Cryogenics storage and distribution

Slides:



Advertisements
Similar presentations
Cryogenic system in P4: Possible options S. Claudet & U. Wagner LHC Workshop, “Chamonix XlV” January 2005 (Mostly for RF & beam scrubbing)
Advertisements

Going towards LHC Run2 CRYOGENICS 5 th Evian Workshop 2-4 June 2014 SESSION 4 - Systems 2 - Status and commissioning plans (HW perspective) Krzysztof Brodzinski.
Status of the LHC Project L.Evans - C.Wyss Riunione CSN1 INFN Napoli, 21 Settembre 2005.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Large-capacity Helium refrigeration : from state-of-the-art towards FCC reference solutions Francois Millet – March 2015.
Cryogenic cavern in Asian site Conceptual design of the cryogenic system Layout of the cryogenic plant for site A & B New layout of the cryogenic system.
CRYOGENICS AND POWERING
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Conceptual Design Study - Cryogenic Requirements How to decide the layout of ILC cryogenic system Conceptual design of cryogenic system Layout of cryogenic.
Workshop on cryogenic and vacuum sectorisations of the SPL CERN, 9 th -10 th November 2009 Workshop Organisation and Goals Vittorio Parma TE-MSC.
Workshop Chamonix XIV Shortcuts during installation and commissioning: risk and benefit H. Gruehagen, G. Riddone on behalf of the AT/ACR group 18 January.
Cryogenics in SPS & LHC (2 K / 4.5 K) LHC-CC11, 14 November 2011 L. Tavian, CERN, TE-CRG With the contribution of N. Delruelle, G. Ferlin & B. Vullierme.
Cryogenic update before Fermilab meeting (and after the helium tank review) Coordination meeting 6 th May 2015 K. Brodzinski HiLumi-LHC-CC-Cryo-PPT-18_v1.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
S. Claudet - 31st May 2007Power refrigeration for LHC Power refrigeration at 4.5K & 1.8K for the LHC S. Claudet, CERN AT-ACR.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
New plans for high power RF tests places at CERN O. Brunner BE/RF/KS – January ‘10.
Cryogenics for crab cavities – SPS/LHC 2 nd HiLumi LHC meeting – Frascati (Italy) 15 November 2012 K. Brodzinski and L. Tavian on behalf of cryogenic team.
Heat loads and cryogenics L.Tavian, D. Delikaris CERN, Cryogenics Group, Technology Department Accelerators & Technology Sector Friday, October 15, 20101HE-LHC'10.
Superconducting Technologies for the Next Generation of Accelerators CERN, Globe of Science and Innovation 4-5 December Superconducting Links for the Hi-Lumi.
SM18 cryogenics infrastructure upgrade L. Serio TE-CRG.
Survey Meeting John Osborne, CERN 8 February 2016
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
TE-CRG Activities D. Delikaris, TE-CRG.
Crab cavities – cryogenics for SPS and LHC LHC-CC13, 6 th LHC Crab Cavity Workshop – CERN, Geneva, Switzerland 9-11 December 2013 K. Brodzinski on behalf.
NML - RF Unit Test Facility Jerry Leibfritz Fermilab.
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
LCLS-II Cryoplant Overview
HIE ISOLDE commissioning of the cryogenic control system installation at CERN. LNL-INFN 22/07/2015 Dr. Marco Pezzetti (CERN )
COOLING & VENTILATION PLANTS M. Nonis – CERN EN Department / CV Group Annual Meeting of the FCC study – Rome 14 th April 2016.
Logo area HL LHC IT STRING M. Bajko CERN TE-TM and QXF Review.
FCC Infrastructure & Operation Update on the cryogenics study Laurent Tavian CERN, TE-CRG 28 October 2015.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. HL-LHC.
TDR Cryogenics Parameters Tom Peterson 28 September 2011.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
TE-CRG Activities A. Perin, on behalf on the Cryogenics Group.
Study and Development of Large Cryogenic Systems in China
CERN – Zanon discussions
Crab cavities Cryogenics progress for the SPS
HL-LHC IT STRING and Series test of SC link
M Chorowski, H Correia Rodrigues, D Delikaris, P Duda, C Haberstroh,
SLHC –PP WP6 LHC IR Upgrade - Phase I.
IT-4189 Supply and installation of a cryogenic distribution system
BA6 – crab cavity activities in EYETS
The HL-LHC Circuits: Global View and Open Questions
Innovative He cycle Francois Millet.
on behalf of the RF group
SPS cryogenic proximity equipment and SM18 validation
S. Claudet, Daniel Berkowitz & A. Perin (TE-CRG)
CRYOGENICS – strategy, unavailability root causes and limitations
Cryogenics for sc links, a short update
Hollow e- lens, Cryogenic aspects
Accelerator and Experiment Interface Session: LS2, LS3
The HL-LHC project, and associated Cryogenics
Cooling systems for HL-LHC (WP17.3)
CEPC Cryogenic System Jianqin Zhang, Shaopeng Li
on behalf of FCC cryogenic team
ESS RF Development at Uppsala University
ILC Cryogenic Systems Draft EDR Plan
UK RFD Pre-Series cryomodule
SRF Section Cuvée 2014.
ILC GDE meeting Cryogenics
Superconducting Links and Cold Powering components for HL-LHC
Cryogenic cavern in Asian site
Cooling aspects for Nb3Sn Inner Triplet quadrupoles and D1
Summary post TCC#54_02Aug’18
Laurent Delprat CERN, Geneva, Switzerland
HL-LHC New MS optimisation WP9, Preliminary cost estimates
J. Fleiter, S. C. Hopkins, A. Ballarino
Presentation transcript:

Cryogenics storage and distribution 3rd HiLumi Industry Day 22 – 23 May 2017, Warrington, UK Krzysztof Brodzinski – CERN on behalf of involved team

OUTLOOK Introduction LHC Cryogenics HiLumi upgrade Concluding remarks Distribution Storage Concluding remarks CERN - K. Brodzinski – 3rd HiLumi Industry Day – 22.05.2017 – Warrington, UK

135 tons of helium inventory Introduction LHC cryogenics: 8 x 18 kW @ 4.5 K 1800 sc magnets 24 km & 20 kW @ 1.8 K 37 000 tons @ 1.9 K 135 tons of helium inventory Magnet ring Cryo distribution circumference  ~ 27 km, constructed at ~ 100 m underground, Main HiLumi cryogenics upgrade will affect P1 and P5 for cooling of LHC matching sections and P4 for cooling of RF accelerating system. Compressor station 4.5 K refrigerator 1.8 K pumping unit (cold compressor) Interconnection box CERN - K. Brodzinski – 3rd HiLumi Industry Day – 22.05.2017 – Warrington, UK

HL-LHC configuration HL-LHC Existing LHC Q1 Q2a Corrector Package Q2b SC D1 Q3 NC D1 Existing LHC Q4 CC HL-LHC systems are entering detailed integration phase New baseline adopted to increase operating margins (Nb3Sn quadrupoles) D2 In-kind contribution and Collaborations for HW design and prototypes CERN - K. Brodzinski – 3rd HiLumi Industry Day – 22.05.2017 – Warrington, UK

HTS links Excellent results obtained for elementary part of the cable Global engineering (termination boxes, supporting) under study CERN - K. Brodzinski – 3rd HiLumi Industry Day – 22.05.2017 – Warrington, UK

Effect of the crab-cavities To increase interaction overlap Double ¼-wave: Coaxial couplers with hook-type antenna Operated at 2 K using superfluid helium CERN - K. Brodzinski – 3rd HiLumi Industry Day – 22.05.2017 – Warrington, UK

Cryogenic distribution Red – HiLumi upgrade HiLumi cryo updgrade will consist: 2 new cryoplants (~18 kW @ 4.5 K incl. ~3 kW @ 1.8 K) at P1 and P5 for high-luminosity insertions 1 new cryoplant (~4 kW @ 4.5 K) at P4 for SRF cryomodules. (Alternative under study: upgrade of 1 existing LHC cryoplant) Completely new helium cryogenic distribution between the production plants and client interfaces. HL HL P1 P2 P3 P4 P6 P7 P8 P5 P18 B A B A LL A – upgraded exLEP cryo plant B – new LHC cryogenic plant LL HiLumi LL – Low Load sector HL – High Load sector LL LL A B A HL HL B ~ 100 m of warm distribution on the surface ~ 100 m of vertical cryogenic distribution ~ 400 m of cryo transfer line in the tunnel CERN - K. Brodzinski – 3rd HiLumi Industry Day – 22.05.2017 – Warrington, UK

18kW@4.5K incl. 3kW@1.8K (integrated - mixed cycle) New insertions at P1 & P5 Hi-Lumi LHC LHC Cryogenics for new cryo-assemblies (Crab cavities (CC), insertion cryomagnets, DFBs, HTS links…) 1 warm compressor station (WCS) in noise insulated surface building 1 upper cold box (UCB) in surface building 1 cold quench buffer (QV) in surface 1 or 2 cold compressor boxes (CCB) in underground cavern 2 main cryogenic distribution lines 2 interconnection valve boxes with existing QRL (partial redundancy) 18kW@4.5K incl. 3kW@1.8K (integrated - mixed cycle) And lines, vessels, … CERN - K. Brodzinski – 3rd HiLumi Industry Day – 22.05.2017 – Warrington, UK

LHC cryo distribution in 2006 (photos) CERN - K. Brodzinski – 3rd HiLumi Industry Day – 22.05.2017 – Warrington, UK

Size of underground structures (e.g. US/UW cavern) Size defined by integration and transport studies of similar equipment existing at CERN Cooling & ventilation Safe room Transformers Ventilation & smoke- extraction ducts Cold box logo area CERN - K. Brodzinski – 3rd HiLumi Industry Day – 22.05.2017 – Warrington, UK

New insertion at P4 HL-LHC LHC Cryogenics for 800 MHz SRF cryomodules and e-lenses 1 warm compressor station (WCS) in noise insulated surface building 1 lower cold box (LCB) in UX45 cavern 1 valve box in UX45 cavern 2 main cryogenic distribution lines 2 interconnection lines with existing QRL service modules (redundancy by sector cryoplants) HL-LHC LHC CERN - K. Brodzinski – 3rd HiLumi Industry Day – 22.05.2017 – Warrington, UK

Storage system LN2: 2017 – BA6, 20m3, PN6 LN2: 2019/20 – P4, 20m3, PN6 (4 tanks) GHe operational storage: 2024 – P1 and P5, 250m3, 25bar (4 tanks) Open option (tbc) GHe quench storage with LN2 screen: 2024 – P1 and P5, 50m3, 25bar (2 tanks) CERN - K. Brodzinski – 3rd HiLumi Industry Day – 22.05.2017 – Warrington, UK

HL-LHC Cryogenics Master Schedule Major HL-LHC Cryo activities P4-RF: => specification work during 2017, for contracts by end’2017 (mid 2018) P1/P5: => 4-5 years to complete design, clarify interfaces and prepare for tendering CERN - K. Brodzinski – 3rd HiLumi Industry Day – 22.05.2017 – Warrington, UK

Concluding remarks The High-Luminosity LHC is a worldwide funded project corresponding to a 1.2 km new accelerator (advanced Nb3Sn, Crab cavities, HTS links) progressively switching to construction, with European institutes and industry heavily involved Series of qualification and testing of components foreseen in the coming years Now, civil works and global lay-out has been decided, with project fully approved. Precise evaluation of heat-loads and cryogenic architecture are being refined prior to future call for tenders. 4 contracts from cryogenics were signed with industry in 2016 with 4 different countries (SPS refrigerator – CH, cryogenic service module – UK, cryogenic valve boxes and 80 m distribution line – I, adaptation valve box for SM18 – F). Large part of the HiLumi project is done with industry and not framework collaboration between different institutions. We will need new Helium/Nitrogen storage, new refrigerators, valve boxes and hundreds meters of the distribution system… and we are here to help you selecting what could be adapted to your abilities ! CERN - K. Brodzinski – 3rd HiLumi Industry Day – 22.05.2017 – Warrington, UK

Thank you for your attention CERN - K. Brodzinski – 3rd HiLumi Industry Day – 22.05.2017 – Warrington, UK

Spare Slides CERN - K. Brodzinski – 3rd HiLumi Industry Day – 22.05.2017 – Warrington, UK

The Inner Triplet region with in-kinds HL-LHC configuration The Inner Triplet region with in-kinds The MS regions with in-kinds The Insertion Region (till Q4) logo area CERN - K. Brodzinski – 3rd HiLumi Industry Day – 22.05.2017 – Warrington, UK

What it would look like: Surface Helium Vessels Compressor station New surface buildings, shafts and caverns to be constructed, to accommodate for new Hardware to be installed LN2 storage ? One cold box CERN - K. Brodzinski – 3rd HiLumi Industry Day – 22.05.2017 – Warrington, UK

New HL-LHC surface buildings at P1 SE (Electrical distribution) SU (Cooling & ventilation) SF (Cooling & ventilation) SD (Head-shaft Building) SHM (Cryogenics) logo area CERN - K. Brodzinski – 3rd HiLumi Industry Day – 22.05.2017 – Warrington, UK

New HL-LHC surface buildings at P5 SU (Cooling & ventilation) SE (Electrical distribution) SD (Head-shaft Building) SF (Cooling & ventilation) SHM (Cryogenics) logo area CERN - K. Brodzinski – 3rd HiLumi Industry Day – 22.05.2017 – Warrington, UK

HL-LHC underground structures at P1 Based on double-decker with: vertical cores connecting to the LHC tunnel Personnel escape galleries (UPR) at both ends. UA13 P1 (ATLAS) UPR13 UL13 PM17 UR15 - No direct CE interface with Experiment structures. UA17 UL17 - Minimum distance of ~ 15 m between HL-LHC and experiment structures ~ 7 m between HL-LHC galleries and LHC tunnel (reduction of radiation & deformation impacts) UPR17 US17 UW17 logo area CERN - K. Brodzinski – 3rd HiLumi Industry Day – 22.05.2017 – Warrington, UK

HL-LHC underground structures at P5 UPR53 UA53 UL53 PM57 UR55 UA57 UL57 UPR57 P5 (CMS) US57 P1 (ATLAS) UW57 logo area CERN - K. Brodzinski – 3rd HiLumi Industry Day – 22.05.2017 – Warrington, UK