTION PLAN(PRP) MS4 permittees with at least one stormwater discharge to surface waters considered impaired for nutrients (nitrogen and phosphorus) and/or sediment PRP Must be submitted with the NOI Must publish a public notice in a newspaper concerning the plan Must be published with public comment period 45 days prior to the deadline for submission of the plan to DEP A F u l l – S e r v i c e E n g i n e e r i n g F i r m

RED =Impaired Stream 2018 Permit (Cont.) BEN AVON RECEIVING STREAMS A F u l l – S e r v i c e E n g i n e e r i n g F i r m

2018 Permit (Cont.) Permittee shall achieve Pollutant Load Reductions (lbs/year) proposed in its PRP within 5 years Minimum percent reduction for pollutant loadings is 10% for sediment and 5% for nutrients The permittee shall submit a report demonstrating implementation of the PRP that is due following completion of the 5th year A F u l l – S e r v i c e E n g i n e e r i n g F i r m

2018 Permit (Cont.) In order to prepare the PRP each Municipality must determine the following: Map/Delineate storm sewersheds draining to MS4-regulated outfalls to impaired surface waters The existing pervious/impervious ratio The total existing pollutant loads Review existing BMPs to determine their load reductions Total pollutant load = Total existing load – BMP reductions Propose BMPs to remove 10% of the Total Pollutant Loads Identify Funding Sources for each Plan for project implementation during 5 year permit cycle (by 2023) A F u l l – S e r v i c e E n g i n e e r i n g F i r m