Introduction to the Theory of Constraints (TOC) & Critical Chain Project Management (CCPM) Major Mark McNabb.

Slides:



Advertisements
Similar presentations
EMBA-2, BUP Major Asad EO Chapter 5: Process Analysis.
Advertisements

THEORY OF CONSTRAINTS & DRUM – BUFFER - ROPE
Managing Processes and Capabilities CHAPTER THREE McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
Short-term Capacity Optimization
6-1 Goldratt’s Critical Chain  In 1997, Goldratt introduced the Critical Chain Project Management (CCPM) methodology to apply the theory of constraints.
OPSM 301: Operations Management Session 12: Service processes and flow variability Koç University Graduate School of Business MBA Program Zeynep Aksin.
7 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Constraint Management (Short-term Capacity Planning) 7.
Theory of Constraints Scheduling APICS PDM January 14, 2009.
Theory of Constraints Part II: TOC Concepts
March 20, Dixie Crow Symposium, Warner Robins, GA Slide 1 Critical Chain Management - Reducing Depot Maintenance Flow Days Scott R. Schultz Mercer.
Theory of Constraints. IF: Clients never changed their minds And Vendors always supply, whatever we ask for, on time, And We do not have any absenteeism.
Project Management Workshop By Jonathan W. Powell, CGFM, PMP.
1 Presentation by: Tim Sullivan CIRAS (Center for Industrial Research and Service) Iowa State University Extension.
23–1. 23–2 Chapter Twenty-Three Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Chapter 18 Synchronous Manufacturing and the Theory of Constraints
7 – 1 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall. Constraint Management 7 For Operations Management, 9e by Krajewski/Ritzman/Malhotra.
© The McGraw-Hill Companies, Inc., Synchronous Manufacturing and Theory of Constraints.
Operations Scheduling. Scheduling in a Process-Focused Environment.
Operations Management Contemporary Concepts and Cases Chapter Thirteen Scheduling Operations Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights.
1 Slides used in class may be different from slides in student pack Chapter 18 Synchronous Manufacturing and the Theory of Constraints  Goldratt’s Rules.
Ricardo Ernst Top Management Program in Logistics & Supply Chain Management (TMPLSM) Production and Operations Management 6: Theory of Constraints.
Dependent Events and Statistical Fluctuations
Introduction to the Theory of Constraints (TOC) & Critical Chain Project Management (CCPM) Major Mark McNabb.
Quick Recap.
Managing Processes and Capabilities CHAPTER THREE.
TOC 1 Theory Of Constraints. TOC 2 Theory of Constraints How does TOC differ from the conventional shop control theory? Throughput definition * Emphasis.
Course: ETLS Managing for Improved Performance Professor: George G. Gleeson Student: Kou Song.
Theory of constraints Slovak University of Technology Faculty of Material Science and Technology in Trnava.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1.
Synchronous Manufacturing and Theory of Constraints
© The McGraw-Hill Companies, Inc., Chapter 17 Synchronous Manufacturing and the Theory of Constraints.
1 Session 18 Implementation of TOC at Tosoh, SMD Laura Blum Production and Inventory Control Manager.
1 Theory of Constraints Short-term Capacity Optimization.
Theory of Constraints Part I: Introduction. Theory of Constraints (or TOC) Relatively recent development Looks at the practical aspect of making organizational.
Critical Chain Project Management. Outline Overview of Theory of Constraints Revisit conventional project management (Critical Path Management) Overview.
1 Allocating Resources to the Project Expediting a Project Fast-Tracking a Project Resource Loading Allocating Scare Resources.
Manufacturing Planning and Control
Introduction to Motion and Time Study
Chapter 16 – Project Management
McGraw-Hill/Irwin ©2009 The McGraw-Hill Companies, All Rights Reserved
Strategic Capacity Management
MODULE 3 Manufacturing Methodologies
Cost Accounting and Reporting Systems
Synchronous Manufacturing and Theory of Constraints
Drum –Buffer-Rope Skorkovský Based on : R. Holt, Ph.D., PE.
Introduction to Theory of Constraints
Analytical Tools for Process Analysis and Improvement
Critical Chain Project Scheduling
ACTIVITY PLANNING AND RISK MANAGEMENT
Synchronous Manufacturing
Constraint Management
assemble-to-order (ATO) A system that produces standard modules to be
Herbie – An Introduction to WiP Limits
Chapter 7 Capacity Planning and Management
MOSH Entry Examination and Making Safe
Material Requirements Planning (MRP)
Capacity Planning For Products and Services
Capacity Planning For Products and Services
The Goal.
Chap 11 Learning Objectives
Drum –Buffer-Rope Skorkovský Based on : R. Holt, Ph.D., PE.
SE503 Advanced Project Management
Goldratt's Theory of Constraints (TOC)
L Maximizing Resources: Applying Lean Six Sigma Principles to Your Print Operation Monday March 18, AM – 12 PM.
Production and Operations Management
“BPR AS A MEANS OF REINVENTING THE ORGANIZATION: AN OVERVIEW”
Capacity Planning For Products and Services
Theory of Constraints Part II: TOC Concepts
Synchronous Manufacturing and Theory of Constraints
Presentation transcript:

Introduction to the Theory of Constraints (TOC) & Critical Chain Project Management (CCPM) Major Mark McNabb

Principles of the Theory Of Constraints (TOC) (aka Synchronous Manufacturing) The Action You’re Proposing: --Will It Increase “Throughput”? --Will It Decrease Inventory? --Will It Decrease Operating Expense? -Goldratt- Throughput: not moving items, but “Sales”, i.e. Finished product the customer Buys

Business Rationale for Theory of Constraints (TOC) If You didn’t Sell it! Until You Sell what they worked on! Note: in this TOC context, “Sales” = Revenue from customers Minus Vendor Costs

THEORY OF CONSTRAINTS (TOC) PROCESS IDENTIFY THE CONSTRAINT (identify capacity constraints, bottlenecks) EXPLOIT THE SYSTEM CONSTRAINT (utilize & protect the bottlenecks) SUBORDINATE ALL OTHER RESOURCES TO THE CONSTRAINT (utilize non-bottlenecks only to keep pace with bottleneck flows) ELEVATE THE SYSTEM CONSTRAINT (reduce load, improve capacity & reduce variability of existing bottlenecks) 5. RETURN TO STEP 1 Sources: The Goal, by Goldratt and Cox Critical Chain, by Goldratt

Some Highlights of TOC From “The Goal”

"BOTTLENECKS PACE THE PLANT" 1. The output of upstream operations control the output of downstream operations. 2. The cycle times of all work centers varies -- this variability spreads through all downstream operations. Therefore: The maximum deviation of a preceding operation will become the starting point of a subsequent operation. Or: 1. Work Centers with excess capacity cannot work on parts they cannot get. 2. Bottlenecks cannot work on additional parts when they are already at 100% capacity. 3. Fluctuations in bottleneck outputs only make things worse. A B Output 1 per hr 100 per hr ? 100 per hr 1 per hr ?

Bottlenecks can also be created by poor management policies: A. We need to Offshore Outsource: our labor: $15/hour, theirs: $0.5/hr (Really? What about the time, costs of packaging & transportation, and Time, Sales lost when outsourced items are Unavailable, Delayed, and/or Bad?) B. We are to use our “5 Ms” at near-full capacity, that’s Efficient (BUT how long will they run Properly at that level? Are they working the most important tasks? What do you do when you need More capacity?) C. Large Work in Process and Finished Goods inventories are Good, they show as Assets on the Accounting sheets (BUT what are they Costing you, until the finished items are actually Bought?) D. Large Batches are Good, if we get a few bad items we’ll recover (BUT what do you do while waiting for Batches? What if Most items are bad?) E. If each step produces an Average of 10 items/hr, so will the Plant (Really? What is the Spread? Don’t dependent steps usually Amplify problems?) F. Improve (a) step’s Efficiency, Whole Process gets better (Really? What if That step was Not the “weakest link” in the Process “chain”?) Note: Items B-F are metrics described in “The Goal” by Goldratt & Cox

"Inventory is the Root of All Evil" T. Ohno (Toyota) E. Goldratt Always work on reducing inventory through: 1) Reducing operations set-up time 2) Reducing cycle time and its variability 3) Reducing vendor variability in terms of quality, delivery times and delivery amounts 4) Do not make unnecessary parts -- even if people and machines sit idle

DRUM BUFFER ROPE DRUM: Paces the plant (bottlenecks) BUFFER: Inventory protection for bottlenecks to ensure no stoppages ROPE: Ties everything together; material releases and assembly schedules that reflect bottleneck constraints 9470

THEORY OF CONSTRAINTS (TOC) PROCESS (As Described In “The Goal” and “Critical Chain”) IDENTIFY THE CONSTRAINT EXPLOIT THE SYSTEM CONSTRAINT --CRITICAL CHAIN PROJECT MANAGEMENT 3. SUBORDINATE ALL OTHER RESOURCES TO THE CONSTRAINT 4. ELEVATE THE SYSTEM CONSTRAINT 5. RETURN TO STEP 1

Some Project Time & Resource Concerns Working to multiple lists Not enough resources, yet shared across all projects Managers keep changing priorities, lose time taking people off jobs then restarting jobs later (multi-tasking) Difficult getting the right people at the right time assigned to the right tasks Source: NAVSEA, Pearl Harbor Naval Shipyard & IMF

Some Human Factors People perform consistently with the way they are being measured--Even if the metric is not appropriate Jobs usually start later rather than earlier -- Don’t start early, or you’ll just get to do it Over-right? When work is completed early, there’s a tendency to enhance it—So little time is saved What can go wrong will . . . (Murphy) ---Don’t most folk add time to schedule to account for this? Often have no structured methodology to lower schedule risk for tasks in progress Source: NAVSEA, Pearl Harbor Naval Shipyard & IMF

UNCERTAINTY UNLEASHES A CASCADE EFFECT Delays: “c” is delayed if either “a” or “b” is late Gains: Even if “a” or “b” finishes early, “c” cannot be started a b c Integration Dependencies Delays multiply: every small delay propagates, within and across projects Gains don’t add up: even if many tasks finish early, projects still cannot finish early Cascade Effect Resource Dependencies Within a Project A B C D E A & D are done by the same resource Delays: If A is late, not only C but also D gets delayed Gains: Even if A finishes early, resource cannot start D as has to wait for B to finish Resource Dependencies Across Projects Project 1 A B C D E H I J F G Project 2 D & H are done by the same resource Delays: If D on Project 1 is late, H on Project 2 also gets delayed as resource is stuck on D Gains: Even if D finishes early, resource cannot start H as has to wait for F to finish Source: NAVSEA, Pearl Harbor Naval Shipyard & IMF

CRITICAL CHAIN PROJECT MANAGEMENT (CCPM) Critical Chain - longest chain of dependent tasks Dependent through finish-to-start connections OR Resource dependency CCPM provides a step by step job plan of action, based on: -- Aggressive job time estimates -- Precedence network -- Resource loading and teaming -- Human nature -- Pooled safety -- Buffer management

Task duration estimates and buffer placement Aggressive Job Time Estimates, Pooled Safety and Buffer Management Task duration estimates and buffer placement 6 5 10 Project Buffer 13 AFTER 6 Feeding Buffer 6 10 10 12 BEFORE 20 12 12 Source: NAVSEA, Pearl Harbor Naval Shipyard & IMF

The Theory of Constraints (TOC) Process IDENTIFY THE CAPACITY CONSTRAINTS (BOTTLENECKS) [IDENTIFY THE CONSTRAINT] UTILIZE & PROTECT THE BOTTLENECKS [EXPLOIT THE CONSTRAINT] {RETURN TO STEP 1] UTILIZE NON-BOTTLENECKS ONLY TO KEEP PACE WITH BOTTLENECK FLOWS .[SUBORDINATE ALL OTHER RESOURCES TO THE CONSTRAINT] IMPROVE THE CAPACITY AND REDUCE THE VARIABILTY OF EXISTING BOTTLENECKS . [ELEVATE THE CONSTRAINT] ALSO Remember: TOC applies to ALL Activities– Not just Mfg